DOI QR코드

DOI QR Code

민간 건설 공동주택 공간별 설계변경 요인의 중요도 분석

The Analysis of Importance Change Order Factors in Space for Private Construction of Apartment Houses

  • 투고 : 2015.12.03
  • 심사 : 2016.02.12
  • 발행 : 2016.02.29

초록

As the apartment complex became one of representative residential facility, changes occur in all phase of a construction phase caused by unexpected situation, uncertain factors and change of project plan. It is essential to implement an appropriate change management regime to reduce change-associated cost and time delay. Studies and research on changes has been focused on very general buildings or specialized buildings. As a result, there are limitations to apply as change factors for apartment complex projects with prior studies. here fore, in this study, it was classified tenement house space to function space configuration to derive the importance of change order factors for each apartment space. This study categorize the functional space in order to analysis the importance factor for private apartment houses change orders. With literature review and case study of private apartment change orders, the change order factors has been used for interview with experts who was involved in private apartment houses. After interviewing with experts, factors for change orders has been selected. The importance level has been fixed by interviewing every participants of private apartment houses with method of AHP(Analytic Hierarch Process). This study indicates the effective change management for private apartment houses with final result of factors and importance on change orders.

키워드

참고문헌

  1. Ahn, H. (2006). Priority Research of Apartment Planning Factor by Using AHP Method-Focused on user demand in Daejon, Thesis, Hanbat National University, 8.
  2. Jo, K., Jo, Y., & Kang, H. (2003). The Analytic Hierarchy Process. Donghyun Press, 4, 5-11.
  3. Jung, B., & Woo, D. (2008). Study on the domestic Public Housing Characteristics and planned directivity, journal of the regional association of architectural institute of korea, 1, 21-24.
  4. Kim, S., Nam, H., Lee, J., Shin, C., & Chun, J. (2009). Case Survey Analysis for the Proper Design Changes Management, Proceeding of Annual Conference of the Architectural Institute of Korea, 29(1), 605-608.
  5. Kim, J. (2010). Analysis for Causes of the Change Order in Private University Construction Projects, Thesis, Pukyong University, 21-22.
  6. Kim, K. (2014). Assessment of Relative Importance and Improvement Reseaarch through the Analysis of Factor Causin Design in Private Construction Project, Pusan University, 16-22.
  7. Lee, K. (2008). Analysis and Improved Methods Suggestion of Change Order in Construction Project, Thesis, Pukyong University, 4. 68-70.
  8. Lee, L. (2012). Study on hybrid approach of deductive case analysis and AHP to explore change orders in construction projects, Thesis, Hanyang University, 17-19.
  9. Lee, J. (2014). A Study on the Improvement Factors of Design Changes through Technical Proposal Tendering Case of Office Buildings, Thesis, Kyonggi University.
  10. Oh, B. (2006). A Study on the Analysis about Cause of based on Case Analysis of Construction Project on the Site-In the Public University Facilities, Thesis, University of Seoul.
  11. Oh, H. (2012). The Identification of Design Elements in Apartment Housing according to Residential Environment Preference-focused on Incheon, Thesis, University of Seoul, 14-20.
  12. Oh, T. (2015). Analyzing the Importance of Change Orders Apartment Projects using AHP, Thesis, Hanyang University, 19-22.
  13. Park, W. (2014). The Establishing Change Management Stategies and Identifying Change Attributes by Project Characteristics, Ajou University, 27-36.
  14. Rim, Y. (2011). The Characteristics of Qualitative Changes of Communal Space Planning in Korean Apartment Complexes, Journal of the Architectural Institute of Korea, 27(3), 253-260.
  15. Seo, J. (2015). A Study on the Case Analysis of Architectura Change Order for the Construction of Public Facilities in Gwangju Metropolitan City, Thesis, Honam University, 4-38.
  16. Shin, C., Nam, H., & Chun, J. (2012). Application of Improvement Process for Building Design Change Support, Journal of the Architectural Institute of Korea, 28(4), 99-106.
  17. Vargs, L.G (1990). An Overview of the analytic hierarchy process and its applications, European Journal of Operational Reserch, 48(1), 2-8. https://doi.org/10.1016/0377-2217(90)90056-H