References
- Avunduk, E., Copur, H. (2018), "Empirical modeling for predicting excavation performance of EPB TBM based on soil properties", Tunnelling and Underground Space Technology, Vol. 71, January 2018, pp. 340-353. https://doi.org/10.1016/j.tust.2017.09.016
- Bilgin, N., Copur, H., Balci, C. (2012), "Effect of replacing disc cutters with chisel tools on performance of a TBM in difficult ground conditions", Tunnelling and Underground Space Technology, Vol. 27, No. 1, pp. 41-51. https://doi.org/10.1016/j.tust.2011.06.006
- Burger, W. (2006), "Hard rock cutterhead design", Proceedings of the North American Tunneling 2006 Conference, Chicago, pp. 257-263.
- Copur, H., Aydin, H., Bilgin, N., Balci, C., Tumac, D., Dayanc, C. (2014), "Predicting performance of EPB TBMs by using a stochastic model implemented into a deterministic model. Tunnelling and Underground Space Technology", Vol. 42, May 2014, pp. 1-14. https://doi.org/10.1016/j.tust.2014.01.006
- Cundall, P.A., Strack, O.D. (1979), "A discrete numerical model for granular assemblies", Geotechnique, Vol. 29, No. 1, pp. 47-65. https://doi.org/10.1680/geot.1979.29.1.47
- Di Maio, F.P., Di Renzo, A. (2005), "Modelling particle contacts in distinct element simulations: linear and non-linear approach", Chemical Engineering Research and Design, Vol. 83, No. 11, pp. 1287-1297. https://doi.org/10.1205/cherd.05089
- Di Renzo, A., Di Maio, F.P. (2004), "Comparison of contact-force models for the simulation of collisions in DEM-based granular flow codes", Chemical Engineering Science, Vol. 59, No. 3, pp. 525-541. https://doi.org/10.1016/j.ces.2003.09.037
- Di Renzo, A., Di Maio, F.P. (2005), "An improved integral non-linear model for the contact of particles in distinct element simulations", Chemical Engineering Science, Vol. 60, No. 5, pp. 1303-1312. https://doi.org/10.1016/j.ces.2004.10.004
- EDEM (2017), EDEM User's Manual, DEM solution, Edinburgh.
- Gehring, K. (2009), "The influence of TBM design and machine features on performance and tool wear in rock. Der Einfluss von TBM-Konstruktion und Maschineneigenschaften auf Leistung und Werkzeugverbrauch in Gestein", Geomechanics and Tunnelling, Vol. 2, No. 2, pp.140-155. https://doi.org/10.1002/geot.200900015
- Gong, Q.M., Jiao, Y.Y., Zhao, J. (2006), "Numerical modelling of the effects of joint spacing on rock fragmentation by TBM cutters", Tunnelling and Underground Space Technology, Vol. 21, No. 1, pp. 46-55. https://doi.org/10.1016/j.tust.2005.06.004
- Gong, Q.M., Zhao, J., Jiao, Y.Y. (2005), "Numerical modeling of the effects of joint orientation on rock fragmentation by TBM cutters", Tunnelling and Underground Space Technology, Vol. 20, No. 2, pp. 183-191. https://doi.org/10.1016/j.tust.2004.08.006
- Hertz, H. (1882), "Uber die Beruhrung fester elastischer Korper", Journal fur die reine und angewandte Mathematik, Vol. 92, pp. 156-172.
- KICT (2015), Development of optimized TBM cutterhead design method and high-performance disc cutter, ISBN 979-11-954377-2-6, Korea Agency for Infrastructure Technology Advancement, pp. 7-9.
- Labra, C., Rojek, J., Onate, E. (2017), "Discrete/finite element modelling of rock cutting with a TBM disc cutter", Rock Mechanics and Rock Engineering, Vol. 50, No. 3, pp. 621-638. https://doi.org/10.1007/s00603-016-1133-7
- Li, X., Yuan, D., Huang, Q. (2017), "Cutterhead and cutting tools configurations in coarse grain soils", The Open Construction and Building Technology Journal, Vol. 11, No. 1, pp. 182-199. https://doi.org/10.2174/1874836801711010182
- Liu, J., Cao, P., Du, C.H., Jiang, Z., Liu, J.S. (2015), "Effects of discontinuities on penetration of TBM cutters", Journal of Central South University, Vol. 22, No. 9, pp. 3624-3632. https://doi.org/10.1007/s11771-015-2903-1
- Lv, Y., Li, H., Zhu, X., Liu, W. (2017), "Discrete element method simulation of random Voronoi grainbased models", Cluster Computing, Vol. 20, No. 1, pp. 335-345. https://doi.org/10.1007/s10586-016-0705-3
- Maidl, U., Comulada, M. (2011), "Prediction of EPB shield performance in soils", Proc. of the In Rapid Excavation and Tunneling Conference, January 2011, pp. 1083-1091.
- Maynar, M.J., Rodriguez, L.E. (2005), "Discrete numerical model for analysis of earth pressure balance tunnel excavation", Journal of Geotechnical and Geoenvironmental Engineering, Vol. 131, No. 10, pp. 1234-1242. https://doi.org/10.1061/(ASCE)1090-0241(2005)131:10(1234)
- Mindlin, R.D. (1949), "Compliance of elastic bodies in contact", Journal of Applied Mechanics, Vol. 16, pp. 259-268.
- Moon, T., Oh, J. (2012), "A study of optimal rock-cutting conditions for hard rock TBM using the discrete element method", Rock mechanics and rock engineering, Vol. 45, No. 5, pp. 837-849. https://doi.org/10.1007/s00603-011-0180-3
- Onate E., Owen R. (2011), Particle-Based Methods. Computational Methods in Applied Sciences, Vol. 25, Springer, Dordrecht, pp. 247-267.
- Peng, B. (2014), Discrete element method (DEM) contact models applied to pavement simulation, Ph.D. Thesis, Virginia Polytechnic Institute and State University, pp. 19-23.
- Rostami, J., Ozdemir, L. (1993), "A new model for performance prediction of hard rock TBMs", Proc. of the Rapid Excavation and Tunneling Conference, Society for Mining, Metallurgy & Exploration, INC, pp. 793-793.
- Sakaguchi, H., Ozaki, E., Igarashi, T. (1993), "Plugging of the flow of granular materials during the discharge from a silo", International Journal of Modern Physics B, Vol. 7, No. 09n10, pp. 1949-1963. https://doi.org/10.1142/S0217979293002705
- Tarkoy, P.J. (2009), "Simple and practical TBM performance prediction. Einfache und praxistaugliche Voraussage von TBM-Leistungen", Geomechanics and Tunnelling, Vol. 2, No. 2, pp. 128-139. https://doi.org/10.1002/geot.200900017
- Tsuji, Y., Tanaka, T., Ishida, T. (1992), "Lagrangian numerical simulation of plug flow of cohesionless particles in a horizontal pipe", Powder Technology, Vol. 71, No. 3, pp. 239-250. https://doi.org/10.1016/0032-5910(92)88030-L
- Ucgul, M., Fielke, J.M., Saunders, C. (2014), "Three-dimensional discrete element modelling of tillage: Determination of a suitable contact model and parameters for a cohesionless soil", Biosystems Engineering, Vol. 121, May 2014, pp. 105-117. https://doi.org/10.1016/j.biosystemseng.2014.02.005
- Wu, L., Guan, T., Lei, L. (2013), "Discrete element model for performance analysis of cutterhead excavation system of EPB machine", Tunnelling and Underground Space Technology, Vol. 37, August 2013, pp. 37-44. https://doi.org/10.1016/j.tust.2013.03.003
- Wu, L., Liu, C. (2014), "Modeling of shield machine tunneling experiment by discrete element method", Applied Mechanics and Materials, Vols. 556-562, pp. 1200-1204. https://doi.org/10.4028/www.scientific.net/AMM.556-562.1200
- Yagiz, S., Karahan, H. (2015), "Application of various optimization techniques and comparison of their performances for predicting TBM penetration rate in rock mass", International Journal of Rock Mechanics and Mining Sciences, Vol. 80, December 2015, pp. 308-315. https://doi.org/10.1016/j.ijrmms.2015.09.019
- Yazdani-Chamzini, A., Yakhchali, S.H. (2012), "Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods", Tunnelling and Underground Space Technology, Vol. 30, July 2012, pp. 194-204. https://doi.org/10.1016/j.tust.2012.02.021