Abstract
ccording to the airport railroad linkage facility expansion project constructing a connecting line to the airport railway and improving the signal system and Gyeongui Susaek Station, a high-speed train is able to run directly from Gyeongbu and Honam to the airport railway. According to mixed operation of high-speed Korea Train Express (KTX) and Airport Railroad Express (AREX) trains, to establish ERTMS/ETCS L1 ATP to operate the KTX train, the signaling system of the AREX train is the same as the existing ATC/ATO, but its operation became impossible because the high-speed train causes mutual interference between the "high-speed train (KTX) and AREX ground signaling equipment" and between the "AREX train and KTX (high-speed train) ATP ground equipment." Thus, it was necessary to have a supplemental technical interference analysis comparing the characteristics of the AREX beacon and the KTX balise. So, we resolve the problems of mutual interference between the "high-speed train (KTX) and AREX ground signaling equipment" and between the "AREX train and KTX (high-speed train) ATP ground equipment" with a test using an actual train, and we confirm the technical validity with three types of test module.
공항 철도 연계 시설 확충 사업에 따라 수색역구내에서 공항 철도로 연결선(L=2.2km)을 건설하고 신호 시스템 및 정거장을 개량하여 경의선 수색역에서 공항 철도로 경부선 및 호남선 고속열차(KTX)를 직결 운행 할 수 있도록 하였다. KTX/AREX 열차의 혼용 운행에 따른 AREX 전동 열차의 신호 시스템은 기존과 동일한 ATC /ATO 방식으로 운행하고 KTX 고속 열차는 ERTMS/ETCS L1 ATP 방식을 신설하여 운행하기로 하였으나 "고속 열차(KTX)와 공항 철도의 지상 신호 설비" 간 및 "공항 철도 차량(AREX)과 고속 열차용 ATP 시스템 지상 설비간 상호 간섭 등의 문제점으로 인하여 고속 열차 운행이 불가능하게 되었다. 이에 공항 철도 비콘과 KTX 열차용 발리스의 특성을 비교 분석한 결과 상호 간섭에 대한 기술적 보완이 필요함을 확인하게 되었다. 따라서 이러한 복합적인 문제의 해결과 기술적 타당성을 확인하기 위해 3가지 유형의 시험 모듈로 실제의 열차를 이용하여 시험을 함으로서 "고속열차(KTX)와 공항 철도 지상 신호 설비간" 및 "공항 철도 전동차(AREX)와 고속 열차용 ATP시스템 지상 설비" 간 상호 간섭 등의 문제점을 해소하고자 한다.