Acknowledgement
Supported by : LH공사
References
- Bang, J. D., Song, S. H., Coh, G. H., Sohn, J. R., & Kim, J. W. (2015), A Study on Non-working Day Calculation Standards and Days of Non-working for Estimation of Optimum Duration in the Excavation and Foundation Work. Architectural Institute of Korea, 31(7), 19-26
- Bang, J. D., Han, C. H., & Kim, S. k. (2004), Optimization of estimating duration of the structural frame for the high-rise apartment housing during the winter season. Korea Institute of Construction Engineering and Management, 5(6), 170-178
- Corps of Engineers, The contract clause entitled "Default (Fixed-Price Construction)", (ER 415-1-15, 31 Otc 89)
- Jang, M. H., & Yoon, Y.S. (2008), A method of using real-time weather information to manage construction schedule. Architectural Institute of Korea, 24(9), 123-130
- Jeong, S. N., & Lee, H. K. (2003), A study on the method of decision making for the optimal starting time considering the climate elements. Architectural Institute of Korea, 19(5), 113-120
- Oh, Y. I., Sohn, J. R., & Lee, J. H. (2002), A study of construction management for five work days per week, Housing & Urban Research Institute Korea National Housing Corporation
- Korea Meteorological Administration, www.kma.go.kr
- Ministry of Government Legislation, www.moleg.go.kr
- Shin, J. W., Ryu, H. G., Lee, H. S., & Park, M. S. (2007), Probabilistic model to forecast the duration of structural work in high-rise building construction considering weather elements. Architectural Institute of Korea, 23(6), 123-132
- Shin, J. H., Lee, J. A., & Lee, C. S. (2005), The estimation of non-working days for the construction projection project in Incheon region. Korea Institute of Construction Engineering and Management, 6(1), 58-64