Abstract
In this study, drainage systems were proposed to drain the leakage of groundwater in the existing underground concrete structures. The system consists of drainage board, wire mesh, fixed nail, and mortar with mineral. In order to increase constructability, the drainage board and wire mesh were attached on the surface of cement concrete using the air nailer and fixed nail. The mortar with 30% of blast furnace slag was sprayed on the drainage board and wire mesh using the spray mortar equipment. The field test construction was carried out in a conventional concrete lining tunnel and concrete retaining wall for performance verification of the drainage system in the field. There was no problem with performance degradation in the drainage system for three years after construction. The bond strength tests were performed on the sprayed mortar at 14 days and about 3 years after field test construction. In case of attaching the wire mesh on the drainage board, the bond strengths of the sprayed mortar were 1.04 MPa at 14 days and 1.46 MPa about 3 years. In case of the drainage board without the wire mesh, the bond strengths of the sprayed mortar were 1.13 MPa at 14 days and 0.89 MPa, less than 1 MPa of bond strength criteria, about 3 years.
본 연구에서는 지하 콘크리트 구조물 내로 누수된 지하수를 유도하여 배수하는 유도배수공법을 제시하였다. 유도배수공법은 유도배수판, 철망, 고정핀, 광물질 혼입 모르타르로 구성된다. 시공성 향상을 위하여 유도배수판 및 철망은 공압타카와 고정핀를 사용하여 콘크리트 표면에 부착하였다. 고로슬래그미분말을 30% 혼입한 모르타르는 뿜어 붙임 모르타르 장비를 사용하여 유도배수판 및 철망 표면에 타설하였다. 유도배수공법의 현장 시공성 및 성능 검증을 위하여 재래식 콘크리트라이닝 터널과 콘크리트 옹벽에서 시험시공을 수행하였다. 시험시공 완료 3년 후 유도배수공법은 성능저하의 문제점이 없는 것으로 판단되었다. 재령 14일과 3년에 뿜어 붙임 모르타르의 부착력 실험을 수행하였다. 유도배수판 표면에 철망을 적용한 경우 뿜어 붙인 모르타르의 부착력은 재령 14일에 1.04 MPa, 재령 3년에 1.46 MPa로 측정되었다. 철망을 적용하지 않은 경우의 부착력은 재령 14일에 1.13 MPa로 측정되었지만, 재령 3년에는 0.89 MPa로 기준 부착력 1 MPa보다 낮게 측정되었다.