Abstract
In this paper, Optimal operation plan through load analysis of industrial end-user is suggested. It calculated economic feasibility of ESS with detailed power lad analysis and conditions. Generally, if the latest maximum power is less than 30% of contracted power, it can not be peak shaving operation plan. and if the peak load level stays stead for 24 hours, it is difficult peak shaving for ESS. In addition to, When the peak load is occurred in summer or winter, a hybrid operation method combining the peak shaving plan and the time shift method is proposed. Therefore, When ESS is installed in industrial electrical customer, it is achieved best effect through the optimal operation plan.