과제정보
연구 과제 주관 기관 : 산업안전보건연구원
참고문헌
- Chan, DWM., & Kumaraswamy, MM. (1997). A comparative study of causes of time overruns in Hong Kong construction projects, International Journal of Project Management, 15(1), 55-63. https://doi.org/10.1016/S0263-7863(96)00039-7
- Cho, GC. (2012). Tunnel excavation methods suitable for reduction of construction period. Korean Society of Civil Engineers Magazine, 60(11), 30-39.
- Han, SH., Yoon, SM., & Lee, SH. (2006). Exploring delays of the mega construction project : the case of Korea high speed railway. KSCE Journal of Civil Engineering, 26(5), 839-848.
- Mehdizadeh, R., Breysse, D., Taillandier, F., & Niandou, H. (2011). Advanced methodology of risk breakdown structure developing for risk management of tunneling and construction projects. Proceeding of the 29th congress of AUGC.
- No, SL., Noh, SH., Lee, SP., & Seo, JW. (2006). Construction of long and large twin tube tunnel in Korea - Sapaesan tunnel. Tunnelling and Underground Space Technology, 21(3), 393. https://doi.org/10.1016/j.tust.2005.12.204