A Database to Estimate TBM Manufacturing Specifications and Its Statistical Analysis

TBM 제작 사양을 추정하기 위한 데이터베이스의 구축과 통계분석

  • 장수호 (한국건설기술연구원 지반연구소) ;
  • 박병관 (과학기술연합대학원대학교(UST) 지반신공간공학 전공) ;
  • 이철호 (한국건설기술연구원 지반연구소) ;
  • 강태호 (한국건설기술연구원 지반연구소) ;
  • 배규진 (한국건설기술연구원 지반연구소) ;
  • 최순욱
  • Received : 2017.09.28
  • Accepted : 2017.10.23
  • Published : 2017.10.31

Abstract

Generally, TBM specifications have been empirically designed by the know-hows of its manufacturers. Since they govern the excavation performance and the cost of TBMs, it is very crucial to reliably determine them in the design stage of TBMs. In this study, a database consisting of TBM data collected from a various kinds of TBM tunnel projects was built to propose the statistical correlations for estimating TBM main specifications. From the statistical analyses, TBM outer diameters are found to have a strong effect on the TBM specifications such as thrust, torque and cutterhead driving power, which are much more important than TBM types and ground conditions.

TBM의 제작 사양은 제작사들의 노하우에 의해 경험적으로 설계되고 있다. TBM 제작 사양은 TBM의 굴착성능과 가격을 좌우하기 때문에, TBM의 설계 단계에서 이를 데이터에 근거하여 결정하는 것이 매우 중요하다. 따라서 본 연구에서는 다양한 현장에서 사용된 TBM들의 정보를 수집하여 데이터베이스를 구축하였고, 이를 통계적으로 분석하여 TBM의 제작 사양을 추정하기 위한 상관관계들을 제시하고자 하였다. 분석 결과, TBM 최대 추력, 최대 토크, 공칭 토크 및 커터헤드 구동 동력과 같은 TBM의 최대 제작 용량은 지반조건이나 TBM의 형식보다는 TBM의 외경, 즉 TBM의 굴착단면적에 지배적인 영향을 받는 것으로 파악되었다.

Keywords

References

  1. Acaroglu, O., 2011, Prediction of thrust and torque requirements of TBMs with fuzzy logic models, Tunnelling and Underground Space Technology, 26, 267-275. https://doi.org/10.1016/j.tust.2010.10.001
  2. Avunduk, E. and H. Copur, 2018, Empirical modeling for predicting excavation performance of EPB TBM based on soil properties, Tunnelling and Underground Space Technology, 71, 340-353. https://doi.org/10.1016/j.tust.2017.09.016
  3. Chang, S.-H., Choi, S.-W., Lee, G.-P. and G.-J. Bae, 2011b, Rock TBM design model derived from the multi-variate regression analysis of TBM driving data, Journal of Korean Tunnelling and Underground Space Association, 13, 531-555.
  4. Chang, S.-H., Lee, G.-P., Choi, S.-W. and G.-J. Bae, 2011a, State of the Art of Segment Lining in Shield Tunnel and Statistical Analysis of Its Key Design Parameters, Tunnel & Underground Space, 21, 427-438.
  5. Cho, J.-W., Jeon, S., Jeong, H.-Y. and S.-H. Chang, 2013, Evaluation of cutting efficiency during TBM disc cutter excavation within a Korean granitic rock using linear-cutting-machine testing and photogrammetric measurement, Tunnelling and Underground Space Technology, 35, 37-54. https://doi.org/10.1016/j.tust.2012.08.006
  6. Copur, H., Aydin, H., Bilgin, N., Balci, C., Tumac, D. and C. Dayanc, 2014, Predicting performance of EPB TBMs by using a stochastic model implemented into a deterministic model, Tunnelling and Underground Space Technology, 42, 1-14. https://doi.org/10.1016/j.tust.2014.01.006
  7. Geng, Q., Wei, Z., Meng, H and F.J. Macias, 2016, Mechanical performance of TBM cutterhead in mixed rock ground conditions, Tunnelling and Underground Space Technology, 57, 76-84. https://doi.org/10.1016/j.tust.2016.02.012
  8. Gertsch, R., Gertsch, L. and J. Rostami, 2007, Disc cutting tests in Colorado Red Granite: Implications for TBM performance prediction, International Journal of Rock Mechanics and Mining Sciences, 44, 238-246. https://doi.org/10.1016/j.ijrmms.2006.07.007
  9. Gonzalez, C., Arroyo, M. and A. Gens, 2016, Thrust and torque components on mixed-face EPB drives, Tunnelling and Underground Space Technology, 57, 47-54. https://doi.org/10.1016/j.tust.2016.01.037
  10. Howarth, D.F., 1994, Database of TBM projects undertaken between 1950 and 1990 and an assessment of associated ground-strength limitations, Tunnelling and Underground Space Technology, 9, 209-213. https://doi.org/10.1016/0886-7798(94)90032-9
  11. KICT (Korea Institute of Civil Engineering and Building Technology), 2015, Development of optimized TBM cutterhead design method and high-performance disc cutter, Final Report, ISBN 979-11-954377-2-6.
  12. Park, Y.-T., Choi, S.-W., Park, J.-H., Lee, C. and S.-H. Chang, Excavation Mechanism of Roadheader and Statistical Analysis of its Key Design Parameters Based on Database, Tunnel & Underground Space, 23, 428-441. https://doi.org/10.7474/TUS.2013.23.5.428
  13. Rostami, J. and L. Ozdemir, 1993, A New Model for Performance Prediction of Hard Rock TBMs, Proc. of Rapid Excavation and Tunneling Conference(RETC), Boston, USA, 793-809.
  14. Salimi, A., Rostami, J., Moormann, C. and A. Delisio, 2016, Application of non-linear regression analysis and artificial intelligence algorithms for performance prediction of hard rock TBMs, Tunnelling and Underground Space Technology, 58, 236-246. https://doi.org/10.1016/j.tust.2016.05.009
  15. Shahriar, K., Sharifzadeh, M. and J.K. Hamidi, 2008, Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions, Tunnelling and Underground Space Technology, 23, 318-325. https://doi.org/10.1016/j.tust.2007.06.012
  16. Wittke, W., 2007, Stability Analysis and Design for Mechanized Tunneling, WBI-Print 6, WBI GmbH, Aachen, Germany.
  17. Yagiz, S. and H. Karahan, 2015, Application of various optimization techniques and comparison of their performances for predicting TBM penetration rate in rock mass, International Journal of Rock Mechanics and Mining Sciences, 80, 308-315. https://doi.org/10.1016/j.ijrmms.2015.09.019