참고문헌
- B.P. Sunjka, U. Jacob, "Significant causes and effects of project delays in the Niger Delta region, Nigeria," in SAIIE25 proc., Stellenbosch, SA, 2013, pp. 1 - 14.
- O. Okeola, "Construction engineering" 2013.
- R.N. Nkado, "Competencies Required of Quantity Surveyors," Unpublished MBA research Report, University of the Witwatersrand, Johannesburg, 1999.
- City of Johannesburg (CoJ), "2013/14 Group Integrated Annual Report," 2014.
- D.W.M. Chan, M.M. Kumaraswamy, "A comparative study of causes of time overruns in Hong Kong construction projects," Int. J. of Project Manage., Vol. 15, No. 1, pp. 55 - 63, 1997. https://doi.org/10.1016/S0263-7863(96)00039-7
- G. Sweis, R. Sweis, A. Abu Hammad, A. Shboul, "Delays in construction projects: The case of Jordan," Int. J. of Project Manage., Vol. 26, No. 6, pp. 665 - 674, 2008. https://doi.org/10.1016/j.ijproman.2007.09.009
- G. Stumpf, "Schedule delay analysis," Cost Eng. J., Vol. 42, No. 7, pp. 32 - 43, 2000.
- G.J. Kikwasi, "Causes and effects of delays and disruptions in construction projects in Tanzania," Australasian J. Construction Econ. and Building, Conf. Series, Vol. 1, No. 2, pp. 52 - 59, 2012.
- R.F. Aziz, "Ranking of delay factors in construction projects after Egyptian revolution," Alexandria Eng. J., Vol. 52, pp. 387 - 406, 2013. https://doi.org/10.1016/j.aej.2013.03.002
- S.A. Assaf, S. Al-Hejji, "Causes of delay in large construction projects," Int. J. of Project Manage., Vol. 24, pp. 349 - 357, 2006. https://doi.org/10.1016/j.ijproman.2005.11.010
- D.W. Bordoli, A.N. Baldwin, "A methodology for assessing construction project delays," Constr. Manage. Econ., Vol. 16, pp. 327 - 337, 1998. https://doi.org/10.1080/014461998372358
- S.K. Wei, "Causes, effects and methods of minimizing delays in construction projects: Universiti Teknologi Malaysia, 2010.
- S.F. Behboudi, "A model to predict the impact of excusable and non-excusable delay on selected construction projects," AEI, 2008.
- M. Mukuka, C. Aigbavboa, W. Thwala, "A theoretical assessment of the causes and effects of construction project delay," in CEE 2013 proc., Johannesburg, SA, 2013, pp. 174 - 177.
- N. Hamzah, M.A. Khoiry, I. Arshad, N.M. Tawil, A.I. Che Ani, "Cause of construction delay - theoretical framework," Procedia Eng., Vol. 20, pp. 490 - 495, 2011. https://doi.org/10.1016/j.proeng.2011.11.192
- O.E. Akinsiku, A. Akinsulire, "Stakeholders' perception of the causes and effects of construction delays on project delivery," KICEM J. Construction Eng. and Project Manage., Vol. 2, No. 4, pp. 25 - 31, 2012. https://doi.org/10.6106/JCEPM.2012.2.4.025
- S.S.S. Gardezi, I.A. Manarvi, S.J.S. Gardezi, "Time extension factors in construction industry of Pakistan," Procedia Engineering, Vol. 77, pp. 196 - 204, 2014. https://doi.org/10.1016/j.proeng.2014.07.022
- M.M. Marzouk, T.I. El-Rasas, "Analysing delay causes in Egyptian construction projects," J. of Advanced Research, Vol. 5, pp. 49 - 55, 2014. https://doi.org/10.1016/j.jare.2012.11.005
- M.E. Abd El-Razek, H.A. Bassioni, A.M. Mobarak, "Causes of delay in building construction projects in Egypt" J. Constr. Eng. Manage, Vol. 134, No. 11, pp. 831 - 841, 2008. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:11(831)
- A.S. Ezeldin, M. Abdel-Ghany, "Causes of construction delays for engineering projects in the Middle-East: An Egyptian perspective" AEI, pp. 53 - 62, 2013.
- A.A. Aibinu, H.A. Odeyinka, "Construction delays and their causative factors in Nigeria," J. Construction Eng. and Manage., Vol. 132, No. 7, pp. 667 - 677, 2006. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(667)
- L. Baloyi, M.C. Bekker, "Causes of construction cost and time overruns: the 2010 FIFA world cup stadia in South Africa," Acta Structilia, Vol. 18, No. 1, pp. 51-67, 2011.
- M.A. Nkobane, "Causes of delay and cost overruns in engineering, procurement and construction management projects in South Africa," M.S. thesis, Dept. Eng. Manage., Univ. Johannesburg, Johannesburg, South Africa, 2012.
- C. Semple, F.T. Hartman, G. Jergeas, "Construction claims and disputes: causes and cost/time overruns," J. Constr. Eng. Manage., Vol. 120, No. 4, pp. 785 - 795, 1994. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:4(785)
- O. Motaleb, M. Kishk, "An investigation into causes and effects of construction delays in UAE," in Egbu, C. (Ed) Proc. 26th Annual ARCOM Conf., 6-8 September 2010, Leeds, UK, Association of Researchers in Construction Management, 2010, pp. 1149-1157.
- A.A. Aibinu, G.O. Jagboro, "The effects of construction delays on project delivery in Nigerian construction industry," Int. J. of Project Manage., Vol. 20, No. 8, pp. 593 - 599, 2002. https://doi.org/10.1016/S0263-7863(02)00028-5
- M. Sambasivan, Y.W. Soon, "Causes and effects of delays in Malaysian construction industry," Int. J. of Project Manage., Vol. 25, pp. 517 - 526, 2007. https://doi.org/10.1016/j.ijproman.2006.11.007
- A.A. Salunkhe, R.S. Patil, "Effect of construction delays on project time overrun: Indian scenario," Int. J. Research Eng. Tech., Vol. 3, No. 1, pp. 543 - 547, 2014.
- StatPac, Survey sampling methods, [online]. Available: https://www.statpac.com/surveys/sampling.htm [Accessed July 06, 2015].
- M. Saunders, P. Lewis, A. Thornhill, Research Methods for Business students, 6th ed. England: Pearson Education Limited, 2012.
- H. Doloi, A. Sawhney, K.C. Lyer, S. Rentala, "Analysing factors affecting delays in Indian construction projects," Int. J. of Project Manage., Vol. 30, pp. 479 - 489, 2012. https://doi.org/10.1016/j.ijproman.2011.10.004
- A. Albogamy, D. Scott, N. Dawood, G. Bekr, "Addressing crucial risk factors in the Middle East construction industries: a comparative study of Saudi Arabia and Jordan," in Sustainable Building Conf. Coventry University, West Midlands, UK, 2013, pp. 118 - 128.
- L.T. Van, N.M. Sang, N.T. Viet, "A conceptual model of delay factors affecting government construction projects," ARPN J. Sci. Tech., Vol. 5, No. 2, pp. 92 - 100, 2015.
피인용 문헌
- The top 10 universal delay factors in construction projects vol.11, pp.3, 2018, https://doi.org/10.1108/IJMPB-05-2017-0052