DOI QR코드

DOI QR Code

Analysis of Current Collection Performance Testing and Result of 350[km/h] Catenary System

350km/h 전차선로 집전성능 시험 및 결과 분석

  • Heo, Yong-Seok (Dept. of Railroad Electricity system, Woosong University) ;
  • Lee, In-Hee (Dept. of Railroad Electricity system, Woosong University)
  • Received : 2015.09.22
  • Accepted : 2016.01.08
  • Published : 2016.02.01

Abstract

The 350[km/h] catenary system was successfully opened in Honam high speed line. This 350[km/h] catenary system is firstly constructed in South Korea. Therefore the current collection performance of this system should be tested and evaluated by the authority. This paper describes the testings by running of HEMU-430X train and the evaluation criteria and result analysis to determine whether the performance of the catenary is good or not as a verification of catenary-pantograph interface. In detail, the contact force by pantograph, arcs by loss of contact and uplift amount of the catenary support were measured and discussed as a category of the current collection performance.

Keywords

References

  1. Y. Park, S. Y. Kwon, J. M. Kim, "Reliability Analysis of Arcing Measurement System Between Pantograph and Contact Wire", The Transactions of the Korean Institute of Electrical Engineers, Vol. 61, No. 8, pp. 1216-1220, 2012. 08. https://doi.org/10.5370/KIEE.2012.61.8.1216
  2. Y. Park, Y. H. Cho, S. Y. Kwon, K. W. Lee, W. You, "Development of an Arc Detector Assessment System by Loss of Contact Between Pantograph and Contact Wire in Electric Railway", The Transactions of the Korean Institute of Electrical Engineers, Vol. 60, No. 11, 2011. 11.
  3. EN 50317 : 2001, "The European Standard, Railway applications-Current collection systems-Requirements for and validation of measurements of the dynamic interaction between pantograph and overhead contact line", 2001.
  4. EN 50119 : 2001, "Railway applications-Fixed installations-Electric traction overhead contact lines", 2001.
  5. IEC 62486 : 2010, "International Standard, Railway applications-Current collection systems-Technical criteria for the interaction between pantograph and overhead line", 2010.
  6. Y. Park, Y. H. Cho, H.. C. Kim, S. Y. Kwon, I. C. Kim, W. S. Choi, "The Technology of Measurement System for Contact Wire Uplift", 2009 Spring Conference of The Korean Society for Railway, pp. 900-904, 2009. 5.
  7. Y. Park, Y. H .Cho, K. Lee, H. S. Jung, H. Kim, S. Y. Kwon, H. J. Park, "Development of an FPGA-based Online Condition Monitoring System for Railway Catenary Application", WCRR 2008, I.2.1.1, 2008.