References
- ACI 318 (2014), Building code requirements for structural concrete and commentary; American Concrete Institute, Farmington Hills, MI, USA.
- ACI-ASCE Committee 512 (1964), "Suggested design of joints and connections in precast structural concrete", J. Struct. Div., 90(4), 175-190.
- Bhatt, P. and Kirk, D.W. (1985), "Tests on improved beam-tocolumn connections for precast concrete", ACI Journal, 82(6), 835-843.
- Cheok, G.S. and Lew, H.S. (1991), "Performance of precast concrete beam-to-column connections subject to cyclic loading", PCI Journal, 36(3), 56-67.
- Cheok, G.S. and Lew, H.S. (1993), "Model precast concrete beamto-column connections subject to cyclic loading", PCI Journal, 38(4), 80-92. https://doi.org/10.15554/pcij.07011993.80.92
- Cheok, G.S., Stone, W.C. and Kunnath, S.K. (1998), "Seismic response of precast concrete frames with hybrid connections", ACI Struct. J., 95(2), 527-539.
- Dolan, C.W. and Pessiki, S.P. (1989), "Model testing of precast concrete connections", PCI Journal, 56(2), 85-103.
- Dolan, C.W., Stanon, J.F. and Anderson, R.G. (1987), "Moment resistant connections and simple connections", PCI Journal, 32(2), 62-74. https://doi.org/10.15554/pcij.03011987.62.74
- Elliott, K.S. (1996), Multi-storey Precast Concrete Framed Structures, Wiley Blackwell, London, UK.
- Elliott, K.S., Davis, G., Gorgun, H. and Adlparvar, M.R. (1998), "The stability of concrete skeletal structures", PCI Journal, 43(2), 42-60. https://doi.org/10.15554/pcij.03011998.42.60
- Elliott, K.S., Davis, G., Ferreira, M., Gorgun, H. and Mahdi, A.A. (2003), "Can Precast Concrete Structures Be Designed as Semi-Rigid Frames? Part 1- The experimental evidence", Struct. Eng., 81(16), 14-27.
- Englekrik, R.E. (1995), "Development and testing of a ductile connector for assembling precast concrete beams and columns", PCI Journal, 40(2), 36-51. https://doi.org/10.15554/pcij.03011995.36.51
- Ertas, O., Ozden, S. and Ozturan, T. (2006), "Ductile connections in precast concrete moment resisting frames", PCI Journal, 51(3), 66-76. https://doi.org/10.15554/pcij.05012006.66.76
- Eurocode 2 (2004), Design of Concrete Structures; European Committee for Standardization, Brussels, Belgium.
- Kamar, K.A.M., Hamid, Z.A., Azman, M.N.A. and Ahamad, M.S.S. (2011), "Industrialized building system (IBS): Revisiting issue of definition and classification", Int. J. Emerg. Sci., 1(2), 120-132.
- Khaloo, A.R. and Parastesh, H. (2003), "Cyclic loading of ductile precast concrete beam-column connection", ACI Struct. J., 100(4), 291-296.
- Kulkarni, A.S. and Li, B. (2009), "Investigations of seismic behaviour of hybrid connections", PCI Journal, 54(1), 67-87. https://doi.org/10.15554/pcij.01012009.67.87
- Kulkarni, A.S., Li, B. and Yip, W.K. (2008)," Finite Element analysis of precast hybrid-steel concrete connections under cyclic loading", J. Construct. Steel Res., 64(2), 190-201. https://doi.org/10.1016/j.jcsr.2007.05.002
- Kwong, Y.W. and Teng, S. (2000), "Hybrid precast concrete beam", CSE Research Bulletin, No.13, pp. 78-80.
- Li, B., Kulkarni, A.S. and Leong, C.L. (2009), "Seismic performance of precast hybrid-steel concrete connections", J. Earthq. Eng., 13(5), 667-689. https://doi.org/10.1080/13632460902837793
- Loo, Y.C. and Yao, B.Z. (1995), "Static and repeated load tests on precast concrete beam-to-column", PCI Journal, 40(2), 106-115. https://doi.org/10.15554/pcij.03011995.106.115
- Marsono, A.K., Ying, W.J., Md. Tap, M., Chieh, Y.C. and Haddadi, A. (2015), "Standard Verification Test for Industrialised Building System (IBS) Repetitive Manufacturing", Procedia CIRP, 26(2015), 252-257. https://doi.org/10.1016/j.procir.2014.07.047
- Moghadasi, M. and Marsono, A.K. (2012), "Comparative experimental study of full-scale H-subframe using a new industrialized building system and monolithic reinforced concrete beam-to-column connection", Struct. Des. Tall Special Build., 23(8), 563-579. https://doi.org/10.1002/tal.1060
- Pillai, S.U. and Kirk, D.W. (1981), "Ductile beam-column connection in precast concrete", ACI Journal, 78(6) 480-487.
- Rahman, A.B.A., Hock, L.J., Saim, A.A. and Osman, M.H. (2007), "Design and testing of a full scale precast concrete h-subframe", Proceedings of the 1st Construction Industry Research Achievement International Conference (CIRAC2007), Kuala Lumpur, Malaysia, March.
- Seckin, M. and Fu, H.C. (1990), "Beam-column connections in precast reinforced concrete construction", ACI Structural Journal, 87(3), 252-261.
- Stone, W.C., Cheok, G.S. and Stanton, J.F. (1995), "Performance of hybrid moment-resisting precast beam-column concrete connections subjected to cyclic loading", ACI Structural Journal, 92(2), 229-249.
- Wilden, H. (Ed.) (2010), PCI Design Handbook Precast and Prestressed Concrete, (7th Ed.), Precast/Prestressed Concrete Institute (PCI), Chicago, IL, USA.
- Wilson, E.L. and Habibullah, A. (2009), SAP2000 Integrated Finite Element Analysis and Design of Structures, Version 14.1.0; Computers and Structures Inc., Berkeley, CA, USA.
- Yang, K.H., Oh, M.H., Kim, M.H. and Lee, H.C. (2010), "Flexural behaviour of hybrid precast concrete beams with H-steel beams at both ends", Eng. Struct., 32(9), 2940-2949. https://doi.org/10.1016/j.engstruct.2010.05.013
Cited by
- Thermal Performance of Alginate Concrete Reinforced with Basalt Fiber vol.10, pp.9, 2017, https://doi.org/10.3390/cryst10090779