DOI QR코드

DOI QR Code

A study on rotational behaviour of a new industrialised building system connection

  • 투고 : 2016.03.31
  • 심사 : 2017.07.25
  • 발행 : 2017.10.10

초록

The performance of an Industrialised Building System (IBS) consists of prefabricated reinforced concrete components, is greatly affected by the behaviour of the connection between beam and columns. The structural characteristics parameters of a beam-to-column connection like rotational stiffness, strength and ductility can be explained by load-rotation relationship of a full scale H-subframe under gravitational load. Furthermore, the connection's degree of rigidity directly influences the behaviour of the whole frame. In this research, rotational behaviour of a patented innovative beam-to-column connection with unique benefits like easy installation, no wet work, no welding work at assembly site, using a hybrid behaviour of steel and concrete, easy replacement ability, and compatibility with architecture was investigated. The proposed IBS beam-to-column connection includes precast concrete components with embedded steel end connectors. Two full-scale H-subframes constructed with a new IBS and conventional cast in-situ reinforced concrete system beam-to-column connections were tested under incremental static loading. In this paper, load-rotation relationship and ratio of the rigidity of IBS beam-to-column connection are studied and compared with conventional monolithic reinforced concrete connection. It is concluded that this new IBS beam-to-column connection benefits from more rotational ductility than the conventional reinforced concrete connection. Furthermore, the semi-rigid IBS connection rigidity ratio is about 44% of a full rigid connection.

키워드

참고문헌

  1. ACI 318 (2014), Building code requirements for structural concrete and commentary; American Concrete Institute, Farmington Hills, MI, USA.
  2. ACI-ASCE Committee 512 (1964), "Suggested design of joints and connections in precast structural concrete", J. Struct. Div., 90(4), 175-190.
  3. Bhatt, P. and Kirk, D.W. (1985), "Tests on improved beam-tocolumn connections for precast concrete", ACI Journal, 82(6), 835-843.
  4. Cheok, G.S. and Lew, H.S. (1991), "Performance of precast concrete beam-to-column connections subject to cyclic loading", PCI Journal, 36(3), 56-67.
  5. Cheok, G.S. and Lew, H.S. (1993), "Model precast concrete beamto-column connections subject to cyclic loading", PCI Journal, 38(4), 80-92. https://doi.org/10.15554/pcij.07011993.80.92
  6. Cheok, G.S., Stone, W.C. and Kunnath, S.K. (1998), "Seismic response of precast concrete frames with hybrid connections", ACI Struct. J., 95(2), 527-539.
  7. Dolan, C.W. and Pessiki, S.P. (1989), "Model testing of precast concrete connections", PCI Journal, 56(2), 85-103.
  8. Dolan, C.W., Stanon, J.F. and Anderson, R.G. (1987), "Moment resistant connections and simple connections", PCI Journal, 32(2), 62-74. https://doi.org/10.15554/pcij.03011987.62.74
  9. Elliott, K.S. (1996), Multi-storey Precast Concrete Framed Structures, Wiley Blackwell, London, UK.
  10. Elliott, K.S., Davis, G., Gorgun, H. and Adlparvar, M.R. (1998), "The stability of concrete skeletal structures", PCI Journal, 43(2), 42-60. https://doi.org/10.15554/pcij.03011998.42.60
  11. Elliott, K.S., Davis, G., Ferreira, M., Gorgun, H. and Mahdi, A.A. (2003), "Can Precast Concrete Structures Be Designed as Semi-Rigid Frames? Part 1- The experimental evidence", Struct. Eng., 81(16), 14-27.
  12. Englekrik, R.E. (1995), "Development and testing of a ductile connector for assembling precast concrete beams and columns", PCI Journal, 40(2), 36-51. https://doi.org/10.15554/pcij.03011995.36.51
  13. Ertas, O., Ozden, S. and Ozturan, T. (2006), "Ductile connections in precast concrete moment resisting frames", PCI Journal, 51(3), 66-76. https://doi.org/10.15554/pcij.05012006.66.76
  14. Eurocode 2 (2004), Design of Concrete Structures; European Committee for Standardization, Brussels, Belgium.
  15. Kamar, K.A.M., Hamid, Z.A., Azman, M.N.A. and Ahamad, M.S.S. (2011), "Industrialized building system (IBS): Revisiting issue of definition and classification", Int. J. Emerg. Sci., 1(2), 120-132.
  16. Khaloo, A.R. and Parastesh, H. (2003), "Cyclic loading of ductile precast concrete beam-column connection", ACI Struct. J., 100(4), 291-296.
  17. Kulkarni, A.S. and Li, B. (2009), "Investigations of seismic behaviour of hybrid connections", PCI Journal, 54(1), 67-87. https://doi.org/10.15554/pcij.01012009.67.87
  18. Kulkarni, A.S., Li, B. and Yip, W.K. (2008)," Finite Element analysis of precast hybrid-steel concrete connections under cyclic loading", J. Construct. Steel Res., 64(2), 190-201. https://doi.org/10.1016/j.jcsr.2007.05.002
  19. Kwong, Y.W. and Teng, S. (2000), "Hybrid precast concrete beam", CSE Research Bulletin, No.13, pp. 78-80.
  20. Li, B., Kulkarni, A.S. and Leong, C.L. (2009), "Seismic performance of precast hybrid-steel concrete connections", J. Earthq. Eng., 13(5), 667-689. https://doi.org/10.1080/13632460902837793
  21. Loo, Y.C. and Yao, B.Z. (1995), "Static and repeated load tests on precast concrete beam-to-column", PCI Journal, 40(2), 106-115. https://doi.org/10.15554/pcij.03011995.106.115
  22. Marsono, A.K., Ying, W.J., Md. Tap, M., Chieh, Y.C. and Haddadi, A. (2015), "Standard Verification Test for Industrialised Building System (IBS) Repetitive Manufacturing", Procedia CIRP, 26(2015), 252-257. https://doi.org/10.1016/j.procir.2014.07.047
  23. Moghadasi, M. and Marsono, A.K. (2012), "Comparative experimental study of full-scale H-subframe using a new industrialized building system and monolithic reinforced concrete beam-to-column connection", Struct. Des. Tall Special Build., 23(8), 563-579. https://doi.org/10.1002/tal.1060
  24. Pillai, S.U. and Kirk, D.W. (1981), "Ductile beam-column connection in precast concrete", ACI Journal, 78(6) 480-487.
  25. Rahman, A.B.A., Hock, L.J., Saim, A.A. and Osman, M.H. (2007), "Design and testing of a full scale precast concrete h-subframe", Proceedings of the 1st Construction Industry Research Achievement International Conference (CIRAC2007), Kuala Lumpur, Malaysia, March.
  26. Seckin, M. and Fu, H.C. (1990), "Beam-column connections in precast reinforced concrete construction", ACI Structural Journal, 87(3), 252-261.
  27. Stone, W.C., Cheok, G.S. and Stanton, J.F. (1995), "Performance of hybrid moment-resisting precast beam-column concrete connections subjected to cyclic loading", ACI Structural Journal, 92(2), 229-249.
  28. Wilden, H. (Ed.) (2010), PCI Design Handbook Precast and Prestressed Concrete, (7th Ed.), Precast/Prestressed Concrete Institute (PCI), Chicago, IL, USA.
  29. Wilson, E.L. and Habibullah, A. (2009), SAP2000 Integrated Finite Element Analysis and Design of Structures, Version 14.1.0; Computers and Structures Inc., Berkeley, CA, USA.
  30. Yang, K.H., Oh, M.H., Kim, M.H. and Lee, H.C. (2010), "Flexural behaviour of hybrid precast concrete beams with H-steel beams at both ends", Eng. Struct., 32(9), 2940-2949. https://doi.org/10.1016/j.engstruct.2010.05.013

피인용 문헌

  1. Thermal Performance of Alginate Concrete Reinforced with Basalt Fiber vol.10, pp.9, 2017, https://doi.org/10.3390/cryst10090779