References
- Almeder C. and Hartl R. F. (2013) "A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited buffer", Int. J. Prod. Econ.145(1), 88-95. https://doi.org/10.1016/j.ijpe.2012.09.014
- Chai. J. I. and Park. Y. B. (2010) "A Study on Throughput Increase in Semiconductor Package Process of K Manufacturing Company Using a Simulation Model", Journal of the Korea Society for Simulation, 19(1), 1-11.
- Tovia F., Mason S. J. and Ramasami B. (2004) "A Scheduling Heuristic for Maximizing Wirebonder Throughput", IEEE Transactions on Electronics Packaging Manufacturing, 27(2), 145-150. https://doi.org/10.1109/TEPM.2004.837961
- Kang, Y. H., S. S. Kim, and H. Shin (2007) "A scheduling algorithm for the reentrant shop: an application in semiconductor manufacture", International Journal of Advanced Manufacturing Technology, 35, 566-574. https://doi.org/10.1007/s00170-006-0736-7
- Kelton W., Sadowski R. and Sturrock D. (2007) Simulation with Arena, 4th ed., McGraw-Hill, New York, USA.
- Lee S. J. and Lee T. E. (2008) "Scheduling a Multi-Chip Package Assembly Line with Reentrant Process and Unrelated Parallel Machines", Simulation Conference, 2008.
- Zhang M. T., Fu J. and Zu E. (2005) "Dynamic capacity modeling with multiple re-entrant workflows in semiconductor assembly manufacturing", Automation Science and Engineering, 2005. IEEE International Conference on.
- Chua T. J., Cai T. X. and Yin X. F. (2007) "A Heuristic Approach for Scheduling Multi-Chip Packages for Semiconductor Backend Assembly", Emerging Technologies and Factory Automation, 2007.
- Tang Y., Zhou M. and Qiu R. (2003) "Virtual production lines design for back-end semiconductor manufacturing systems", IEEE Transactions on Semiconductor Manufacturing, 16(3), 543-550. https://doi.org/10.1109/TSM.2003.815205