DOI QR코드

DOI QR Code

An Empirical Analysis of the Effect of Governance-Peripheral Knowledge Fit on the Performance of IT Project Outsourcing: Focusing on the Perceptual Gap between Client and Vendor

IT 프로젝트 아웃소싱에서 거버넌스-주변지식의 조화가 프로젝트 성과에 미치는 영향에 대한 실증 분석: 고객사-공급사 간 인지차를 중심으로

  • Seonyoung Shim (Department of Business Administration, Sungshin University)
  • 심선영 (성신여자대학교 경영학과)
  • Received : 2017.03.02
  • Accepted : 2017.03.28
  • Published : 2017.03.31

Abstract

We investigated perceptual similarity and the difference between client and vendor in information technology (IT) outsourcing projects. Specifically, we focused on each player's perception of how the fit of governance and peripheral knowledge affects the performance of IT project outsourcing. For 107 IT projects, we surveyed both client and vendor in the same IT projects and compared the responses of each side. Through a dyadic analysis, we first found that both client and vendor put more weight on the vendor's peripheral knowledge than that of the client as a positive influencer of project performance. However, regarding the governance style of an IT project, client and vendor showed completely different perspectives. The client believed that the vendor's peripheral knowledge positively contributes to the performance of IT project under the governance of outcome control. However, the vendor showed that its peripheral knowledge creates synergy effects under the governance of process control. Our interpretation of the perceptual similarity and difference between client and vendor delivers managerial implications for businesses that process IT projects.

본 연구에서는 IT 프로젝트 아웃소싱에서 고객사와 공급사간에 존재하는 인지적 일치점과 차이점에 대하여 고찰하였다. 특히, 고객사 또는 공급사의 주변지식과 거버넌스 방식의 조화가 프로젝트 성과에 미치는 영향에 대한 양측의 관점을 비교하였다. 107개의 IT 프로젝트를 대상으로 각 프로젝트에 참여한 고객사와 공급사 양측을 모두 설문조사하여 비교 분석한 결과, 첫째 양측의 주변지식 중 고객사보다는 공급사의 주변지식이 프로젝트 성과에 대한 긍정적 영향요인이라는 의견이 고객사와 공급사 양측에서 동일하게 제시되었다. 하지만, 이러한 주변지식에 결합되는 통제 방식에 있어서는 양측이 다른 견해를 보였다. 고객사는 과정통제 하에서 공급사 주변지식은 프로젝트 성과에 긍정적 영향을 미친다고 보았지만 공급사는 자신들의 주변지식이 결과통제와 결합될 때 프로젝트 성과에 기여하는 시너지 효과가 발생한다고 보았다. 본 연구에서는 이러한 양측의 인지적 일치점과 차이점에 대한 해석을 제공하며 이는 기업들이 IT 프로젝트를 수행함에 있어 관리적 함의를 제공할 것이다.

Keywords

Acknowledgement

이 논문은 2016년도 성신여자대학교 학술연구조성비 지원에 의하여 연구되었음.

References

  1. 구윤모, 이재남, 손인수, "복수 공급업체와의 관계구조가 정보기술 아웃소싱 성과에 미치는 영향: 거래비용 이론 관점", Information Systems Review, 제18권, 제1호, 2016, pp. 177-197. https://doi.org/10.14329/isr.2016.18.1.177
  2. 박준기, 이세윤, 이정우, "사회적 상호의존성과 지식공유: IT 프로젝트의 사례", Information Systems Review, 제16권, 제3호, 2014, pp. 25-47. https://doi.org/10.14329/isr.2014.16.3.025
  3. 신호경, 김경규, "지식 상호보완성과 신뢰가 IT 아웃소싱 효과에 미치는 영향에 관한 연구", Asia Pacific Journal of Information Systems, 제17권, 제3호, 2007, pp. 55-78.
  4. 이종만, 남기찬, "정보시스템 아웃소싱에서 관계 관리의 조합: 신뢰 관점", Journal of Information Technology Applications & Management, 제13권, 제4호, 2006, pp. 181-195.
  5. 장평, 홍관수, "외부지식이전이 지식공유의 선행요인과 성과에 미치는 조절효과", 금융지식연구, 제8권, 제1호, 2010, pp. 117-147.
  6. 조부연, 박광태, 김대수, "행동 모니터링이 IT 서비스 아웃소싱 성공에 미치는 영향에 관한 실증적 연구", 인터넷전자상거래연구, 제11권, 제1호, pp. 229-253.
  7. Arnold, U., "New dimensions of outsourcing: A combination of transaction cost economics and the core competencies concept", European Journal of Purchasing & Supply Management, Vol.6, No.1, 2000, pp. 23-29. https://doi.org/10.1016/S0969-7012(99)00028-3
  8. Aubert, B. A., S. Rivard, and M. Patry, "A transaction cost approach to Outsourcing Behavior: Some empirical evidence", Information & Management, Vol.30, No.2, 1996, pp. 51-64. https://doi.org/10.1016/0378-7206(95)00045-3
  9. Bassellier, G., I. Benbasat, and B. H. Reich, "The influence of business managers' IT competence on championing IT", Information Systems Research, Vol.14, No.4, 2003, pp. 317-336. https://doi.org/10.1287/isre.14.4.317.24899
  10. Brusoni, S., A. Prencipe, and K. Pavitt, "Knowledge specialization, organizational coupling, and the boundaries of the firm: Why do firms know more than they make?", Administrative Science Quarterly, Vol.46, No.4, 2001, pp. 597-621. https://doi.org/10.2307/3094825
  11. Cardinal, L. B., "Technological innovation in the pharmaceutical industry: The use of organizational control in managing research and development", Organization Science, Vol.12, No.1, 2001, pp. 19-36. https://doi.org/10.1287/orsc.12.1.19.10119
  12. Chin, W. W., "The partial least squares approach to structural equation modeling", Modern Methods for Business Research, Vol.295, No.2, 1998, pp. 295-336.
  13. Choudhury, V. and R. Sabherwal, "Portfolios of control in outsourced software development projects", Information Systems Research, Vol.14, No.3, 2003, pp. 291-314. https://doi.org/10.1287/isre.14.3.291.16563
  14. Clark Jr, T. D., R. W. Zmud, and G. E. McCray, "The outsourcing of information services: Transforming the nature of business in the information industry", Journal of Information Technology, Vol.10, No.4, 1995, pp. 221-237. https://doi.org/10.1177/026839629501000403
  15. Dessein, W., "Authority and communication in organizations", The Review of Economic Studies, Vol.69, No.4, 2002, pp. 811-838. https://doi.org/10.1111/1467-937X.00227
  16. Ellram, L. M., W. L. Tate, and C. Billington, "Offshore outsourcing of professional services: A transaction cost economics perspective", Journal of Operations Management, Vol.26, No.2, 2008, pp. 148-163. https://doi.org/10.1016/j.jom.2007.02.008
  17. Faraj, S. and L. Sproull, "Coordinating expertise in software development teams", Management Science, Vol.46, No.12, 1999, pp. 1554-1568. https://doi.org/10.1287/mnsc.46.12.1554.12072
  18. Feeny, D. F. and L. P. Willcocks, "Core IS capabilities for exploiting information technology", MIT Sloan Management Review, Vol.39, No.3, 1998, p. 9.
  19. Fornell, C. and D. F. Larcker, "Structural equation models with unobservable variables and measurement error: Algebra and statistics", Journal of Marketing Research, Vol.18, No.3, 1981, pp. 382-388. https://doi.org/10.1177/002224378101800313
  20. Gainey, T. W. and B. S. Klaas, "The outsourcing of training and development: Factors impacting client satisfaction", Journal of Management, Vol.29, No.2, 2003, pp. 207-229. https://doi.org/10.1177/014920630302900205
  21. Gibson, C. B., C. D. Cooper, and J. A. Conger, "Do you see what we see? The complex effects of perceptual distance between leaders and teams", Journal of Applied Psychology, Vol.94, No.1, 2009. p. 62.
  22. Grant, R. M., "Toward a knowledge-based theory of the firm", Strategic Management Journal, Vol.17, No.S2, 1996, pp. 109-122. https://doi.org/10.1002/smj.4250171110
  23. Hair, J. F., R. E. Anderson, R. L. Tatham, and W. C. Black, Multivariate Data Analysis, 5th, Prentice Hall International, NY, 1998.
  24. Hancox, M. and R. Hackney, "IT outsourcing: Frameworks for conceptualizing practice and perception", Information Systems Journal, Vol.10, No.3, 2000, pp. 217-237. https://doi.org/10.1046/j.1365-2575.2000.00082.x
  25. Im, G. and A. Rai, "IT-enabled coordination for ambidextrous interorganizational relationships", Information Systems Research, Vol.25, No.1, 2013, pp. 72-92. https://doi.org/10.1287/isre.2013.0496
  26. Im, G. and A. Rai, "Knowledge sharing ambidexterity in long-term interorganizational relationships", Management Science, Vol.54, No.7, 2008, pp. 1281-1296. https://doi.org/10.1287/mnsc.1080.0902
  27. Inkpen, A. C. and S. C. Currall, "The coevolution of trust, control, and learning in joint ventures", Organization Science, Vol.15, No.5, 2004, pp. 586-599. https://doi.org/10.1287/orsc.1040.0079
  28. Jaworski, B. J. and D. J. MacInnis, "Marketing jobs and management controls: toward a framework", Journal of Marketing Research, 1989, pp. 406-419.
  29. Jensen, M. C. and W. H. Meckling, Specific and general knowledge and organizational structure, 1992. 
  30. Kirsch, L. J., "The management of complex tasks in organizations: Controlling the systems development process", Organization Science, Vol.7, No.1, 1996, pp. 1-21. https://doi.org/10.1287/orsc.7.1.1
  31. Kirsch, L. J. and C. M. Beath, "The enactments and consequences of token, shared, and compliant participation in information systems development", Accounting, Management and Information Technologies, Vol.6, No.4, 1996, pp. 221-254. https://doi.org/10.1016/S0959-8022(96)90015-6
  32. Kirsch, L. J., V. Sambamurthy, D. G. Ko, and R. L. Purvis, "Controlling information systems development projects: The view from the client", Management Science, Vol.48, No.4, 2002, pp. 484-498. https://doi.org/10.1287/mnsc.48.4.484.204
  33. Kirsch, L. S., "Portfolios of control modes and IS project management", Information Systems Research, Vol.8, No.3, 1997, pp. 215-239. https://doi.org/10.1287/isre.8.3.215
  34. Krause, D. R., R. B. Handfield, and B. B. Tyler, "The relationships between supplier development, commitment, social capital accumulation and performance improvement", Journal of Operations Management, Vol.25, No.2, 2007, pp. 528-545. https://doi.org/10.1016/j.jom.2006.05.007
  35. Levina, N. and J. W. Ross, "From the vendor's perspective: Exploring the value proposition in information technology outsourcing", MIS Quarterly, Vol.27, No.3, 2003, pp. 331-364. https://doi.org/10.2307/30036537
  36. Miranda, S. M. and Y. M. Kim, "Professional versus political contexts: Institutional mitigation and the transaction cost heuristic in information systems outsourcing", Mis Quarterly, Vol.30, No.3, 2006, pp. 725-753. https://doi.org/10.2307/25148747
  37. Nelson, K. M. and J. G. Cooprider, "The contribution of shared knowledge to IS group performance", MIS Quarterly, Vol.20, No.4, 1996. pp. 409-432. https://doi.org/10.2307/249562
  38. Ouchi, W. G., "A conceptual framework for the design of organizational control mechanisms", in Readings in Accounting for Management Control, Springer US, 1979, pp. 63-82.
  39. Reich, B. H. and I. Benbasat, "Factors that influence the social dimension of alignment between business and information technology objectives", MIS Quarterly, Vol.24, No.1, 2000, pp. 81-113. https://doi.org/10.2307/3250980
  40. Roh, J. A., J. M. Whipple, and K. K. Boyer, "The Effect of Single Rater Bias in Multi-Stakeholder Research: A Methodological Evaluation of Buyer-Supplier Relationships", Production and Operations Management, Vol.22, No.3, 2013, pp. 711-725. https://doi.org/10.1111/j.1937-5956.2012.01371.x
  41. Rus, I. and M. Lindvall, "Knowledge management in software engineering", IEEE Software, Vol.19, No.3, 2002, pp. 26-38. https://doi.org/10.1109/MS.2002.1003450
  42. Shi, W., C. Zhu, Y. Tian, and J. Nichol, "Wavelet-based image fusion and quality assessment", International Journal of Applied Earth Observation and Geoinformation, Vol.6, No.3, 2005, pp. 241-251. https://doi.org/10.1016/j.jag.2004.10.010
  43. Shi, Z., A. S. Kunnathur, and T. S. Ragu-Nathan, "IS outsourcing management competence dimensions: Instrument development and relationship exploration", Information & Management, Vol.42, No.6, 2005, pp. 901-919. https://doi.org/10.1016/j.im.2004.10.001
  44. Srivastava, S. C. and T. S. Teo, "Contract performance in offshore systems development: role of control mechanisms", Journal of Management Information Systems, Vol.29, No.1, 2012, pp. 115-158. https://doi.org/10.2753/MIS0742-1222290104
  45. Stump, R. L. and J. B. Heide, "Controlling supplier opportunism in industrial relationships", Journal of Marketing Research, Vol.33, No.4, 1996, pp. 431-441. https://doi.org/10.1177/002224379603300405
  46. Takeishi, A., "Knowledge partitioning in the interfirm division of labor: The case of automotive product development", Organization Science, Vol.13, No.3, 2002, pp. 321-338.  https://doi.org/10.1287/orsc.13.3.321.2779
  47. Teo, T. S. and A. Bhattacherjee, "Knowledge transfer and utilization in IT outsourcing partnerships: A preliminary model of antecedents and outcomes", Information and Management, Vol.51, No.2, 2014, pp. 177-186. https://doi.org/10.1016/j.im.2013.12.001
  48. Tiwana, A. and A. A. Bush, "A comparison of transaction cost, agency, and knowledge-based predictors of IT outsourcing decisions: A US-Japan cross-cultural field study", Journal of Management Information Systems, Vol.24, No.1, pp. 259-300.
  49. Tiwana, A. and B. Konsynski, "Complementarities between organizational IT architecture and governance structure", Information Systems Research, Vol.21, No.2, 2010, pp. 288-304. https://doi.org/10.1287/isre.1080.0206
  50. Tiwana, A. and M. Keil, "Control in internal and outsourced software projects", Journal of Management Information Systems, Vol.26, No.3, 2009, pp. 9-44. https://doi.org/10.2753/MIS0742-1222260301
  51. Tiwana, A. and M. Keil, "Does peripheral knowledge complement control? An empirical test in technology outsourcing alliances", Strategic Management Journal, Vol.28, No.6, 2007, pp. 623-634. https://doi.org/10.1002/smj.623
  52. Tiwana, A., "Governance-knowledge fit in systems development projects", Information Systems Research, Vol.20, No.2, 2009, pp. 180-197. https://doi.org/10.1287/isre.1070.0164
  53. Tiwana, A., "Novelty-knowledge alignment: A theory of design convergence in systems development", Journal of Management Information Systems, Vol.29, No.1, 2012, pp.15-52. https://doi.org/10.2753/MIS0742-1222290101
  54. Tiwana, A., "Systems development ambidexterity: Explaining the complementary and substitutive roles of formal and informal controls", Journal of Management Information Systems, Vol.27, No.2, 2010, pp. 87-126. https://doi.org/10.2753/MIS0742-1222270203
  55. Weil, P. and J. Ross, IT Governance, HBS Press, 2003.