Acknowledgement
Supported by : 국토교통부
References
- Cho, J. (2015). A Study on Reducing Procurement Lead Time by Analyzing the Duration of Procurement Activities in Plant Projects, Thesis, Hanyang University, 1.
- Cho, K. (2013). Possibility of SCM application for curtain wall construction business improvement, Thesis, Changwon National University, 10-11, 17.
- Choi, C., Han, C., & Lee, J. (2013). An Effective Logistics Process Modeling for Plant Projects, Journal of the architectural institute of korea Structure & Construction, 29(5), 87-95. https://doi.org/10.5659/JAIK_SC.2013.29.5.87
- Kang, H., Kim, M., Kim, S., & Kim, Y. (2012). A Study on the Analysis of Risk Factors in Engineering, Procurement and Construction Phase for Overseas Plant Project, Journal of Architectural Institute of Korea Structure & Construction, 28(5), 111-118. https://doi.org/10.5659/JAIK_SC.2012.28.5.111
- Kim, J (2011). A study of Logistics Management in Plant Project Thesis, Kyung Hee University, 18
- Kim, H. 20(2015). Project Life Cycle Estimation List and Methodologies for LNG Power Plant, Thesis, Myongji University, 18-19.
- Lee, T., Park, E., & Lee, D. (2011). Development of Supply Chain Management Education Programs for the Construction Industry, Journal of the Korean Society of Civil Engineers D, 31(2D), 275-284.
- Lee, Y (2002), theoretical and practical of Supply Chain Management, korea, youngkag.moon, 41-46.
- Lim, H., Park, S., Chun, J. (2005). The Supply Chain Management Process Model for Systematizing Curtain Wall Engineering, Journal of Architectural Institute of Korea, 25(1), 547-550.
- Park, H., Kim, W., Chong, Y., & Won, S. (2013). A Fundamental Research for Technology area of SCM in Korean Nuclear Power Plant Construction, The Korean Institute of Building Construction, 13(1), 268-270.
- Park, H., & Won, S. (2012). A Fundamental Research for Adaptation Method of SCM in Korean Nuclear Power Plant Construction, The Korean Institute of Building Construction, 12(2), 229-231.
- Park, S. (2003). A Study on the Construction Industry about the Role and Strategy of the Supply Chain Management, Thesis, SungKyunKwan University, 9-10, 13-15.
- Park, S., Kim, Y., & Chin S. (2003). Implementation of Supply Chain Management In Construction Industry, Korean journal of Construction Engineering and Management, 4(3), 85-94.
- Park, Y. (2005), Guide for SCM Introduction, korea, Korea Chamber of Commerce & Industry, 43.
- Shin, D. (2014). Study on Current Situation and Improvement Plan for Procurement through Case Study on Plant Project, Thesis, Chung-An University, 1, 41.
- Won, S., Kang, M., Lee, J., Kim, S., & Han, C. (2008). An Analysis of Procurement Processes for the Application of System Prototype of Overseas Plant Projects, Journal of Architectural Institute of Korea Structure & Construction, 24(2), 113-120.
- Won, S., Lee, J., & Han, C. (2009). Analysis of Pre-construction Processes and Development of KMS Prototype of LNG Plant Projects, Journal of The Korean Institute of Building Construction, 9(6), 151-159. https://doi.org/10.5345/JKIC.2009.9.6.151
- Yeo, K., & Ning, J. (2006). Managing uncertainty in major equipment procurement in engineering projects, European Journal of operational Research, 171, 123-134. (Received Oct. 26 2015 Revised Dec. 8 2015 Accepted Apr. 29 2016) https://doi.org/10.1016/j.ejor.2004.06.036