Acknowledgement
Supported by : 한국연구재단
References
- Abdelsayed, M., & Navon, R. (1999). An information sharing, Internet-based, system for project control. CIVIL ENGINEERING SYSTEMS, 16(3), 211-233. https://doi.org/10.1080/02630259908970263
- Abdel Aziz, A. M. (2008). Minimum performance bounds for evaluating contractors performance during construction of highway pavement projects. Construction Management and Economics, 26(5), 507-529. https://doi.org/10.1080/01446190801918748
- Ashton, K. (2009). That 'internet of things' thing. RFiD Journal, 22, 97-114.
- Bernold, L. E. (1990). Bar code-driven equipment and materials tracking for construction. Journal of Computing in Civil Engineering, 4(4), 381-395. https://doi.org/10.1061/(ASCE)0887-3801(1990)4:4(381)
- Bosche, F., & Haas, C. T. (2008). Automated retrieval of 3D CAD model objects in construction range images. Automation in Construction, 17(4), 499-512. https://doi.org/10.1016/j.autcon.2007.09.001
- Briones, L., Bustamante, P., & Serna, M. A. (1994). Wall-climbing robot for inspection in nuclear power plants. In Robotics and Automation, 1994. Proceedings., 1994 IEEE International Conference on (1409-1414). IEEE.
- Bjork, B. C. (1999). Information Technology in Construction-domain definition and research issues. International Journal, 1(1), 3-16.
- Caldas, C. H., Torrent, D. G., & Haas, C. T. (2006). Using global positioning system to improve materials-locating processes on industrial projects. Journal of Construction Engineering and Management, 132(7), 741-749. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(741)
- Cheung, S. O., Suen, H. C., & Cheung, K. K. (2004). PPMS: a web-based construction project performance monitoring system. Automation in construction, 13(3), 361-376. https://doi.org/10.1016/j.autcon.2003.12.001
- Clark, F., & Lorenzoni, A. B. (1996). Applied cost engineering. CRC Press.
- Davidson, I. N., & Skibniewski, M. J. (1995). Simulation of automated data collection in buildings. Journal of computing in civil engineering, 9(1), 9-20. https://doi.org/10.1061/(ASCE)0887-3801(1995)9:1(9)
- DeVault, J. E. (2000). Robotic system for underwater inspection of bridge piers. Instrumentation & Measurement Magazine, IEEE, 3(3), 32-37.
- Eldin, N. N. (1989). Measurement of work progress: Quantitative technique. Journal of construction engineering and management, 115(3), 462-474. https://doi.org/10.1061/(ASCE)0733-9364(1989)115:3(462)
- El-Omari, S., & Moselhi, O. (2011). Integrating automated data acquisition technologies for progress reporting of construction projects. Automation in Construction, 20(6), 699-705. https://doi.org/10.1016/j.autcon.2010.12.001
- Finch, E. F., Flanagan, R., & Marsh, L. E. (1996). Electronic document management in construction using auto-ID. Automation in construction, 5(4), 313-321. https://doi.org/10.1016/S0926-5805(96)00156-2
- Fleming, Q. W., & Koppelman, J. M. (1996). Earned value project management. Project Mangement Institute.
- Ghanem, A. G., & AbdelRazig, Y. A. (2006). A framework for real-time construction project progress tracking. Earth and space, 188(112).
- Halpin, D. W., and Riggs, L. S. (1992). Planning and Analysis of Construction Operation. John Wiley and Sons Inc., USA.
- Howes, N. R. (1984). Managing software development projects for maximum productivity. Software Engineering, IEEE Transactions on, (1), 27-35.
- Huston, D., Esser, B., Miller, J., & Wang, X. (2003). Robotic and mobile sensor systems for structural health monitoring. In Proceedings of the 4th International Workshop on Structural Health Monitoring, Stanford, CA, September (Vol. 1517).
- Hwang, B. G., Zhao, X., & Ng, S. Y. (2013). Identifying the critical factors affecting schedule performance of public housing projects. Habitat International, 38, 214-221. https://doi.org/10.1016/j.habitatint.2012.06.008
- Jung, Y., & Kang, S. (2007). Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management, 133(1), 10-21. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:1(10)
- Kim, C., Son, H., & Kim, C. (2013). Automated construction progress measurement using a 4D building information model and 3D data. Automation in Construction, 31, 75-82. https://doi.org/10.1016/j.autcon.2012.11.041
- Ko, C. H. (2009). RFID-based building maintenance system. Automation in Construction, 18(3), 275-284. https://doi.org/10.1016/j.autcon.2008.09.001
- La Rosa, G., Messina, M., Muscato, G., & Sinatra, R. (2002). A low-cost lightweight climbing robot for the inspection of vertical surfaces. Mechatronics, 12(1), 71-96. https://doi.org/10.1016/S0957-4158(00)00046-5
- Latham, M. (1994). Constructing the team: joint review of procurement and contractual arrangements in the United Kingdom construction industry. Final Rep.
- Lee, D., & Lee, S. (2014), Research of IoT in industrial site, Journal of Advanced Information Technology and Convergence, 12(1), 29-34
- Lee, B. (1996), Improvement of calculating method of Construction progress and completed amount measurement, Construction Economy Research Institute of Korea, 1-59
- Lin, Y. C., Cheung, W. F., & Siao, F. C. (2014). Developing mobile 2D barcode/RFID-based maintenance management system. Automation in Construction, 37, 110-121. https://doi.org/10.1016/j.autcon.2013.10.004
- Love, P. E., Irani, Z., & Edwards, D. J. (2004). Industry-centric benchmarking of information technology benefits, costs and risks for small-to-medium sized enterprises in construction. Automation in construction, 13(4), 507-524. https://doi.org/10.1016/j.autcon.2004.02.002
- Love, P. E., & Irani, Z. (2004). An exploratory study of information technology evaluation and benefits management practices of SMEs in the construction industry. Information & Management, 42(1), 227-242. https://doi.org/10.1016/j.im.2003.12.011
- Lopez, J., Perez, D., Paz, E., & Santana, A. (2013). WatchBot: A building maintenance and surveillance system based on autonomous robots. Robotics and Autonomous Systems, 61(12), 1559-1571. https://doi.org/10.1016/j.robot.2013.06.012
- Navon, R., Goldschmidt, E., & Shpatnisky, Y. (2004). A concept proving prototype of automated earthmoving control. Automation in Construction, 13(2), 225-239. https://doi.org/10.1016/j.autcon.2003.08.002
- Navon, R. (2005). Automated project performance control of construction projects. Automation in Construction, 14(4), 467-476. https://doi.org/10.1016/j.autcon.2004.09.006
- Navon, R. (2007). Research in automated measurement of project performance indicators. Automation in Construction, 16(2), 176-188. https://doi.org/10.1016/j.autcon.2006.03.003
- Metni, N., & Hamel, T. (2007). A UAV for bridge inspection: Visual servoing control law with orientation limits. Automation in construction, 17(1), 3-10. https://doi.org/10.1016/j.autcon.2006.12.010
- Oh, J. K., Jang, G., Oh, S., Lee, J. H., Yi, B. J., Moon, Y. S., & Choi, Y. (2009). Bridge inspection robot system with machine vision. Automation in Construction, 18(7), 929-941. https://doi.org/10.1016/j.autcon.2009.04.003
- Peyret, F., Betaille, D., & Hintzy, G. (2000). High-precision application of GPS in the field of real-time equipment positioning. Automation in Construction, 9(3), 299-314. https://doi.org/10.1016/S0926-5805(99)00058-8
- Poirier, C. C., & McCollum, D. (2006). RFID strategic implementation and ROI: a practical roadmap to success. J. Ross Publishing.
- Sacks, R., Navon, R., & Goldschmidt, E. (2003). Building project model support for automated labor monitoring. Journal of computing in civil engineering, 17(1), 19-27. https://doi.org/10.1061/(ASCE)0887-3801(2003)17:1(19)
- Sacks, R., Navon, R., & Brodetskaia, I. (2006). Interpretation of automatically monitored lifting equipment data for project control. Journal of computing in civil engineering, 20(2), 111-120. https://doi.org/10.1061/(ASCE)0887-3801(2006)20:2(111)
- Saidi, K. S., Lytle, A. M., & Stone, W. C. (2003). Report of the NIST workshop on data exchange standards at the construction job site. In Proc., ISARC-20th Int. Symp. on Automation and Robotics in Construction (617-622). Eindhoven, The Netherlands.
- Schempf, H., Mutschler, E., Goltsbergm, V., & Crowley, W. (2003). Grislee: Gasmain repair and inspection system for live entry environments. The International Journal of Robotics Research, 22(7-8), 603-616. https://doi.org/10.1177/02783649030227009
- Turkan, Y., Bosche, F., Haas, C. T., & Haas, R. (2012). Automated progress tracking using 4D schedule and 3D sensing technologies. Automation in Construction, 22, 414-421. https://doi.org/10.1016/j.autcon.2011.10.003
- Thomas, H. R., & Mathews, C. T. (1986). An analysis of the methods for measuring construction productivity. Construction Industry Institute, University of Texas at Austin [distributor].
- Wakisaka, T., Furuya, N., Inoue, Y., & Shiokawa, T.(2000). Automated construction system for high-rise reinforced concrete buildings. Automation in Construction, 9(3), 229-250. https://doi.org/10.1016/S0926-5805(99)00039-4
- Xu, F., & Wang, X. (2008, July). Design and experiments on a new wheel-based cable climbing robot. In Advanced Intelligent Mechatronics, 2008. AIM 2008. IEEE/ASME International Conference on (418-423). IEEE.
- Yoon, S. (2003), A progress measurement method based on characteristics of work types, Masteral dissertation, Graduate school of Sungkyunkwan University, Seoul.