참고문헌
- S. S. Kim, C. S. Park, Y. J. Han, "Technical Trend of Japanese Track Inspection Measuring System", Spring Conference of The Korean Society of Mechanical Engineers, pp. 1109-1111, 2005.05
- S. Y. Oh, S. H, Park, Y. Park, Y. H. Cho, J, T, Song, "Analysis of dynamic/electric characteristic assessment system implementation technology for overhead contact lines", Spring Conference of the Korean Society for Railway, pp. 1174-1179, 2009, 11.
- H, W, Cho, J, S, Bang, H, S, Han, H, K, Sung, D, S, Kim, B, H, Kim, "Status of Advanced Tecnhologies and Domestic Researches for Development of Korean Next Generation Maglev", The Transactions of the Korean Institute of Electrical Engineers, vol. 57, No. 10, pp. 1767-1776, 2008. 10.
- Y. Park, K. Lee, "Analysis on Installation Condition According to Dynamic Characteristics for Overhead Catenary System", The Transactions of the Korean Institute of Electrical Engineers, Vol. 65, No. 9, pp. 1605-1609, 2016. https://doi.org/10.5370/KIEE.2016.65.9.1605
- EN 50317:2001, "The European Standard, Railway applications-Current collection systems-Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact line", 2001.
- K, Lee, H, Jung, Y, Park, H, R, Cho, S, S, Lee, "Development of Section Insulator with Improved Wear Characteristics, The Transactions of the Korean Institute of Electrical Engineers Vol. 62, No. 11, pp. 1633-1639, 2013. https://doi.org/10.5370/KIEE.2013.62.11.1633
- C. H. Chang, K, Lee, S, Y, Kwon, Y, H, Cho, "Consideration of a Selection Technique for Allowable tolerance standard on the Catenary System", Spring Conference of the Korean Society for Railway, pp. 2316-2323, 2009, 11.
- IEC 62486 : 2010, "International Standard, Railway applications-Current collection systems-Technical criteria for the interaction between pantograph and overhead line", 2010
- T. Kobayasi, Y. Fujihasi, T. Tsuburaya, J. I. Satoh, Y. Oura, Y, Fujii, "Current collecting performance of overhead contact line-pantograph system at 425 km/h", Electrical Engineering in Japan, Vol. 124, Issue 3, pp. 73-81, 1998. 08. https://doi.org/10.1002/(SICI)1520-6416(199808)124:3<73::AID-EEJ9>3.0.CO;2-J
- Korean Standard, "Implementation Guidelines of a Comprehensive Test Run for Railway", Ministry of Land, Infrastructure, and Transport, 2014.3.
- G. C. Yun, B, G, Eom, N. G. Heo, Y. S. Lee, "A Study on the Safety Enhancement of Railway depending on the Result Review of Comprehensive Running Test", Spring Conference of the Korean Society for Railway, A297, 2014.
- H. J. Kim, Y. Park, Y. H. Cho, C. J. Cho, I. C. Kim, "Development of Image Processing Technology for Interaction between Pantograph and Overhead Contact Wire", Journal of the Korean institute of electronic material engineers, Vol. 22, pp. 1084-1088, 2009. https://doi.org/10.4313/JKEM.2009.22.12.1084
- Y. Park, C. Park, K. Lee, S. Y. Kwon, "Implement of Dynamic Performance Measurement System Between Pantograph and Contact wire in Tunnel", The Transactions of the Korean Institute of Electrical Engineers Vol. 61, No. 11, pp. 1732-1736, 2012.11. https://doi.org/10.5370/KIEE.2012.61.11.1732
- Y. Park, Y. H. Cho, S. Y. Kwon, K. W. Lee, W. You, "Development of an Arc Detector Assessment System by Loss of Contact Between Pantograph and Contact Wire in Electric Railway", The Transactions of the Korean Institute of Electrical Engineers, Vol. 60, No. 11, pp. 2171-2175, 2011. 11. https://doi.org/10.5370/KIEE.2011.60.11.2171
- Y. Park, S. Y. Kwon, J. M. Kim, "Reliability Analysis of Arcing Measurement System Between Pantograph and Contact Wire", The Transactions of the Korean Institute of Electrical Engineers, Vol. 61, No. 8, pp. 1216-1220, 2012. https://doi.org/10.5370/KIEE.2012.61.8.1216
- As-built drawing, "New Construction of Overhead Contact Line of Suseo High Speed Line", Korea Rail Network Authority, 2016, 12.