References
- 글로벌 터널 설계 엔지니어링 실무, 2016, 김영근, 시아이알
- Soren Degn Eskesen, Per Tengborg, Jorgen Kampmann, Trine Holst Veicherts, Guidelines for tunnelling risk management: ITA WG 2, 2004
- Eric Leca, Soren Degn Eskesen, ITA WG2 - Guidelines for Tunnelling Risk Assessment, 2006
- Lichtenberg, S., 2000. Proactive Management of Uncertainty Using the Successive Principle. Polyteknisk Forlag, Copenhagen.
- Sturk, R., 1998. Engineering geological information -. Its value and impact on tunnelling. Doctoral Thesis at Royal Institute of Technology, Stockholm.
- Einstein, H.H., 1996. Risk and risk analysis in rock engineering. Tunnelling and Underground Space Technology 11 (2), 141-155. https://doi.org/10.1016/0886-7798(96)00014-4
- Eskesen S.D., Kampmann J., 2000. Risk reduction strategy in urban tunnelling: experience from the Copenhagen Metro. In: ITA World Tunnel Congress, Tunnels under Pressure, Durban, 2000.
- Isaksson, M.T., Reilly, J.J., Anderson, J.M., 1999. Risk mitigation for tunnel projects -. A structured approach. In: Alten, et al., (Eds.), Proceedings Challenges for the 21st Century. Balkema, Rotterdam.
- Reilly, J.J., 2000. The management process for complex underground and tunnelling projects. Tunnelling and Underground Space Technology 15 (1), 31-44. https://doi.org/10.1016/S0886-7798(00)00026-2
- Tonon, F., Bernardini, A., Mammino, A., 2002. Multiobjective optimization under uncertainty in tunnelling: application to the design of tunnel support/reinforcement with case histories. Tunnelling and Underground Space Technology 17 (1), 33-54. https://doi.org/10.1016/S0886-7798(02)00002-0