References
- Kim, D. G, Kim, B. K., "Construction Robot System Design for High-rise Building External Wall Maintenance",Proc. of the 2010 conference on the Korea Institute of Building Construction, November 2010, Vol. 10, No. 2, PP. 7-10
- Kim, D. G., Kim, B. K., "Mock-up House Design Modeling for Development of Intelligent Robotic System for High-rise Building Maintenance", Proc. of the 2011 Conference on the Korea Institute of Building Construction, April 2011, Vol. 31, No. 11, pp.145-146
- Kim, Y. S., Lee, J. H., "A Conceptual Model and Technical/Ecconomical Feasibility Analysis of Apartment Exterior Wall Painting Robot", Journal of the Korea Institute of Building Constrution, September 2006, Vol.22, No.9, pp.139-150
- Ham, Y. B., Lim, B. J., Park, C. D.,M Gu, J. S., Kim, D. G., and Lee, K. J., "Measurement of Vacuum Suction Force on Diversely Configured Vertical Outer Walls of Buildings," International Symposium on Automation and Robtics in Construction, pp. 682-686, 2011.