과제정보
연구 과제 주관 기관 : 국토교통부
참고문헌
- Bae, B. Y., Kim, K. R., Cha, H. S., & Shin, D. W. (2012). To Improve Production Process of the Modular Using the Conveyor System, Korea Journal of Construction Engineering and Management, 13(5), 103-112
- Cho, B. H., Go, G. Z., & Kim, H. J. (2009). The state of art in the modular construction in Korea, Journal of Korean Society of Steel Construction, 19(1), 112-119
- Kim, T. Y., Park, M. S., Lee, H. S., Suh, S. W., Lee, J. H., & Kim, S. Y. (2013). Optimization Methodology of Modular Unit Factory Production Process Using DSM, Journal of Architecture Institute of Korea, 29(6), 113-122
- Kim, H. C., Hwang, Y. K., & Kim, K. R. (2014). Study on the Application of Multi-skilled labors to Factory Production Process for Securing Economic Feasibility of Modular Unit, Korea Journal of Construction Engineering and Management, 15(1), 11-19 https://doi.org/10.6106/KJCEM.2014.15.1.011
- Lee, C. J., & Lim, S. H. (2013). A Study of the MC design application of modular construction, Journal of the Korea Institute of Ecological Architecture and Environment, 13(6), 121-128
- Lee, D. M., & Chin, S. Y. (2014). An Optimization Algorithm of Gypsum Board Loss for Wall Finishing in Modular Construction System, Korea Journal of Construction Engineering and Management, 15(1), 101-110 https://doi.org/10.6106/KJCEM.2014.15.1.101
- Lee, K. B., Kim, K. R., Shin, D. W., & Cha, H. S. (2011). A Proposal for Optimizing Unit To Improve Production Process of the Modular Using the Conveyor System, Korea Journal of Construction Engineering and Management, 13(5), 103-112 https://doi.org/10.6106/KJCEM.2012.13.5.103
- Lee, J. H., Park, M. S., Lee, H. S., Lee, K. P., & Hyun, H. S. (2015). Application of Activity-Based costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage, Korea Journal of Construction Engineering and Management, 16(4), 139-145 https://doi.org/10.6106/KJCEM.2015.16.4.139