Acknowledgement
Supported by : 한국연구재단
References
- Burguess, A. & Killebrew, J. (1962). Variation in activity level on a cyclic arrow diagram. Journal of Industrial Engineering, 13(2), 76-83.
- Easa, S. M. (1989). Resource leveling in construction by optimization. Journal of construction engineering and management, 115(2), 302-316. https://doi.org/10.1061/(ASCE)0733-9364(1989)115:2(302)
- Elbeltagi, E. Hegazy, T. & Grierson, D. (2005). Comparison among five evolutionary-based optimization algorithms. Advanced engineering informatics, 19(1), 43-53. https://doi.org/10.1016/j.aei.2005.01.004
- El-Rayes, K. & Jun, D. H. (2009). Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), 1172-1180. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000097
- Damci, A. & Polat, G. (2014). Impacts of different objective functions on resource leveling in construction projects: a case study. Journal of Civil Engineering and Management, 20(4), 537-547. https://doi.org/10.3846/13923730.2013.801909
- Harris, R. (1978). Precedence and Arrow Networking Techniques for Construction. Wiley, New York.
- Hegazy, T. (1999). Optimization of resource allocation and leveling using genetic algorithms. Journal of construction engineering and management, 125(3), 167-175. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(167)
- Hendrickson, C. & Au, T. (1989). Project management for construction, Prentice Hall, Pittsburgh, PA.
- Hiyassat, M. A. S. (2000). Modification of minimum moment approach in resource leveling. Journal of Construction Engineering and Management, 126(4), 278-284. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:4(278)
- Hiyassat, M. A. S. (2001). Applying modified minimum moment method to multiple resource leveling. Journal of Construction Engineering and Management, 127(3), 192-198. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(192)
- Jun, D. & El-Rayes, K. (2012). Multiobjective optimization of resource leveling and allocation during construction scheduling, Journal of Construction Engineering and Management, 137(12), 1080-88. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000368
- Keane, P. J. & Caletka, A. F. (2015). Delay analysis in construction contracts. John Wiley & Sons, New York.
- Leu, S. S. & Hung, T. H. (2002). An optimal construction resource leveling scheduling simulation model. Canadian Journal of Civil Engineering, 29(2), 267-275. https://doi.org/10.1139/l02-007
- Li, X. J. Gwak, H. S. & Lee, D. E. (2017). Computational Method for Selecting Optimal Activity Acceleration Methods. Journal of the Architectural Institute of Korea Structure & Construction, 33(6), 57-66 https://doi.org/10.5659/JAIK_SC.2017.33.1.57
- Mattila, K. G. & Abraham, D. M. (1998). Resource leveling of linear schedules using integer linear programming. Journal of Construction Engineering and Management, 124(3), 232-244. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:3(232)
- Pagnoni, A. (2012). Project engineering: computer-oriented planning and operational decision making. Springer Science & Business Media.
- Ponz‐Tienda, J. L. Salcedo‐Bernal, A. & Pellicer, E. (2017a). A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags. Computer‐Aided Civil and Infrastructure Engineering. 32(6), 474-498. https://doi.org/10.1111/mice.12233
- Ponz-Tienda, J. L. Salcedo-Bernal, A. Pellicer, E. & Benlloch-Marco, J. (2017b). Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags. Automation in Construction, 77, 82-92. https://doi.org/10.1016/j.autcon.2017.01.018
- Senouci, A. B. & Eldin, N. N. (2004). Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), 869-877. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(869)
- Yeniocak, H. (2013). An efficient branch and bound algorithm for the resource leveling problem. Ph.D. dissertation, Middle East Technical University.