FACTORS AFFECTING THE SUCCESS/FAILURE OF ROAD INFRASTRUCTURE PROJECTS UNDER PPP IN INDIA

  • Published : 2017.12.31

Abstract

India has accorded a high priority to road infrastructure development through Public-Private Partnership (PPP) and it has set a high target for investment inflows. Yet, it is widely held that road/highway infrastructure has not been developing at required pace and that the road infrastructure projects under PPP have been suffering from several hurdles and delays, thereby affecting project success/failure. This paper is an attempt to analyze the critical success/failure factors of road infrastructure projects under PPP in India. A questionnaire survey was conducted among a sample of the stakeholders of road infrastructure projects to identify the critical success/failure factors during all four major project stages using different approaches. Initially, the critical factors were identified through ranking based on the average/mean score. Later, the conventional RII score was used to identify the critical success/failure factors. Finally, the critical success/failure factors were also identified based on the stakeholder-wise ranking of the factors and their convergence. The assessment revealed that there was a greater convergence across the different methods and also that there was greater consensus among project stakeholder on the critical success/failure factors of road PPP projects.

Keywords

References

  1. Akintoye, A., M., Hardcastle,C., Chinyio, E. and Asenova, D.Framework For Risk Assessment and Management of Private Finance Initiative Projects. Glasgow: Glasgow Caledonion University, 2001.
  2. Atkinson, R. Project management: cost, time and quality, Two best guesses and a phenomenon, International Journal of Project Management 17(6): 337-343, 1999 https://doi.org/10.1016/S0263-7863(98)00069-6
  3. Chan, D. W. M. and Kumaraswamy, M. M., 'A Comparative Study of Causes and Time Overruns in Hongkong Construction Projects', International Journal of Project Management 15(1): 55-63, 1997. https://doi.org/10.1016/S0263-7863(96)00039-7
  4. Cooke-Davies T. J., 'The real success factors of projects', International Journal of Project Management 20(2): 185-190, 2002. https://doi.org/10.1016/S0263-7863(01)00067-9
  5. Deeppa, K. and I Krishnamurthy, 'Analysis of Time and Cost Overruns in Infrastructure Projects', NICMAR Journal of Construction Management and Research XXIX(3): 7-19, 2014.
  6. DNA, "Most Infrastructure Projects in India running way behind deadline" DNA July 23, 2014 (accessed at http://www.dnaindia.com/india/most_infrastructure_projects_in_indi a_running_way_behind_deadline_2004486)
  7. Doloi, H., "Cost overruns and Failure of Project Management: Understanding the Roles of Key Stakeholders in Construction Projects" Journal of Construction Engineering and Management 2013(139): 267-279 , 2013.
  8. Farhan, A. and A. Talware, 'Identification of Causes of Dispute and Effectiveness of Resolution Mechanism in Indian Construction Industry', NICMAR Journal of Construction Management and Research XXX(2): 27-35, 2015.
  9. GoI, Approach to the Twelfth Five Year Plan, Planning Commission, Government of India (GoI), New Delhi, 2012.
  10. Hardcastle, C., Edwards,P.J., Akintoye,A., Li,B., 'Critical Success Factors For PPP/PFI Projects in the UK construction Industry: A Factor Analysis Approach', In Ng, T.S. (Ed.), Public Private Partnerships: Opportunities and Challenges, Centre for Infrastructure and Construction Industry Development, University of Hong Kong, Pokfulam, pp. 75-83, 2006.
  11. Hariharan S and P. H. Sawant, "Analysis of Relationship between Time and Cost Overruns in Some Infrastructure Projects", NICMAR Journal Of Construction Management Volume XXVII, No. 2, pp 5- 16 (April - June & July - September 2012)
  12. Kalidindi S N and Singh L B. 'Financing road sector projects using PPP Scheme, Proceedings of the 2009 Mid-Continent Transportation Research Symposium, Ames, Iowa (August 2009)
  13. Kalidindi S N and Thomas A V., 'Private sector participation in road projects in India: assessment and allocation of critical risks, In A Akintoye, M Beck and C Hardcastle (eds), Public-Private Partnerships: Managing risks and opportunities, Blackwell Publishers, Oxford (pp 317-350)
  14. Kamal, S., Renuka, S. M., and C. Umarani, 'Challenges for HR Professionals in Construction Industry: Engineers Attrition Risk', NICMAR Journal of Construction Management and Research XXX(1): 89-100, 2015.
  15. KPMG-PMI, "Study on project schedule and cost overruns" Expedite infrastructure projects". Report prepared by Project Management Institute (PMI) and KPMG (Available online at http://www.kpmg.com/IN/en/IssuesAndInsights/ArticlesPublications /Documents/PMI-KPMG-2013.pdf)
  16. Maniar, H., 'Risk Analysis of Infrastructure Projects: A Case Study on BOT Projects in India', The IUP Journal of Financial Risk Management VII(4): 34-54, 2010.
  17. Nallathiga, R., "Success or failure of large development projects: Is compensation of displacement an issue?" Projects and Profits August 2009.
  18. Nallathiga, R. and M N Shah, "Public-private Partnerships in Road development sector in India", In R K Mishra, R Gangakhedkar, S Mishra and M C Shekar (Eds) Public Private Partnership: The Need of the Hour, Bloomsbury Publishing India Pvt Ltd, New Delhi (pp 241-263, 2013)
  19. Nallathiga, R., Kumar, M. A., Kumar D. V. and Kumar, G. A., 'Determinants of the Success of Real Estate Projects: A Study of Select Firms in Hyderabad', NICMAR Journal of Construction Management and Research XXVII(2&3): 38-52, 2012.
  20. Nallathiga, R., Wakhloo, A. and Bhattacharya, A., "Stakeholders' assessment of delays in Infrastructure projects and their causal factors", Proceedings of PMI Research and Academic Conference 2015 held at National Institute of Industrial Engineering (NITIE), Mumbai on February 13-15, 2015.
  21. NSDC, Human Resource and Skill Requirement in the Building and Real Estate Services Sector 2022, National Skill Development Council (NSDC), New Delhi, 2012.
  22. Oke, A. E. and I. L. Ukaeke, 'Factors responsible for Effective and Ineffective Teams in Nigerian Construction Industry', NICMAR Journal of Construction Management and Research XXVIII(4): 5-16, 2013.
  23. Patel, C. H., Chaturvadi, A., Rao, M R., Katta, P. and K N N Prasad, 'An Analysis of Cost and Time Overruns in Construction Projects', NICMAR Journal of Construction Management and Research XXX(2): 37-50, 2015.
  24. Patil, S.K., A.K. Gupta, D. B. Desai and A.S. Sajane, "Time Performance of Different Types Of Construction Projects In Western Maharashtra" International Journal of Research in Engineering and Technology, 2(11): 71-80, 2013.
  25. PPP India, Database of PPP projects under various stages, PPP Cell, Government of India, New Delhi, 2012.
  26. Project Monitor, "Delays and cost overruns infest 60% of central sector infra projects" Article posted on Project Monitor Online (viewed on August 11, 2014)
  27. Pundir, A. K., Ganapathy, L. and R. Sahu, 'Success Factors for Construction Projects: A Survey of select Projects', NICMAR Journal of Construction Management and Research XXVI(4): 5-18, 2011.
  28. Raghuram, G., Sebastian Morris and Satyam Shivam Sundaram, "Mega Projects In India: Environmental and Land Acquisition Issues in the Road Sector", Research Paper, Indian Institute of Management, Ahmadabad , 2010.
  29. Rajan, T. A., G Gopinath and M Behere, "PPPs and Project overruns: Evidence from Road Projects in India" Journal of Construction Engineering and Management 2014(140): 267-279, 2014.
  30. Ram Singh, ""Delays and Cost Overruns in Infrastructure Projects: Extent, Causes and Remedies" Economic and Political Weekly of India Vol - XLV No. 21, May 22, 2010.
  31. Salanke, P. V. and M. El-Gafy, 'Factors Influencing Energy Savings Measures for Urban Residential Buildings', NICMAR Journal of Construction Management and Research XXVIII(1): 17-30, 2013.
  32. Singh, Karunendra Pratap, "Issue and Prospects Of Public Private Partnership In India"-International Journal Of Multidisciplinary Research, Volume 1, Issue 5, September 2011, ISSN 2231 5780, 2011.
  33. Upadhyay, V. and C. Sinha, "Regulatory and Policy Regime of Land Acquisition: A State-level Perspective", India Infrastructure Report 2009, Oxford University Press, Delhi, 2009.
  34. Venkatesh, M. P., C. Umarani, S. M. Renuga and M. Balasubramanian Malathi, "Analysis and Identification of Critical Factors of Delay in Construction Projects" NICMAR : Journal of Construction Management, Volume XXVI, Issue 2 (April - June 2011)
  35. Zhang, X., 'Critical Success Factors for Public-Private Partnerships in Infrastructure Development, ASCE Journal of Construction Engineering and Management 13(1): 3-14, 2005.