Abstract
It has become important for unutilized energy to be used for air conditioning of building. Economic evaluation on energy system by using treated sewage water as heat source, which is one of unutilized energy, was performed. The floor area of the subject building and the distance between heat source equipment and sewage treatment plant was assumed $30,000m^2$ and 200m. Absorption chiller-heater system was used for comparing to the energy efficient system, and payback period method was applied to carry out economic evaluation. Although the operating cost of this system is reduced compared to general heat source system, the ratio is not meaningful compared to the initial investment cost increase, and payback period was calculated to be about 36.1 years. However, when calculated based on the 2014 rate of electricity and city gas, it will be greatly reduced to 3.1 years. International commodity prices are constantly changing, and therefore national policy on the spread of unutilized energy should be maintained.