DOI QR코드

DOI QR Code

실사격 시험시스템의 효율적인 개발을 위해 안전도 반영을 통해 개선된 시스템 성숙도 모델에 관한 연구

On an Enhanced Model of System Readiness Level by Incorporating Safety for the Development of Live Fire Test Systems

  • 예성혁 (국방과학연구소 제8기술연구본부) ;
  • 이재천 (아주대학교 시스템공학과)
  • Ye, Sung Hyuck (8th Research and Development Institute, Agency for Defense Development) ;
  • Lee, Jae-Chon (Dept. of Systems Engineering, Ajou University)
  • 투고 : 2015.07.20
  • 심사 : 2015.09.23
  • 발행 : 2015.09.30

초록

The live fire test has been playing a critical role in evaluating the goals-to-meet of the weapon systems which utilize the power of explosives. As such, the successful development of the test systems therein is quite important. The test systems development covers that of ranges and facilities including system-level key components such as mission control, instrumentation or observation, safety control, electric power, launch pad, and so on. In addition, proper operational guidelines are needed with well-trained test and operation personnel. The emerging weapon systems to be deployed in future battle field would thus have to be more precise and dynamic, smarter, thereby requiring more elaboration. Furthermore, the safety consideration is becoming more serious due to the ever-increasing power of explosives. In such a situation, development of live fire test systems seems to be challenging. The objective of the paper is on how to incorporate the safety and other requirements in the development. To achieve the goal, an architectural approach is adopted by utilizing both the system components relationship and safety requirement when advanced instrumentation technology needs to be developed and deteriorated components of the range are replaced. As an evaluation method, it is studied how the level of maturity of the test systems development can be assessed particularly with the safety requirement considered. Based on the concepts of both systems engineering and SoS (System-of-Systems) engineering process, an enhanced model for the system readiness level is proposed by incorporating safety. The maturity model proposed would be helpful in assessing the maturity of safety-critical systems development whereas the costing model would provide a guide on how the reasonable test resource allocation plan can be made, which is based on the live fire test scenario of future complex weapon systems such as SoS.

키워드

참고문헌

  1. W. D Bell (2010), "Systems Engineering Test and Evaluation - The Integration Process." ITEA Journal, Vol 31:56-62
  2. B. Simmons (2012), "T&E-The speed of need.", ITEA Journal, Vol 33:5-8
  3. M. T. Reynolds (1996), "Test and Evaluation of complex.", Wiley
  4. DoD (1993), "Request for coordination on revised Live Test and Evaluation (LFT&G) Guidelines.", pp 1-10
  5. DoD (2012), "Test and Evaluation Management Guide.", 6th Ed. pp 191-195
  6. DAPA (2012), "Systems Engineering Guidebook.", pp 25-63, pp 191-195
  7. S. H. Ye and J.-C. Lee (2014), "Model -Based Architecture Design of the Range safety process for live fire test with enhanced safety. " Korea Safety Management & Science, 14:43-52
  8. D. Hinton (2014), "The DoD Test&Evaluation /Science & Technology(T&E/S&T) Program.", NDIA Annual S&E Tech., Conference
  9. B. J. Yoo et al. (2012), "Systems Engineering based Live Fire Test of Weapon systems." KIMST, Vol 15 :28-35
  10. C. H. Ryu et al. (2010), "A study on the CMMI Engineering process area modeling of test process." KIMST, Vol 13(2) :235-242
  11. R. B. Magnaye et al. (2010), "System Development Planning Using Readiness Levels in a Cost of Development Minimization Model." Systems Engineering Vol 13(4) :311-323.
  12. B. J. Sauser et al. (2008), "A System Approach to Expanding the Technology Readiness Level within Defense Acquisition." Int. J. of Defense Acquisition Management, Vol 1: 39-58
  13. J. H, Kim and Y. W Park (2010), "Development of the System Technical Maturity Assessment Model for Defense R&D Programs Decision Support.", KIMST Vol 13(5):808-817,
  14. M.A. Lundteigen and M. Rausand (2009), "Architectural constraints in IEC 61508: Do they have the intended effect?" Reliability Engineering and System Safety, Vol 94: 520-525. https://doi.org/10.1016/j.ress.2008.06.003
  15. C. A. Ericson, II (2005), "Hazard Analysis Techniques for system safety," John Wiley & Sons, Inc.,
  16. I. L. Kwon and J.-C. Lee (2013), "On an improved method system readiness assessment to meet required operational capability in weapon system development." J. of academia-industrial technology Vol. 14 (8) : 3602-3610
  17. S. H. Ye and J.-C. Lee (2015), "On multiple ETA-based Test framework to enhanced safety maturity of live fire tests for weapon system.", Korea Safety Management & Science, Vol. 17:75-84 https://doi.org/10.12812/ksms.2015.17.1.75