References
- Bernolak, I. (1997). Effective measurement and successful elements of company productivity: the basis of competitiveness and world prosperity, International Journal of Production Economics. 52(1-2), pp. 203-213. https://doi.org/10.1016/S0925-5273(97)00026-1
- Dozzi, S. & AbouRizk, S. (1993). Productivity in Construction, in: National Research Council (Ed.) Ottawa, Canada.
- Eastman, C., Teicholz, P., Sacks, R. & Liston, K. (2011). BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors, 2nd ed. Wiley, Hoboken, NJ, 2011.
- Fan, S., Skibniewski, M. & Hung, T. (2014). Effects of Building Information Modelling During Construction. Journal of Applied Science and Engineering, 17(2), pp. 157-166.
- Frederick S. & Mark S. (2010). Introduction to Management Science, A Modeling and Case Studies Approach with Spreadsheets, 4th Edition, McGrawHill, Chapter 11.
- Gu, N., London, K. (2010). Understanding and facilitating BIM adoption in the AEC industry. Automation in construction, 19(8), pp. 988-999. https://doi.org/10.1016/j.autcon.2010.09.002
- Halligan, D., Brown, J., Demsetz, L. & Pace, C. (1994). Action-response model and loss of productivity in construction, Journal of Construction Engineering and Management. 120(1), pp. 47-64. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:1(47)
- Ham, N. H., Ahn, B. J. & Kim, J. J. (2018). Specialty Contractor's Role and Performance Analysis for Digital Fabrication - Focusing on the case of irregular podium construction - Journal of KIBIM, 8(1), pp. 43-55. https://doi.org/10.13161/KIBIM.2018.8.1.043
- Ham, N. H. & Kim, J. J. (2015). A Case Study on BIM Operating and Performance Measurement in Construction Phase, Journal of KIBIM, 5(2), pp. 1-11. https://doi.org/10.13161/kibim.2015.5.2.001
- Han, S., Lee, S. & Pena-Mora, F. (2012). Identification and Quantification of Non-Value-Adding Effort from Errors and Changes in Design and Construction Projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000406
- Han, S., Love, P.E.D. & Pena-Mora F. (2013). A system dynamics model for assessing the impacts of design errors in construction projects. Mathematical and Computer Modelling, 57, pp. 2044-2053. https://doi.org/10.1016/j.mcm.2011.06.039
- Joseph, J. (2011). DL4436: BIM Titles & Job Descriptions: How do They Fit In Your Organizational Structure?, Autodesk University 2011 Learn. Connect. Explore.
- Khanzode, A., Fischer, M. & Reed, D. (2008). Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project. Electronic Journal of Information Technology in Construction. (Electronic Journal of Information Technology in Construction, 13, June 2008, pp. 324-342.
- Kim, E., Kim, J. & Huh, Y. (2016). A Case Study on Practical Uses of BIM in Building Construction, Journal of Architectural Institute of Korea Structure & Construction, 32(12), Serial No. 338, December 2016
- Kim, H. J., Yoo, M. Y., Kim, J. J. & Choi, C. S. (2017). Performance Analysis of BIM Labor using Case Analysis, Journal of KIBIM, 7(3), pp. 31-39.
- Kim, S., Chin, S., Han, J. & Choi, C. (2017). Measurement of Construction BIM Value Based on a Case Study of a Large-Scale Building Project. Journal of Management in Engineering, 33(6), pp. 05017005-1-05017005-10
- Korea Land and Housing Corporation (2012). New headquarters (HQ) building project of the Korea Land and Housing Corporation (KLH) Request for Proposal(RFP).
- Lahdou, R. & Zetterman, D. (2011). BIM for Project Managers : How project managers can utilize BIM in construction projects. Chalmers University of Technology. Master's Thesis 2011:104
- Lawrence, P. (1997). Workflow handbook, John Wiley & Sons, Inc. New York, NY, USA (C)1997 table of contents ISBN:0-471-96947-8
- Lee, G., Park, K. & Won, J. (2012). D3 City project - conomic impact of BIM-assisted design validation. Automation in Construction, 22, pp. 577-586. https://doi.org/10.1016/j.autcon.2011.12.003
-
Little, J.D.C. (1961). A Proof of the Queuing Formula: L=
${\lambda}W$ . Operations Research. 9(3), pp. 383-387. https://doi.org/10.1287/opre.9.3.383 - Merschbrock, C. & Munkvold, B. E. (2015). Effective digital collaboration in the construction industry-A case study of BIM deployment in a hospital construction project. Computers in Industry, 73, pp. 1-7. https://doi.org/10.1016/j.compind.2015.07.003
- Moon, S., Forlani, J., Wang, X. & Tam, V. (2016a). Productivity Study of the Scaffolding Operations in Liquefied Natural Gas Plant Construction: Ichthys Project in Darwin, Northern Territory, Australia. Journal of Professional Issues in Engineering Education and Practice. 142(4), October 2016.
- Poirier, E., Staub-French, S. & Forgues, D. (2015). Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research, Automation in Construction 58 (2015) pp. 74-84. https://doi.org/10.1016/j.autcon.2015.07.002
- Rahman, R., Alsafouri, S., Tang, P. & Ayer, S. (2016). Comparing Building Information Modeling Skills of Project Managers and BIM Managers based on Social Media Analysis. International Conference on Sustainable Design, Engineering and Construction, Procedia Engineering, 145, pp. 812 - 819.
- Rokooei, S. (2015). Building Information Modeling in Project Management: Necessities, Challenges and Outcomes. 4th International Conference on Leadership, Technology, Innovation and Business Management, Procedia - Social and Behavioral Sciences, 210, pp. 87 - 95.
- Singh, V., Gu, N. & Wang, X. (2011). A theoretical framework of a BIM-based multi-disciplinary collaboration platform. Automation in Construction, 20, pp. 134-144. https://doi.org/10.1016/j.autcon.2010.09.011
- Truong, N.K.V, Choi, Y., Kim, I., Shin, S. & Hwang, W.J. (2010). A Probabilistic Approach to Workflow Time Analysis for Business Process Management, International Journal of Human and Social Sciences, 5(12), pp. 811-815.
- Walasek, D. & Barszcz, A. (2017). Analysis of the adoption rate of Building Information Modeling [BIM] and its Return on Investment [ROI]. Procedia Engineering, 172 (2017), pp. 1227-1234. https://doi.org/10.1016/j.proeng.2017.02.144
- Zheng, L., Lu, W., Chen, K., Chau, K. & Niu, Y. (2017). Benefit sharing for BIM implementation: Tackling the moral hazard dilemma in inter-firm cooperation. International Journal of Project Management 35 (2017) pp. 393-405. https://doi.org/10.1016/j.ijproman.2017.01.006
- Zhuge, H., Cheung, T. & Pung, H. (2001). A timed workflow process model, The Journal of Systems and Software, 55(3), pp. 231-243. https://doi.org/10.1016/S0164-1212(00)00073-X
Cited by
- 특허 동시분류 네트워크 분석을 활용한 BIM 기술구조와 핵심기술 분석 vol.10, pp.2, 2018, https://doi.org/10.13161/kibim.2020.10.2.001