References
- Association for the Advancement of Cost Engineering (AACE) (2011). "Cost estimate classification systemas applied in engineering, procurement, and construction for the process industries." 2(18), R-97.
- Christensen, P., and Dysert, L. R. (2005). "Cost Estimate Classification System. as Applied in Engineering, Procurement, and Construction for the Process Industries." AACE International Recommended Practices.
- Crawford, R. H. (2011). "Life cycle assessment in the built environment." Spon Press.
- Elazouni, A. M., Ali, A. E., and Abdel-Razek, R. H. (2005). "Estimating the Acceptability of New Formwork Systems Using Neural Networks." Journal of Construction Engineering and Management, 131(1), pp. 33-41. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:1(33)
- Gunaydin, H. M.,, and Dogan, S. Z. (2004). "A neural network approach for early cost estimation of structural systems of buildings." International Journal of Project Management, 22, pp. 595-602. https://doi.org/10.1016/j.ijproman.2004.04.002
- Han, H., Kim, J. H., Yoon, J. H., and Seo, J. W. (2011). "Road Construction Cost Estimation Model in the Planning Phase Using Artificial Neural Network." Journal of the Korean Society of Civil Engineering, KSCE, 31(6), pp. 829-837.
- Huang, G. (2003). "Learning capability and storage capacity of two-hidden-layer feedforward networks." IEEE Trans. Neural Networks, 14(2), pp. 274-281. https://doi.org/10.1109/TNN.2003.809401
- ISO (2006). "Environmental Management- Life Cycle Assessment- Principles and Framework." ISO: Geneva, Switzerland.
- Jeong, K., Ji, C., Hong, T., and Park, H. S. (2015). "A model for predicting the environmental impacts of educational facilities in the project planning phase." Journal of cleaner production, 107, pp. 538-549. https://doi.org/10.1016/j.jclepro.2014.01.027
- Kang, M., and Park, H. (2013). "A Study of the Combination Method for Earthwork Equipments Using the Environmental Loads and Costs." Journal of the Korean Society of Civil Engineering, KSCE, 33(3), pp. 1215-1224. https://doi.org/10.12652/Ksce.2013.33.3.1215
- Kim, B. S. (2010). "The approximate cost estimating model for railway bridge project in the planning phase using CBR method." Journal of the Korean Society of Civil Engineering, KSCE,, 15(7), pp. 1149-1159.
- Kim, K. J., Yun, W. G., Cho, N., and Ha, J. (2017). "Life cycle assessment based environmental impact estimation model for pre-stressed concrete beam bridge in the early design phase." Environmental Impact Assessment Review, 64, pp. 47-56. https://doi.org/10.1016/j.eiar.2017.02.003
- Kim, M., Moon, H., and Kang, L. (2013). "Development of an Approximate Cost Estimating Model for Bridge Construction Project using CBR Method." Korean Journal of Construction Engineering and Management, KICEM, 14(3), pp. 42-52. https://doi.org/10.6106/kJCEM.2013.14.3.042
- Koo, C., Hong, T., and Hyun, C. (2011). "The development of a construction cost prediction model with improved prediction capacity using the advanced CBR approach." Expert Systems with Applications, 38(7), pp. 8597-8606. https://doi.org/10.1016/j.eswa.2011.01.063
- Lee, K., and Yang J. (2009). "A Study on the Functional Unit Estimation of Energy Consumption and Carbon Dioxide Emission in the Construction Materials." Journal of the Architectural Institute of Korea Planning & Design, 25(6), pp. 43-50.
- Lowe, D. J., Emsley, M. W., and Harding, A. (2006). "Predicting construction cost using multiple regression techniques." Journal of Construction Engineering and Management, 132(7), pp. 750-758. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(750)
- Moon, H., Hyun, C., and Hong, T. (2014). "Prediction Model of CO2 Emission for Residential Buildings in South Korea." Journal of Management in Engineering, 30(3), pp. 04014001 : 1-04014001 : 7.
- Park, K., Hwang, Y., Seo, S., and Seo, H. (2003). "Quantitative Assessment of Environmental Impacts on Life Cycle of Highways." Journal of Construction Engineering and Management, 129(1), pp. 25-31. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:1(25)
- Suthaharan, S. (2015). "Machine Learning Models and Algorithms for Big Data Classification." Springer.
- Sonmez, R. (2008). "Parametric range estimating of building costs using regression models and bootstrap." Journal of Construction Engineering and Management, 134(12), pp. 1011-1016. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:12(1011)
- Trost, S. M., and Oberlender, G. D. (2003). "Predicting Accuracy of Early Cost Estimates Using Factor analysis and Multivariate Regression." Journal of construction engineering and management, 129(2), pp. 198-204. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:2(198)
- Wang, X., Duan, Z., Wu, L., and Yanga, D. (2015). "Estimation of carbon dioxide emission in highway construction: a case study in southwest region of China." Journal of Cleaner Production, 103, pp. 705-714. https://doi.org/10.1016/j.jclepro.2014.10.030
- Woo, J. (2011). "Sustainable Optimum Design Evaluation System Development by Environmental and Economical Efficiency of Life Cycle of the Apartment Houses." Ph.D. thesis, Hanyang University.
- Yun, W. G., Ha, J. K., and Kim, K. J. (2017). "An Analysis of the Characteristics of Standard Work and Design Information on Estimating Environmental Loads of PSC Beam Bridge in the Design Phase." Journal of the Korean Society of Civil Engineering, KSCE, 37(4), pp. 705-716.