Guideline for Tunnelling Risk Management

제2강 터널공사 리스크 관리 가이드라인

  • Published : 2018.12.24

Abstract

Keywords

References

  1. 글로벌 터널 설계 엔지니어링 실무, 2016, 김영근, 시아이알
  2. Soren Degn Eskesen, Per Tengborg, Jorgen Kampmann, Trine Holst Veicherts, Guidelines for tunnelling risk management: ITA WG 2, 2004
  3. Eric Leca, Soren Degn Eskesen, ITA WG2 - Guidelines for Tunnelling Risk Assessment, 2006
  4. Lichtenberg, S., 2000. Proactive Management of Uncertainty Using the Successive Principle. Polyteknisk Forlag, Copenhagen.
  5. Sturk, R., 1998. Engineering geological information -. Its value and impact on tunnelling. Doctoral Thesis at Royal Institute of Technology, Stockholm.
  6. Einstein, H.H., 1996. Risk and risk analysis in rock engineering. Tunnelling and Underground Space Technology 11 (2), 141-155. https://doi.org/10.1016/0886-7798(96)00014-4
  7. Eskesen S.D., Kampmann J., 2000. Risk reduction strategy in urban tunnelling: experience from the Copenhagen Metro. In: ITA World Tunnel Congress, Tunnels under Pressure, Durban, 2000.
  8. Isaksson, M.T., Reilly, J.J., Anderson, J.M., 1999. Risk mitigation for tunnel projects -. A structured approach. In: Alten, et al., (Eds.), Proceedings Challenges for the 21st Century. Balkema, Rotterdam.
  9. Reilly, J.J., 2000. The management process for complex underground and tunnelling projects. Tunnelling and Underground Space Technology 15 (1), 31-44. https://doi.org/10.1016/S0886-7798(00)00026-2
  10. Tonon, F., Bernardini, A., Mammino, A., 2002. Multiobjective optimization under uncertainty in tunnelling: application to the design of tunnel support/reinforcement with case histories. Tunnelling and Underground Space Technology 17 (1), 33-54. https://doi.org/10.1016/S0886-7798(02)00002-0