Suggestion of empirical formula between FPI and specific energy through analysis of subsea tunnel excavation data

해저 터널 굴진자료 분석을 통한 FPI와 비에너지의 경험식 제시

  • Received : 2018.05.23
  • Accepted : 2018.06.14
  • Published : 2018.07.31

Abstract

The construction of subsea tunnel differs from that of inland tunnel because of high water pressure due to sea water level and difficulties to reinforce the ground under construction. Therefore, it is very important to prevent trouble in advance when the subsea tunnel is constructed. In this paper, we established lots of databases about characteristics of geological and mechanical parameters on the construction of subsea tunnel using micro slurry TBM which depth is about 60 m. The correlation analysis is conducted to confirm the effect of thrust, torque and RPM among the excavation database on the net penetration rate. Also, An empirical formula is suggested to predict the net penetration rate through the correlation analysis between FPI (Field Penetration Index) and specific energy from the subsea tunnel excavation database.

해저터널의 시공은 육상터널의 시공과 몇 가지 다른 부분이 존재하는데 지하수 이외에 해수가 존재하여 고수압을 받으며, 시공 중 지반보강이 육상터널보다 매우 어려운 점 등이 대표적이다. 그러므로 해저터널 시공 시 시공트러블 발생의 예방은 매우 중요하다. 본 고에서는 서해안 해저 약 60 m에 시공한 소형 슬러리 TBM의 굴진 성능을 분석하기 위하여 대상 지반의 지질학적 특성들과 기계적 특성들을 DB로 구축하였다. 구축한 DB 중 추력, 토크 및 RPM 등이 순굴진율에 주는 영향을 확인하고자 각 변수들 간의 상관분석을 실시하였다. 또한 구축된 DB로부터 비에너지와 FPI와의 상관관계를 분석하고 순 굴진율을 예측할 수 있는 경험식을 제시하였다.

Keywords

References

  1. Albert, T.Y. (2017), Design and construction of Hong Kong - Zhuhai - Macao bridge project, $I^{3}C$ Symposium on Infrastructural Developments, Singapore, pp. 1-39.
  2. Bieniawski, R.Z.T., Celada, B., Tardaguila, I., Rodrigues, A. (2012), "Specific energy of excavation in detecting tunnelling conditions ahead of TBMs", Tunnels & Tunnelling International, February 1, pp. 65-68.
  3. Bilgin, N., Feridunoglu, C., Tumac, D. (2005), The performance of a full face tunnel boring machine (TBM) in Tarabya (Istanbul), Talor & Francis Group, London, pp. 821-826.
  4. Burger, W., Arioglu, E. (2015), Istanbul strait road tunnel crossing: Project challenges and TBM solutions, AFTES Journees Techniques, Lyon, pp. 1-12.
  5. Celada, B., Galera, J.M., Munoz, C., Tardáguila, I. (2009), The use of the specific drilling energy for rock mass characterization and TBM driving during tunnel construction. Proceedings of the ITA-AITES World Tunnel Congress, Hungary, pp. 1-13.
  6. Copur, H., Tuncdemir, H., Bilgin, N., Dincer, T. (2001), "Specific energy as a criterion for the use of rapid excavation system in Turkish mines, Mining Technology", Vol. 110, No. 3, pp. 149-157. https://doi.org/10.1179/mnt.2001.110.3.149
  7. Hamilton, W.H., Dollinger, G.L. (1979), "Optimizing tunnel boring machine and cutter design for greater boreability", Proceedings of the Rapid Excavation and Tunneling Conference, Vol. 1, Atlanta, pp. 280-296.
  8. ITA (2001), Recommendations and guidelines for tunnel boring machines, WG.14, Techanical Tunnelling, International Tunnelling Association, pp. I1 - I8.
  9. KEPCO (2014), ${\bigcirc}{\bigcirc}$ cable tunnel geotechnical investigation report, pp. 96-151.
  10. Kim, K.Y., Lee, D.S., Cho, J., Jeong, S.S., Lee, S. (2013), "The effect of arching pressure on a vertical circular shaft", Tunnelling and Underground Space Technology, Vol. 37, pp. 10-21 https://doi.org/10.1016/j.tust.2013.03.001
  11. Lee, H.L., Song, K.I., Kim, K.Y. (2017), "Development and implementation of statistical prediction procedure for field penetration index using ridge regression with best subset selection", Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 6, pp. 857-870. https://doi.org/10.9711/KTAJ.2017.19.6.857
  12. Phil Stride (2016), Building for 22nd century London, OSLO, Tideway, pp. 1-37.
  13. RASA (2016), DHL-3500 slurry shield machine inspection report, pp. 1-12.
  14. Rostami, J. (2016), "Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground", Tunnelling and Underground Space Technology, Vol. 57, pp. 173-182. https://doi.org/10.1016/j.tust.2016.01.009
  15. Singapore Power (2018), Cable tunnel project, pp. 3-9.
  16. Teale, R. (1965), The concept of specific energy in rock drilling, International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, Vol. 2, No. 1, pp. 57-73. https://doi.org/10.1016/0148-9062(65)90022-7
  17. Townsend, B.F., Jenkins, P.E. (2009), TBM selection and specification, Mott Macdonald, pp. 1-18.