Challenges of decarbonizing electricity in Indonesia: Barriers in the adoption of solar PV

  • Published : 2018.12.31

Abstract

Around the world, there are increasing efforts underway to decarbonize the electricity generation system to mitigate the environmental impacts including climate change. While Indonesia has a huge potential for new and renewable energy, particularly solar photovoltaic, Indonesia has been largely dependent on fossil fuels. As of 2017, the installed capacity for solar photovoltaic in Indonesia was 78.5MW and this was only 0.04% of the theoretical solar potential, which is around 207.9GW($4.8kWh/m^2/day$). With the case of solar photovoltaic, this paper examined the reasons of low adoption of the technology and the challenges of energy transition in Indonesia from the policy and institutional perspectives.

Keywords

References

  1. Lakin 2017 Directorate General of Electricity Energy and Mineral Resources Ministry report.
  2. Constitution No 30 of year 2007 on Energy.
  3. Constitution No 16 of year 2016 on Paris Agreement commitment.
  4. Constitution No 61 of year 2011 on Real Act Plan on Greenhouse gas emissions.
  5. President Regulation No 22 of year 2017 on National Energy General Plan.
  6. Electric Power Provisions General Plan year 2018-2027(RUPTL 2018-2027).
  7. Riza muhida, Aman Mostavan, Wahyu Sujatmiko, Minwon Park, Kenji Matsuura. 2001 The 10 years operation of a PV-micro-hydro hybrid system in Taratak, Indonesia.
  8. Constitution No 79 of year 2014 on National Energy Policy.
  9. New and renewable energy directorate general of MEMR workshop presentation April 24th, 2018.
  10. MEMR Regulation No 10 of 2017 on Power Purchased Agreement.
  11. Ministry of Finance state budget expenditure support in new and renewable energy presentation, April 24th, 2018.
  12. http://www.worldstopexports.com/coal-exports-country/12, Accessed July 2017.
  13. EY, RECAI, Renewable Energy Country Attractiveness Index 2016.
  14. PWC, 2016 Indonesian Infrastructure.
  15. Ministry of Industry No 54 of 2012 and MoI No 5 of 2017.
  16. Ministry of Industry No 15 of 2011 and No 16 of 2011.
  17. Nugent Daniel, Benjamin K Sovacool, 2013 Assessing the lifecycle greenhouse emissions from solar PV and wind energy: A critical meta-survey.
  18. Agrawal K. Kr, Jain S, Jain A. Kr, Dahiya S 2013, Assestment of greenhouse gas emissions from coal and natural gas thermal power plants using life cycle approach.
  19. Bridle Richard, Phillip Gass, Halimajaya Aidy, Lontoh Lucky, McCulloh Neil, Ptrofsky Erica, Sanchez Lourdes 2018, Missing the 23% target: roadblocks to the development of new and renewable energy in Indonesia.
  20. Marjan Bashiri, Ebramimi Shabnam, Maryam Fazlali, Seyed Jamshid H, Narges Jamal, Parviz Salehvand, 2011. Analytical comparison between BOT, BOOT, and PPP project delivery systems.