Abstract
Korean government is promoting "K-Smart City" to overseas market which is an integrated solution of construction industry with ICT(Information and Communciations Technologies) industry. Due to nature of Smart City, construction quality and the development quality of the facilities need to be established to improve the overall quality. However, guidelines and regulations to initiate quality control for Smart City are behind the actual demand. This deficiency is bringing quality control for construction and ICT to be controlled separately causing lack of synergy and resulting in overall quality degradation. This research is designed to improve the construction quality of Smart City during its establishment stage by integrating ICT system with on-site construction (Integrated control center and on-site equipment). The adoption of this research to a real Smart City case had resulted in 22% reduction of construction inspection failure (Audit), and also allowed Construction Company to pre-align quality control of all purchased items of ICT Infra that resulted in 18% reduction of nonconformity, thus contributing to an overall quality improvement. This research is expected to be used widely among all construction industry of Smart City.
정부차원에서 한국형 'K-Smart City'모델을 활용하여 건설과 ICT산업의 융합사업인 해외 Smart City시장 진출을 적극 추진하고 있다. Smart City사업의 특성상 시설물 시공품질과 ICT시스템 개발품질이 동시에 확보되어야 Smart City시설물의 품질향상이 가능하다. 그러나 Smart City사업 특성에 맞는 통합된 품질관리 프로세스 및 가이드가 미흡한 실정이다. 이로인해 국내 실증 프로젝트에서는 건설 품질관리와 ICT 품질관리가 분리된 형태로 관리되어 Smart City시공품질이 저하되는 문제점이 발생되고 있다. 본 연구에서는 Smart City프로젝트 구축단계의 시공품질 향상을 위하여 현장시공(통합운영센터 및 현장설비)과 ICT시스템 개발공정이 융합된 통합품질관리 프로세스를 연구하였다. Smart City사례 프로젝트에 본 연구에서 제안한 통합품질관리 프로세스를 적용한 결과, 시공검측시 시설물 부적합건 발생이 22% 감소하였고, ICT인프라 납품자재의 품질시험을 추가로 실시하여 18%의 부적합 사항을 설치전에 조치하여 시공품질이 향상되는 것을 확인하였다. 본 연구에서 제안한 통합품질관리 프로세스는 향후 Smart City 현장에 활용이 가능할 것으로 기대한다.