DOI QR코드

DOI QR Code

Development of Lifetime Assessment and Rehabilitation Cost Calculation Methods for Overseas ROMM Project

  • Hyun, Jung-Seob (KEPCO Research Institute, Korea Electric Power Corporation) ;
  • Kim, Doo-Young (KEPCO Research Institute, Korea Electric Power Corporation) ;
  • Hwang, Kwang-Won (KEPCO Research Institute, Korea Electric Power Corporation) ;
  • Park, Min-Gyu (KEPCO Research Institute, Korea Electric Power Corporation)
  • Received : 2017.04.17
  • Accepted : 2017.08.18
  • Published : 2017.12.30

Abstract

Regarding the implementation of ROMM project (Rehabilitation, Operation, Maintenance & Management), which is one of overseas development projects, it is very important to diagnose the exact current status of aged thermal power plant. However, when people visit the power plant for the purpose of prediagnosis to implement the ROMM project, most target power plants for diagnosis, in general, are under operation. This can be a big interference factor to diagnose the exact current status of power plants. Therefore, in order to solve such interference factor, based on the 30 years of know-how in the field, the present study has developed a regression curve for a simple life time assessment and the calculation of rehabilitation cost that may be used as a reference relatively for the quantitative diagnosis on the status of a relevant power plant even during the operation of the power plant.

Keywords

References

  1. Global Data, "Rehabilitation and Modernization of Thermal Power Plant", 2014.
  2. The Electric Power Economy, "BORYEONG Thermal Power Plant, Units 7 & 8 completed on 17th", 2009. Available: http://www.epetimes.com/news/quickViewArticleView.html"idxno=7471.
  3. Lee Mihae, The Export Import Bank of Korea Overseas Economy Research Center, The Office of Industrial Investment Investigation, "Thermal Power Plant Main Equipments & Materials Market Status and Competitiveness of Our Companies", 2013, Vol. 2013_P_01, pp6.
  4. Monthly of Electrical Technology & Information, "KOMIPO, INCHEON Combined Cycle Power Plant Completed, 30 billion won saved", 2006. Available: http://www.energy.co.kr/atl/view/asp?a_ id=795.
  5. Lee Mihae, The Export Import Bank of Korea Overseas Economy Research Center, The Office of Industrial Investment Investigation, "Activation Measure for Thermal Power Plant Overseas Advan cement", 2014, Vol. 2014_P_01, pp.6.