References
- Arai, Y., Koizumi, A., Umano, H., Ashida, H., Ozaki, M., and Yoshida, E. (2009). Statistical analysis of the corrosion of water distribution pipes under their environmental factors, J. Jpn. Soc. Civ. Eng. Environ. Syst. Res, 37 (37), 9-17.
- Christodoulou, S. (2011). Water network assessment and reliability analysis by use of survival analysis, Water Resour. Manag., 25 (4), 1229-1238. https://doi.org/10.1007/s11269-010-9679-8
- Herz, R. K. (1996). Ageing process and rehabilitation needs of drinking water distribution networks, J. Water Supply Res. T., 45 (5), 221-231.
- Hong, H. P., Allouche, E. N. and Trivedi, M. (2006). Optimal scheduling of replacement and rehabilitation of water distribution systems, J. Infrastruct. Syst., 12 (3), 184-191. https://doi.org/10.1061/(ASCE)1076-0342(2006)12:3(184)
- KDI(Korea Development Institute), (2008). General Guidelines for Conducting Preliminary Feasibility Research (4th edition), pp.107.
- Kim, K., Kim, M., Choi, S. and Koo, J. (2014). A study on economic evaluation for pipeline renewal using contingent valuation method and forecasting future pipeline burst, Procedia Eng., 89, 870-877. https://doi.org/10.1016/j.proeng.2014.11.519
- Kim, K., Kim, M., Seo, J. and Koo, J. (2016). Renewal prioritization of multi-regional water supply pipelines through water supply risk assessment, Water Sci. Technol. - W. Sup., 16 (2), 506-515. https://doi.org/10.2166/ws.2015.162
- KOTI(Korea Transport Institute), (2012). Research of National Transport Demand, pp.359.
- K-water, (2014), Validation Review of Optimal Renewal Period for Multi-regional Water Supply Pipelines, pp.4-71.
- MOE(Ministry of Environment), (2016). 2015 Statistics of Waterworks.
- MOLIT(Ministry of Land, Infrastructure and Transport), (2014a). Investment Evaluation Guideline of Stabilization Project for Multi-regional Water Supply and Industrial Water Supply. p.Appendix.3.
- MOLIT(Ministry of Land, Infrastructure and Transport), (2014b). Statistics of Transport.
- MOLIT(Ministry of Land, Infrastructure and Transport), (2015). Waterworks Maintenance Basic Plan for Multi-regional Water Supply and Industrial Water Supply.
- Park, S. and Loganathan, G. V. (2002). Optimal pipe replacement analysis with a new pipe break prediction model, J. Korean Soc. Water Wastewater, 16 (6), 710-716.
- Pelletier, G., Mailhot, A., and Villeneuve, J. P., (2003). Modelling water pipe breaks - three case studies, J. Water Resour. Plann. Manage., 129 (2), 115-123. https://doi.org/10.1061/(ASCE)0733-9496(2003)129:2(115)
- Shamir, U. and Howard, C. D. D. (1979). An analytic approach to scheduling pipe replacement, J. Am. Water Works Ass., 71 (5), 248-258.
- USEPA(Environmental Protection Agency), (2012). Condition Assessment Technologies for Water Transmission and Distribution Systems (EPA/600/R-12/017). pp.87.
- Walski, T. M. (1987). Replacement rules for water mains, J. Am. Water Works Ass., 79 (11), 33-37.
- Wang, C. W., Niu, Z. G., Jia, H. and Zhang, H. W. (2010). An assessment model of water pipe condition using Bayesian inference. J. Zhejiang Univ. Sc. A, 11 (7), 495-504. https://doi.org/10.1631/jzus.A0900628
- Watson, T. G., Christian, C. D., Mason, A. J., Smith, M. H. and Meyer, R. (2004). Bayesian-based pipe failure model. J. Hydroinform., 6 (4), 259-264. https://doi.org/10.2166/hydro.2004.0019