DOI QR코드

DOI QR Code

Optimum Allocation Model of Military Engineer Equipments for Artillery Position Development

포병진지 구축을 위한 공병장비 최적배정 모형

  • Jang, Young Cho (Department of Military Operations Research, Korea National Defense University) ;
  • Lee, Moon Gul (Department of Military Operations Research, Korea National Defense University)
  • 장영초 (국방대학교 운영분석학과) ;
  • 이문걸 (국방대학교 운영분석학과)
  • Received : 2016.11.06
  • Accepted : 2017.06.16
  • Published : 2017.06.30

Abstract

The artillery is a key element of the ground forces operation during wartime, and the military engineers support the artillery position development operation to support the smooth operation of the artillery. In establishing the artillery position development operation plan, the commander requires more than his intuition to find the best option reflecting a number of elements of the battlefield situation which changes every minute. Moreover, the number of available equipment is smaller than the number of required position developments, and the effective equipment operation becomes essential element of this issue. This study quantified the capability of the available engineering equipment, organized a number of teams enabling equipment to put out the maximum capacity based on the quantified figures, and formed the model which allocates the team to the developing points to minimize the developing time. The goal programming method was applied to resolve the problem. The developed model was applied to compare the total mission duration following the number of teams, the variable for commander's decision, and the result of this study can be used as the quantitative data for commander's decision making process in establishing the artillery position development support operation through effective equipment management.

Keywords

References

  1. 김연민, "N개의 다른 도크를 고려한 선박 건조 혼합의 최적화", 산업공학(IE interfaces), 제22권, 제1호(2009), pp.38-43.
  2. 원서경, 김선국, 한충희, "시스템 다이내믹스를 활용한 토공장비의 조합 모형 연구", 한국건설관리학회 학술발표대회 논문집, 제8권, 제2호 (2007), pp.194-202.
  3. 육군교육사령부 편, 야전교범 34-0-2 공병야전 제원, 대전 : 국군인쇄창, 2013.
  4. 이상원, 임석철, "이진정수계획법을 사용한 복층숙소의 최적 방 배정문제", 산업공학(IE interfaces), 제21권, 제2호(2008), pp.170-176.
  5. 최재휘, 이동훈, 김선형, 김선국, "토공장비 선정 및 조합을 위한 영향요인 연구", 한국건설관리학회 학술발표대회 논문집, 제10권, 제1호(2010), pp.210-205.
  6. Kalvelgen, E., Solving Multi-Objective Models with GAMS, The War, New York : Knopf, 2007.
  7. Shah, R.K., "A New Approach for Automation of Location-based Earthwork Scheduling in Road Construction Projects," Automation in Construction, Vol.43(2014), pp.156-169. https://doi.org/10.1016/j.autcon.2014.03.003
  8. Stanley Zionts, Linear and Integer Programming, Prentice-Hall, 1997.