참고문헌
- Robot van der Meulen, Janessa Rivera (2015), "Gartner Says Worldwide Semiconductor Sales Expected to Reach $358 Billion in 2015, a 5.4 Percent Increase From 2014" Stamford, Conn. January 14, 2015, http://www.gartner.com/newsroom/id/2962117.
- Tae-Eog Lee (2008), "A review of scheduling theory and methods for semiconductor manufacturing cluster tools", in Proceedings of 2008 winter simulation, pp. 2127-2135.
- Ja-Hee Kim, Tae-Eog Lee (2003), "Schedule stabilization and robust timing control for time-constrained cluster tools", in Proceedings of 2003 IEEE International Conference on Automation Science and Engineering (CASE), pp. 1039-1044.
- Ja-Hee Kim, Mengchu Zhou, Tae-Eog Lee (2014), "Schedule restoration for single-armed cluster tools", Semiconductor Manufacturing, IEEE Transactions on, vol. 27, no. 3, pp. 388-399. https://doi.org/10.1109/TSM.2014.2315871
- Younghun Ahn, James R. Morrison (2010), "Analysis of circular cluster tools: transient behavior and semiconductor equipment methods", in Proceedings on Automation Science and Engineering, pp. 39-44.
- Hong-Yue Jin, James R. Morrison (2013), "Transient scheduling of single armed cluster tools: algorithms for wafer residency constraints", in Proceedings of 2013 IEEE International Conference on Automation Science and Engineering (CASE), pp. 856-861.
- Tae-Kyu Kim, Chihyun Chung, Tae-Eog Lee (2012), "Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation", International Journal of Production Research, vol. 5, no. 10, pp. 2785-2795.
- Jong In Chai, Yang Byung Park (2010), "A study on throughput increase in semiconductor package process of K manufacturing using a simulation model", Journal of the Korea Society for Simluation, vol. 19, no. 1, pp. 1-11.
- Geun-Cheol Lee, Seong-Hoon Choi (2011), "A simulation study on capacity planning in hybrid flowshops for maximizing throughput under a budge contraint", Journal of the Korea Society for Simulation, vol.20, no. 3, pp. 1-10. https://doi.org/10.9709/JKSS.2011.20.3.001
- Yil-Seug Park, Chil-Gee Lee (2002), "Conveyor capability for semiconductor diffusion area", Journal of the Korea Society for Simulation, vol. 11, no. 3, pp. 59-65.
- Bong-Ju Jeong, Yun-Jun Lee, Seung-Bae Shim (1999), "Performance analysis of scheduling rules in semiconductor wafer fabrication", Journal of the Korea Society for Simulation, vol. 8, no. 3, pp. 49-66.
- Woo Seok Kim, Youn Han Jeon, Doo Yong Lee (2009), "High-fidelity simulation of integrated single-wafer processing tools for evaluation of scheduling algorithms", Robotics and Computer-Integrated Manufacturing, vol.25, no. 1, pp. 107-121. https://doi.org/10.1016/j.rcim.2007.10.003
- Ja-Hee Kim (2003), Scheduling and timing control of time-constrained cluster tools, PhD Thesis.