Success Factors of Highway Construction Projects in Egypt: AHP Approach

  • Published : 2016.12.01

Abstract

While the idea of the existence of a set of key factors for success in planning, designing and construction of projects is not new, it remains one of the most important issues in the field of construction management. This is due to project success factors are inputs to project management practice which can lead directly or indirectly to project success. This study identifies the success factors which can be used for improving the highway projects performance in Egypt during the project pre-construction and construction phases. Through a detailed literature review 35 success factors are identified. Furthermore, the AHP is adopted to prioritize the studied factors through the application of questionnaire survey. The study establishes that implementing an effective quality control and assurance systems, allow sufficient time for feasibility studies, design, drawing and tender preparation, effective cost control system and frequency of project budget updates, preparing adequate designs and drawings and determining sufficient time to implement the desired scope of work are the most important success factors for enhancing the highway projects performance in Egypt.

Keywords

References

  1. A. Chan and A. Chan, "Key performance indicators for measuring construction success", Benchmarking: An International Journal, vol. 11, no. 2, pp. 203-221, 2004. https://doi.org/10.1108/14635770410532624
  2. V. Sanvido et al., "Critical success factors for construction projects", Journal of Construction Engineering and Management, vol. 118, no. 1, pp. 94-111, 1992. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(94)
  3. N. Long, et al., "Large construction projects in developing countries: a case study from Vietnam", International Journal of Project Management, vol. 22, no. 7, pp.553-561, 2004. https://doi.org/10.1016/j.ijproman.2004.03.004
  4. V. Handa and A. Adas, "Predicting the level of organizational effectiveness: a methodology for the construction firm", Construction Management and Economics, vol. 14, no.4, pp. 341-352,1996. https://doi.org/10.1080/014461996373412
  5. T. Williams, "Risk management infrastructures", International Journal of Project Management, vol.11, no.1, pp.5-10, 1993. https://doi.org/10.1016/0263-7863(93)90003-6
  6. A. Chan, D. Scott, D. and A. Chan, "Factors affecting the success of construction projects" Journal of Construction Engineering and Management , vol. 130, no. 1, pp. 153-155, 2004. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(153)
  7. N. Gudiene, et al., "Identification and evaluation of the critical success factors for construction projects in Lithuania: AHP approach", Journal of Civil Engineering and Management, vol. 20, no.3, pp. 350-359, 2014. https://doi.org/10.3846/13923730.2014.914082
  8. S. Tabish and K. Jha, "Important factors for success of public construction projects", Proceedings of the 2nd International Conference on Construction and Project Management, Singapore, vol. 15, pp. 64-68, 2011.
  9. N. Gudiene et al, "Development of a conceptual critical success factors model for construction projects: a case of Lithuania", Procedia Engineering, vol. 57, pp. 392-397, 2013. https://doi.org/10.1016/j.proeng.2013.04.051
  10. J. Rockart, "The changing role of the information systems executive: a critical success factors perspective", Sloan Management Review, vol. 24, no. 1, pp.3-13, 1982.
  11. J. Reh, "How to use benchmarking in business: who's best? how good are they? how do we get that good? about: management", [Online]. Available: http://management.about.com/cs/benchmarking/a/benchmarking.htm, [Accessed 3 April 2016].
  12. D. Chua, C. Kog, and P. Loh, "Critical success factors for different project objectives", Journal of Construction Engineering and Management, vol. 125, no. 3, pp. 142-150, 1999. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(142)
  13. J. Yu and H. Kwon, "Critical success factors for urban regeneration projects in Korea", International Journal of Project Management, vol. 29, no. 7, pp. 889-899, 2011. https://doi.org/10.1016/j.ijproman.2010.09.001
  14. S. McCabe, "Benchmarking in Construction." Blackwell Science, UK, 2008.
  15. A. Chan, "Determinants of project success in the construction industry of Hong Kong", PhD Thesis, The International Centre for Management and Organisational Effectiveness, Faculty of Business and Management, University of South Australia, Australia, 1996.
  16. J. Pinto and D. Slevin, "Project success: definitions and measurement techniques", Project Management Journal, pp. 67-72, 1988.
  17. E. Jaselskis and D. Ashley, "Optimal allocation of project management resources for achieving success", Journal of Construction and Engineering Management, vol. 117, no. 2, pp. 321-340, 1991. https://doi.org/10.1061/(ASCE)0733-9364(1991)117:2(321)
  18. S. Toor, S. and S. Ogunlana, "Construction professionals' perception of critical success factors for large-scale construction projects", Construction Innovation, vol. 9, no. 2, pp. 149-167, 2009. https://doi.org/10.1108/14714170910950803
  19. C. Jacobson and S. Choi, "Success factors: public works and public private partnerships", International Journal of Public Sector Management, vol. 21, no. 6, 637-657, 2008. https://doi.org/10.1108/09513550810896514
  20. Timetric, "Construction in Egypt - key trends and opportunities to 2016", [Online]. Available: http://www.marketresearch.com/Timetric-v3917/Construction-Egypt-Key-Trends-Opportunites-7084362, [Accessed 23 October 2013].
  21. I. Farag, "SWOT analysis of road transport sector in the Arab region", IRU Academy, Alexandria, Egypt, 2012.
  22. PWC's Staff Reporter, "Africa gearing up-future prospects in Africa for the transportation & logistics industry", [Online]. Available: http://www.pwc.com/africagearingup, [Accessed 13 March 2015].
  23. C. Kaliba, M. Muya, and K. Mumba, "Cost escalation and schedule delays in road construction projects in Zambia", International Journal of Project Management, vol. 27, no. 5, pp. 522-531, 2009. https://doi.org/10.1016/j.ijproman.2008.07.003
  24. World Bank Group, "Proposed road infrastructure and transport development project", Unpublished concept note, Arab Republic of Egypt. Washington, D.C., 2007.
  25. R. Aziz and A. Abdel-Hakam, "Exploring delay causes of road construction projects in Egypt", Alexandria Engineering Journal,vol.35, no. 2, pp.1515-1539, 2016.
  26. A. EL-Touny, "Estimating contingency cost for highway construction projects", M.S. Thesis, Construction Engineering Department, Faculty of Engineering, Zagazig University, Egypt, 2013.
  27. A. El Dahan, et al., "High traffic fatality rate caused by faulty road and vehicle maintenance", [Online]. Available: https://academic.aucegypt.edu/caravan/story/high-traffic-fatality-rate-caused-faulty-road-and-vehicle-maintenance , [Accessed 6 July 2016].
  28. Y. Frimpong, J. Oluwoye and L. Crawford, "Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study", International Journal of Project Management, vol. 21, no.5, pp.321-326, 2003. https://doi.org/10.1016/S0263-7863(02)00055-8
  29. Z. Alias, et al., "Determining critical success factors of project management practice: a conceptual framework", Procedia - Social and Behavioral Sciences, vol. 153, pp.61-69, 2014. https://doi.org/10.1016/j.sbspro.2014.10.041
  30. S. H. Whi, et al., "Exploring success factors of social infrastructure projects in Malaysia", International Journal of Engineering Business Management, vol.5, no. 2, pp. 1-9, 2013. https://doi.org/10.5772/52800
  31. T. Saaty, "The analytic hierarchy process: planning, priority setting, resources allocation", McGraw-Hill, London, England, 1980.
  32. S. Oguztimur, "Why fuzzy analytic hierarchy process approach for transport problems?", Proceedings of the ERSA Congress, Barcelona, Spain, 2011.
  33. M. Berrittella, et al., "An analytic hierarchy process for the evaluation of transport policies to reduce climate change impacts" , Fondazione Eni Enrico Mattei Working Papers, Paper 61, 2007.
  34. C. Kaliba, "Cost escalation, schedule overruns and quality shortfalls on construction projects", M.S. Thesis, Department of Civil and Environmental Engineering, School of Engineering, University of Zambia, Lusaka, Zambia, 2010.
  35. T. Saaty, "Decision making with the analytic hierarchy process", International Journal of Services Sciences, vol. 1, no. 1, pp. 83-98, 2008. https://doi.org/10.1504/IJSSCI.2008.017590
  36. J. Tah, A. Thorpe and R, McCaffer, "A survey of indirect cost estimating in practice", Construction Management and Economics, vol.12, no.1, 1994. pp.12-36, 1994.
  37. S. Al Wahaidi, "An analytical hierarchy process (AHP) based prequalification system for Gaza strip construction contractors", M.S. Thesis, Faculty of Engineering, Islamic University, Gaza, Palestine, 2012.