Abstract
Design modification is one of the elements that must be controlled in the process of any construction project. Especially a military facility project comes with more obstacles than private work due to the unique characteristics and closeness of the military. As there are both the project manager and the user within the ordering body, it is likely to have difficulties unless communication is conducted smoothly. The reason is that such issues regarding communication lead to design modification and it will result in the user's dissatisfaction. Thus this study aimed to identify the elements that generally cause design modification by analyzing characteristics of military projects from the status of current project contracts, analyzing past elements that lead to design modification and comprehensively researching responds from the survey on operators of facility projects. It is expected that loss from design modification of military facility projects is reduced by proposing feasible and practical improvements.
설계변경은 건설 사업을 진행하는데 있어 필수적으로 관리되어야 하는 요소 중 하나이다. 특히 군 시설사업은 군 조직의 특수성과 폐쇄성으로 민간공사보다 많은 어려움이 존재한다. 발주처 내에 사업관리자와 사용자가 존재하고 있어 사업을 추진할 때, 의사소통이 원활하게 이뤄지지 못한다면 어려움을 겪을 수 있다. 의사소통의 문제가 설계변경으로 이어지고 사용자 불만족으로 표출되기 때문이다. 따라서 본 연구에서는 군 시설사업의 계약현황을 통한 특성을 분석하고 과거 시설사업의 설계변경의 요인을 분석하고, 설문조사를 통해 시설사업관련자들의 다양한 의견들을 종합 분석하여 군 시설사업의 설계변경 요인을 도출하였다. 이에 대해 실현가능한 개선방안을 제시함으로서 군 시설사업을 진행하는데 있어 설계변경에 의한 손실이 감소될 것으로 기대된다.