References
- 이강현 (2014), TBM에 적용 가능한 막장전방 예측기법 개발, 고려대학교 대학원 박사학위논문, pp.36-38.
- 지반조사기술위원회 (2004) "지반조사 연구 및 기술동향", 한국지반공학회 2004년도 발자취, pp.366-380.
- Kneib, G., Kasselm, A. and Lorenz K. (2000), "Automatic seismic prediction ahead of the tunnel machine", First Break, Vol. 18. Issue. 7, pp.295-301. https://doi.org/10.1046/j.1365-2397.2000.00079.x
- Dowden, P.B., Robinson, R.A. (2001), "Coping with boulders in soft ground TBM tunneling", Rapid Excavation and Tunneling Conference, Littleton, US, pp.961-977.
- Richter, T. (2011), "Innovative geophysical investigation technology in karstified and fractures rock formations", 1st Scientific Congress on Tunnels and Underground Structures in South-East Europe, Dubrobnik. Croatia, pp.20-21.
- Yamamoto T., Shirasagi S., Yamamoto S., Mito Y., Aoki K. (2003), "Evaluation of the geological condition ahead of the tunnel face by geostatistical techniques using TBM driving data", Tunneling and Underground Space Technology, Vol. 18, pp.213-221. https://doi.org/10.1016/S0886-7798(03)00030-0