Study of the Curing Time of Cementless Cold Central Plant Recycled Asphalt Base-Layer through Field-Application Review

무시멘트 상온 재활용 아스팔트 기층의 현장 적용성을 통한 양생기간에 관한 연구

  • 최준성 (인덕대학교 토목환경공학과) ;
  • 정철호 (인덕대학교 토목환경공학과) ;
  • 이찬희 (인덕대학교 토목환경공학과) ;
  • 임인수 (국보환경(주).기업부설연구소)
  • Received : 2017.02.28
  • Accepted : 2017.03.29
  • Published : 2017.04.17

Abstract

PURPOSES : The objective of this study is to ascertain the curing period of cementless cold central plant recycled asphalt base-layer, using mechanical analyses and specimen quality tests on the field. METHODS : Cold central plant recycled asphalt base-layer mixture was produced in the plant from reclaimed asphalt, natural aggregate, filler for the cold mix, and the modified emulsion AP using asphalt mix design and plant mix design. In order to examine the applicability of the curing period during the field test, the international standards for the possibility of core extraction and the degree of compaction and LFWD deflection were analyzed. Moreover, Marshall stability test, porosity test, and indirect tensile strength test were performed on the specimens of asphalt mix and plant mix design. RESULTS : The plant production process and compaction method of cementless cold central plant recycled asphalt base-layer were established, and the applicability of the optical moisture content for producing the mixture was verified through the field test. In addition, it was determined that the core extraction method of the conventional international curing standard was insufficient to ensure performance, and the LFWD test demonstrated that the deflection converges after a two-day curing. However, the back-calculation analysis reveals that a three-day curing is satisfactory, resulting in a general level of performance of dense asphalt base-layer. Moreover, from the result of the specimen quality test of the asphalt mix design and plant mix design according to the curing period, it was determined that the qualities satisfied both domestic and international standards, after a two-day curing. However, it was determined that the strength and stiffness after three-day curing are higher than those after a two-day curing by approximately 3.5 % and 20 %, respectively. CONCLUSIONS:A three-day curing period is proposed for the cementless cold central plant recycled asphalt base-layer; this curing period can be demonstrated to retain the modulus of asphalt-base layer in the field and ensure stable quality characteristics.

Keywords

References

  1. Choi, J.S. (2014), "Development of Cementless cold recycled asphalt mix design method for Asphalt road". Induk University, Research of Industrial Technology Institute.
  2. Choi, J.S., K.S. Kim, D.H. Lee, (2015), "The Mix Design of Base course with Cementless cold recycled pavement and the Validation using data of Pre-test road", Proceedings of Korean Society of Road Engineers Conference, 59-59.
  3. Choi, J.S., K.H. Lee, K.S. Kim, (2015), "Analysis of Influence of Mix Design Factors on Cementless Recycled Pavements of Low Traffic Volume Base", Proceedings of Korean Society of Road Engineers Conference, 46-46.
  4. Choi, J.S., C.H. Lee, H. Lee, (2016), "A Study on the Development of Mix Design Criteria for Cementless Cold Recycled Base Pavement", Proceedings of Korean Society of Road Engineers Conference, 108-108.
  5. Jacobson, Torbjom,, Cold Recycling of Asphalt Pavement-Mix in Plant, Swedish National Road and Transport Research Institute.
  6. Kim, M.K. (2005), "Study on the Surface Course Compaction for Hot Mix Asphalt Pavements", Inha University, An engineering master's certificate.
  7. Ministry of Land Infrastructure and Transport (2011), "Guidelines for the Unification of Road Pavements".
  8. Park, H.M., H.J. Park, (2015), "Analysis on Relationship between FWD Back-calculated Modulus and Dynamic Modulus of Asphalt Layers for Existing Asphalt Pavements", Korean Society of Road Engineers, International journal of highway engineering.
  9. Rongji Cao,(2012), Asphalt Pavement Cold Recycling in Highway Rehabilitation Projects, International Pavement Engineering Conference.
  10. Y. Niazi, M. Jalili,, (2009). Effect of portland cement and lime additives on properties of cold in-place recycled mixtures with asphalt emulsion, Construction and Building Materials.