참고문헌
- Ahn, S. H., Choi, H. J., and Yu, J. H. (2017). "Analysis of Construction Dispute Cases Considering Reward Ratio Focused on Arbitration Cases of Korean Commercial Arbitration Board." Korean Journal of Construction Engineering and Management, KICEM, 18(4), pp. 48-56. https://doi.org/10.6106/KJCEM.2017.18.4.048
- Cho, E. S., and Hwang, I. S. (2008). "The Effective Criteria for Determ ining the Number of Cluster : An Application with SPSS and Microsoft Excel." Commodity Research, Korea Academy of Commodity Science & Technology, 26(1), pp. 1-9.
- Cho, S. B. (2012). "A Research on Solutions and Cause relate to the Conflict of Constructions for Power Transmission Facilities : A Case Study on the pass area of Milyang-city in South Korea." Journal of Public Society, 2(2) pp. 128-168.
- Choi, H. S. (2012). "A Study on the Influencing Factors of Location Conflicts by Types of Non-preferred Facilities." Journal of the Korean Urban Management Association, 25(4), pp. 123-151.
- Cotton, M. (2015). "Stakeholder perspectives on shale gas fracking: a Q-method study of environmental discourses." Environment and Planning A, 47(9), pp. 1944-1962. https://doi.org/10.1177/0308518X15597134
- Eom, E. H. (2012). "Spatialities of Environmental (In) justice and Politics of Scales through the electricity transmission tower conflicts in Miryang." Korea. Space and Environment, 42, pp. 51-91.
- Eun, J. H. (2011). "Military Bases Siting Conflict Analysis: Study of Contrasting Cases Through Discourse Analysis." Korean Public Administration Review, 45(4), pp. 55-85.
- Ha, H. Y. (2007). "Analysis on Critical Factors of Conflict Resolution in Public Sectors: Focused on the Effect of Major Factors in the Conflict Management." Korean Public Administration Review, 41(3), pp. 273-296.
- Ham, Y. S., and Hyun, S. H. (2013). "Analysis of Conflict Adjustment Process for the Selection of Location of Non-Favorable Facilities in Local Government : Focused on Case of Seoul Memorial Park and Ulsan Memorial Park." Journal of Governmental Studies, Korea University Research Center of Government Studies, pp. 451-492.
- Hartigan, J. A., and Wong, M. A. (1979). "Algorithm AS136: A K-Means Clustering Program." Applied Statistics, 28(1), pp. 100-108. https://doi.org/10.2307/2346830
- Hong, S. M., and Park, H. Y. (2006). "A Study on the Generation and Amplification Factors of Public Policy Conflict." Proceedings of Korean Public Administration Conference, pp. 903-918.
- Hyundai Research Institute (HRI) (2016). Weekly Economic Review. 16. 45.
- Jeong, D. R., Yu, B. G., and Kim, J. J. (2005). "Classifying Strategic Types Through Strategic Group Analysis In Construction Industry." Korean Journal of Construction Engineering and Management, KICEM, 6(2), pp. 102-110.
- Jeong, H. S., Lee, C. H., and Kim, Y. M. (2005). "Status of Environmental Conflict and Policy Tasks." National Research Council for Economics, Humanities and Social Sciences, pp. 205-251, 271-308.
- Jeong, J. H. (2007). "The Rationality of Location Policy Making on the Dangerous Facilities: Focusing on Siting Radioactive Waste Disposal Facilities." The Korean Journal of Local Government Studies, 11(2), pp. 153-173.
- Jiang, H., Lin, P., and Qiang, M. (2015). "Public-Opinion Sentiment Analysis for Large Hydro Projects." Journal of Construction Engineering and Management, 142(2), pp. 1-12
- Kim, H. J., and Heo, J. (2013). Statistical analysis and interpretation using SPSS 21.0, 1st ed, TOPBOOKS, Seodaemoon, pp. 404-405.
- Kim, H. R., and Choi, J. S. (2009). "A study on the types of conflict resolution and mediation in the public conflicts." Proceedings of Korean Public Administration Conference, pp. 319-335.
- Kim, S. H. (2016). Analysis of multivariate data, 1st edition, Bubmoonsa, Paju, pp. 188-189.
- Lattin, J. M., Carroll, J. D., and Green, P. E. (2002). Analyzing Multivariate Data, 1st ed, Brooks/Cole, USA, pp. 302-303.
- Lee, C., Won, J. W., Jang, W., Jung, W., Han, S. H., and Kwak, Y. H. (2017). "Social conflict management framework for project viability: Case studies from Korean megaprojects." International Journal of Project Management, 35(8), pp. 1683-1696. https://doi.org/10.1016/j.ijproman.2017.07.011
- Lee, J. Y. (2006). "A Comparative Study on the Conflict Management between Cheonggyecheon Restoration Project and Busan Disclose Project." Graduate School of Policy Science, Ewha Womans University, pp. 32-44.
- Lee, M. C. (2010). "A Study on Conflict in the Construction of Yangsan Route in the Seoul-Busan High-Speed Railway." Graduate School of University of Ulsan, pp. 48-69.
- Lee, R. N., and Lee, H. K. (2012). "Estimate the Period and Cost of Projects by Estimating the Conflict Index - Concentrated on the Apartment Reconstruction Project -." Korean Journal of Construction Engineering and Management, KICEM, 13(1), pp. 87-94. https://doi.org/10.6106/KJCEM.2012.13.1.087
- Lee, S. J., Moon, J. H., Chang, E. G., Park, H. S., Kim, G. M., and Kim, J. S. (2012). "Determinants of Public Conflict Resolution in Regional Development Projects." The Korea Spatial Planning Review, pp. 195-220.
- Lee, S. W., Kim, K. G., Shim, J. S., Ryu, D. A., Cho, K . H., Kim, J. S., and Park, H. J. (2015). "Exploratory research for the development of public conflict checklist : Focusing on prevention and diagnosis of public conflict." Journal of local government studies, 27(2), pp. 319-343. https://doi.org/10.21026/jlgs.2015.27.2.319
- Lee, Y. H. (2013). "A Study on the Cause and Resolution of Public Conflicts." Korean Public Management Review, 27(1), pp. 1-26.
- Li, T. H., Ng, S. T., and Skitmore, M. (2013). "Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach." Automation in construction, 29, pp. 123-135. https://doi.org/10.1016/j.autcon.2012.09.007
- Mok, K. Y., Shen, G. Q., and Yang, J. (2015). "Stakeholder management studies in mega construction projects: A review and future directions." Internaional Journal of Project Management, 33(2), pp. 446-457. https://doi.org/10.1016/j.ijproman.2014.08.007
- National Assembly Fact-finding Committee for Jeju Naval Base (2011). Jeju Naval Base Report, pp. 60-88.
- Ogunlana, S. O. (2010). "Beyond the 'iron triangle': Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects." International journal of project management, 28(3), pp. 228-236. https://doi.org/10.1016/j.ijproman.2009.05.005
- Olander, S. (2007). "Stakeholder impact analysis in construction project management." Construction management and Economics, 25(3), pp. 277-287. https://doi.org/10.1080/01446190600879125
- Olander, S., and Landin, A. (2008). "A comparative study of factors affection the external stakeholder management process." Construction management and economics, 26(6), pp. 553-561. https://doi.org/10.1080/01446190701821810
- Paek, J. S. (2002). "A Study on the Memorial Park in Seoul Metropolitan." Korean Society and Public Administration, 13(2), pp. 191-216.
- Park, C. G. (1999). "A study on the Conflict Adjustment between Local Government - Focused on the Case of Wichon Industrial Complex -." Graduate School of Economics, Gwangju University, pp. 53-67.
- Park, H. S. (2017). Multivariate data analysis, 1st edition, Freedom Academy, Paju, pp. 273-284.
- Park. H. S., Gam, S. W., Lee, S. J., Jang, E. G., and Kim, G. G. (2007). "Conflict indicators and their practical application in public works." Korea Research Institute for Human Settlements (KRIHS), pp. 17-59.
- Yeo, K. H., and Choi, G. H. (2012). "A Study on the Conflict Structure and Conflict Causes in the Urban edevelopment Projects : Focusing on the 4th Yongsan Region, Seoul." Journal of The Korean Regional Development Association, 24(2), pp. 67-87.
- Yim, J. B. (2007). "A Study on the Conflict Management Strategy between Local Government through a Comparative Analysis of NIMBY and PIMFY." The Korean Journal of Local Government Studies, 11(3), pp. 155-179.