Measurements and Data Processing for Blast Vibrations and Air-blasts

발파진동 및 발파소음의 측정 및 자료처리

  • Received : 2015.09.03
  • Accepted : 2015.09.14
  • Published : 2015.09.30

Abstract

Safe blast criteria based on the concept of scaled distances can be obtained from the statistical analysis on measured peak particle velocity data of blast vibrations. Two types of scaled distance widely used in Korea are the square root scaled distance (SRSD) and cube root scaled distance (CRSD). In contrast to SRSD scheme, however, the function of maximum charge per delay for CRSD increases without bound after the intersection point of these two functions despite of the similar goodness of fits. To prevent structural damage that may be caused by the excessive charge in the case of CRSD, it is suggested that CRSD be used within a specified distance slightly beyond the intersection point. On the other hand, there are several attempts that predict vibration level(VL) from the peak particle velocity(PPV) or estimate VL based on the scaled distances without considering their frequency spectra. It appears that these attempts are conducted in blasting contracts only for the purpose of satisfying the environment-related law, which mainly deals with the annoyance aspects of noises and vibrations in human life. But, in principle there could no correlation between peaks of velocity and acceleration over entire frequency spectrum. Therefore, such correlations or estimations should be conducted only between the waves with the same or very similar frequency spectra. Finally, it is a known fact that structural damage due to ground vibration is related to PPV level, the safety level criteria for structures should be defined by allowable PPV levels together with their zero crossing frequencies (ZCF).

측정된 지반진동의 최대입자속도 자료에 대한 통계분석을 통해 환산거리 개념에 기초한 안전발파 설계조건식을 구할 수 있다. 국내에서 널리 사용되는 환산거리에는 자승근 환산거리(SRSD)와 삼승근 환산거리(CRSD)의 두 가지가 있다. 하지만 SRSD와는 대조적으로, CRSD의 장약량 함수는 두 회귀식의 유사한 적합도에도 불구하고 두 함수의 교점을 지나면 기하급수적으로 증가하게 된다. 따라서 CRSD의 지나치게 많은 장약량으로 인해 발생할 지도 모를 구조물의 피해를 방지하기 위해 본 논문에서는 CRSD는 어떤 특정한 거리 이내에서만 사용하도록 제한한다. 한편, 진동의 주파수 스펙트럼에 대한 충분한 고려도 없이 PPV로부터 진동레벨(vibration level; VL)을 예측하거나 환산거리에 따라 VL을 추정하려는 시도들이 있다. 이 시도들은 발파공사 과정에서 소음진동관리법을 충족시키려는 목적으로 이루어지는 것으로 보인다. 소음진동관리법은 생활소음과 생활진동을 주로 취급하고 있다. 그러나 원칙적으로 전체 주파수 스펙트럼 상에서는 속도나 가속도 피크치 사이에는 아무런 상관관계도 존재할 수 없다. 따라서 이러한 상관관계나 추정식의 유도작업은 반드시 동일하거나 매우 유사한 주파수 스펙트럼을 지니는 파동들에 한해서 수행되어야 한다. 끝으로, 구조물의 손상은 PPV 수준과 관련이 있는 것으로 알려져 있으므로 구조물에 대한 지반진동 규제기준에서는 주파수대역별 PPV를 사용하는 것이 바람직하다고 본다.

Keywords

References

  1. 건설교통부, 2003, 암발파 설계 및 시험발파 잠정지침(안).
  2. 건설교통부, 2006, 도로공사 노천발파 설계․시공 지침.
  3. 김일중, 기경철, 조영동, 2009, 발파진동속도와 진동레벨과의 관계식 연구, 화약발파, 제27권 제1호, pp.79-87.
  4. 김일중, 김태섭, 복진승, 2012, 발파진동속도와 진동레벨의 상관성 분석, 2012 대한화약발파공학회 춘계학술발표회 논문집, pp. 87-95.
  5. 송하림, 노영배, 강추원, 2011, 진동레벨과 진동속도의 상관성에 관한 비교연구, 화약발파, 제29권 제2호, pp.43-50.
  6. 양형식, 박경준, 2003, 진동특성에 따른 수직보정 진동레벨의 변환 특성 연구, 화약발파, 제21권 제1호, pp.77-84.
  7. 원연호 외, 2010, 진동레벨과 진동속도의 상관성 분석 등에 관한 연구, 환경부 중앙환경분쟁조정위원회 연구보고서, 원앤비 기술사사무소.
  8. 이준구, 이창용, 2011, 경제학 원론 제4판, 법문사, pp.31-33.
  9. 최병희, 류창하, 2012, 지반진동 규제기준에서 진동레벨과 진동속도의 상호관계에 대한 고찰, 화약발파(대한화약발파공학회지), 제30권 제2호, pp.1-8.
  10. 최병희, 류창하, 정주환, 2010, 제어발파설계에서 자승근 및 삼승근 환산거리 기법의 적용한계에 대한 고찰, 화약발파(대한화약발파공학회지), 제28권 제1호, pp.27-39.
  11. 최형빈, 2012, 발파환경 진동레벨 기준척도의 시공단계 적용사례 연구, 2012 대한화약발파공학회 추계학술발표회 논문집, pp.87-103.
  12. Ambraseys, N.R. and A.J. Hendron, 1968, Dynamic Behavior of Rock Masses, Rock Mechanics in Engineering Practice (K.G. Stagg and O.C. Zienkiewicz, eds.), John Wiley & Sons, Inc., London, pp.203-227.
  13. Attewell, P.B., I.W. Farmer and D. Haslam, 1965, Prediction of Ground Vibration Parameters from Major Quarry Blasts, Mining and Minerals Engineering, Dec., pp.621-626.
  14. Bhandari, S., 1997, Engineering Rock Blasting Operations, A.A. Balkema, Rotterdam, Brookfield, pp.302-304.
  15. Blair, B.E. and W.I. Duvall, 1954, Evaluation of Gages for Measuring Displacement, Velocity and Acceleration of Seismic Pulses, USBM RI 5073, p.21.
  16. Davies, B., I.W. Farmer and P.B. Attewell, 1964, Ground Vibration from Shallow Subsurface Blasts, The Engineer, Mar. 7, pp.553-559.
  17. Devine, J.F., 1962, Vibration Levels from Multiple Holes per Delay Quarry Blasts, Earthquake Notes, Vol. XXXIII, Sep. pp.32-39.
  18. Devine, J.F. and W.I. Duvall, 1963, Effect of Charge Weight on vibration Levels for Millisecond Delayed Quarry blasts, Earthquake Notes, Vol. XXXIV, Jun. pp.17-24.
  19. Dowding, C.H., 1971, Response of Buildings to Ground Vibrations Resulting from Construction Blasting, Ph.D. Thesis, Univ. of Illinois at Urbana Champaign, p.204.
  20. Dowding, C. H., 1996, Construction vibrations, Prentice Hall Inc., Upper Saddle River, NJ 07458, US, p.84.
  21. Duvall, W.I. and B. Petkof, 1959, Spherical Propagation of Explosion-Generated Strain Pulses in Rock, USBM RI 5483, p.1-20.
  22. Ghosh, A. and J.J.K. Daemen, 1983, A Simple New Vibration Predictor (Based on Wave Propagation Laws), 24th US Symp. on Rock Mech., Texas, pp.151-157.
  23. Gustafsson, R., 1973, Swedish Blasting Technique, SPI, Gothenburg, Sweden, pp.211-221.
  24. Habberjam, J.M. and J.T. Whetton, 1952, On the Relation between Seismic Amplitude and Charge of Explosive Fired in Routine Blasting Operation, Geophysics, 17(1), pp.116-128. https://doi.org/10.1190/1.1437728
  25. Langefors, U. and B. Kihlstrom, 1963, The Modern Technique of Rock Blasting, 3rd. ed., John Wiley & Sons Inc., New York, p.285-288.
  26. Morris, G., 1950, Vibrations due to Blasting and Their Effects on Building Structure, The Engineer, London, pp.394-395.
  27. Nicholls, H.R., C.F. Johnson and W.I. Duvall, 1971, Blasting Vibrations and Their Effects on Structures, USBM Bulletin 656, p.105.
  28. Pal Roy, P., 1991, Prediction and Control of Ground Vibrations due to Blasting, Colliery Gaurdian, 239(7), pp.215-210.
  29. Siskind, D.E., M.S. Stagg, J.W. Kipp and C.H. Dowding, 1980a, Structure Response and Damage Produced by Ground Vibration from Surface Mine Blasting, USBM RI 8507, pp.9-17.
  30. Siskind, D.E., V.J. Stachura, M.S. Stagg, and J.W. Kopp, 1980b, Structure Response and Damage Produced by Airblast From Surface Mining, USBM RI 8485, p.111.
  31. Siskind, D.E., 2000, Vibrations from Blasting, ISEE, Cleveland, OH USA, pp.14-15, pp.17-28.
  32. Snodgrass, J.J. and D.E. Siskind, 1974, Vibrations from Underground Blasting, USBM RI 7937, p.31