References
- Son CH, Hong SH, Kim HJ. Strategies for improving a measurement system of standard unit productivity data on construction projects. Journal of the Architectural Institute of Korea. 2010 Jun;26(6):157-66.
- Ha GJ, Choi MK, Yi DR, Ha MS. Improving method of historical cost data through developed countries case study. Proceedings of Annual Conference of the Architectural Institute of Korea - Region Association; 2008 Dec 3; Yangsan, Korea, Daegu (Korea): Architectural Institute of Korea - Region Association; 2008. p. 541-4.
- Ha GJ, Choi MK, Yi DR, Lee YS, Kang TK, Ha MS. A study on the application methods of historical data cost method by historical data analysis in construction cost. Proceedings of Annual Conference of the Architectural Institute of Korea - Region Association; 2008 Dec 3; Yangsan, Korea. Daegu (Korea): Architectural Institute of Korea - Region Association; 2008. p. 531-4.
- Son CB, Shin WS, Lee DE. Development of work manual for efficient enactment and/or revision of construction standard production unit system. Journal of the Architectural Institute of Korea. 2012 Dec;28(12):95-102.
- Cho JH, Chun JY. The proper construction cost estimating method based on the actual cost data. Proceedings of Annual Conference of the architectural Institute of Korea; 2001 Apr 28; Ansan, Korea. Seoul (Korea): Architectual Institute of Korea; 2001. p. 425-8.
- Jeon SH, Koo KJ. Comparison between Labor Inputs by Quantity per Unit Method and by Actual Data Method in the Apartment Housing Construction Work: focusing on Masonry.Plaster.Waterproofing.Tile Labors. Korean Journal of Construction Engineering and Management. 2015 Jan;16(1):110-8. https://doi.org/10.6106/KJCEM.2015.16.1.110
- Lee DE, Son CB. Identifying the issues relative to enactment and/or revision of construction standard production unit system and its improvement measures. Journal of the Architectural Institute of Korea. 2011 Jun;27(6):131-40.
- Shin DW, Lee YD, Shin YS, Kim GH, Yoo SR, Park WJ. Study on improvement of cost caculation method in construction less than one day workload. Journal of The Korea Institute of Building Construction. 2014 Oct; 14(5):477-85. https://doi.org/10.5345/JKIBC.2014.14.5.477
- Kang DW. A study on cost data prototype based production crew through productivity analysis of form work [mater's thesis]. [Seoul (Korea)]: University of Seoul; 2010. 103 p.
- Cho HH, Kang KI. Development of project management system based on daily report for historical data acquisition and storage. Journal of the Architectural Institute of Korea. 2001 Nov; 17(11):123-30.
- Choi JM, Kim U. A study on the development of the human resource management system using a daily report information. Proceedings of Autumn Annual Conference of the Architectural Institute of Korea; 2004 Oct 29-30; Goseong, Korea. Seoul (Korea): Architectural Institute of Korea; 2004. p. 1179-82.
- Yoon SW, Choi JM, Sohn YS. A prototype daily report system using cloud computing and BIM technology. Proceedings of Spring Annual Conference of the Architectural Institute of Korea; 2013 Apr 27; Incheon, Korea. Seoul (Korea): Architectural Institute of Korea; 2013. p. 585-6.
- Lee KH, Yun JC. Characteristics of periodical changes on standard of estimated unit manpower and material of landscape architectural construction korea. Journal of the Korean Institute of Landscape Architecture. 2009 Apr; 37(1):131-8.
- Kim BN, Kim CD. A plan for better productivity of sub-contractors through improvements of daily reporting process. Proceedings of Spring Annual Conference of the Architectural Institute of Korea; 2013 Apr 27; Incheon, Korea. Seoul (Korea): Architectural Institute of Korea; 2013. p. 585-6.
- Jeong MG. A measurement of one day workload using digital pen technology [mater's thesis]. [Suwon (Korea)]: Kyonggi University; 2015. 88 p.
- Lee HJ, Sim H, Son CS, Oh JC. Barcode-based low-cost portable training attendance management system development. The Korea Institute of Electronic Communication Sciences. 2013 Nov;8(11):1733-40. https://doi.org/10.13067/JKIECS.2013.8.11.1733