Acknowledgement
Supported by : 한국연구재단
References
- Kim, S., Kim, Y., & Lee, J. (2006). Cutting-Line Sensing Methods for an Automated Concrete Pile Cutter, Journal of Korean Society of Civil Engineers, 26(6), 985-993.
- Korea Occupational Safety & Health Agency(2008). Safety Work for Foundation Pile.
- Lee, J., Kim, Y., Kim, J., & Cho, M. (2006). Development and Field Test of PHC Pile Head Cutting and Crushing Machine, Journal of the Architectural Institute of Korea, 22(8), 171-180.
- Ministry of Employment and Labor(2013). Survey Report on the Demand and Supply of the Construction Technical Manpower.
- Park, T., Lee, J., & Lee, C. (2008). Problem and Improvement Measure of PHC Pile Construction, Proceedings of Korea Institute of Construction Engineering and Management Annual Conference, 344-348.
- Research Institute of Industrial Science & Technology(2012). Trends of The New Foundation Pile Market and Technology.
- Statics Korea(2016). Analysis of Economically Active Population.
- Won, Y., Lee, J., Kim, Y., & Park, S(2002). Study on the Automation of Pretensioned Spun High Strength Concrete Pile Cutting Work, Journal of the Architectural Institute of Korea, 18(9), 181-190.