Risk Critical Point (RCP): A Quantifying Safety-Based Method Developed to Screen Construction Safety Risks

  • Received : 2014.02.17
  • Accepted : 2015.08.31
  • Published : 2015.09.30

Abstract

Risk assessment is an important phase of risk management. It is the stage in which risk is measured thoroughly to achieve effective management. Some factors such as probability and impact of risk have been used in the literature related to construction projects. Because in high-rise projects safety issues are paramount, this study has tried to develop a quantifying technique that takes into account three factors: probability, impact and Safety Performance Index (SPI) where the SPI is defined as the capability of an appropriate response to reduce or limit the effect of an event after its occurrence with regard to safety pertaining to a project. Regarding risk-related literatures which cover an uncertain subject, the proposed method developed in this research is based on a fuzzy logic approach. This approach entails a questionnaire in which the subjectivity and vagueness of responses is dealt with by using triangular fuzzy numbers instead of linguistic terms. This method returns a Risk Critical Point (RCP) on a zoning chart that places risks under categories: critical, critical-probability, critical-impact, and non-critical. The high-rise project in the execution phase has been taken as a case study to confirm the applicability of the proposed method. The monitoring results showed that the RCP method has the inherent ability to be extended to subsequent applications in the phases of risk response and control.

Keywords

References

  1. Aneziris, O. N., Papazoglou, I. A., and Kallianiotis, D. (2010), Occupational risk of tunneling construction, Safety Science, 48, 964-972. https://doi.org/10.1016/j.ssci.2009.11.003
  2. Aneziris, O. N., Topali, E., and Papazoglou, I. A. (2011), Occupational risk of building construction, Reliability Engineering and System Safety, doi:10.1016/ j.ress.2011.11.003.
  3. Baker, S., Ponniah, D., and Smith, S. (1999), Risk response techniques employed currently for major projects, Construction Management and Economics, London, 7(2), 205-213.
  4. Caponecchia, C. and Sheils, I. (2011), Perceptions of personal vulnerability to workplace hazards in the Australian construction industry, Journal of Safety Research, 42, 253-258. https://doi.org/10.1016/j.jsr.2011.06.006
  5. Carbonari, A., Giretti, A., and Naticchia, B. (2011), A proactive system for real-time safety management in construction sites, Automation in Construction, 20, 686-698. https://doi.org/10.1016/j.autcon.2011.04.019
  6. Chapman, R. J. (2001), The controlling influences on effective risk identification and assessment for construction design management, International Journal of Project Management, 19, 147-160. https://doi.org/10.1016/S0263-7863(99)00070-8
  7. Chenyun and Zichun, Y. (2012), The BP Artificial Neural Network Model on Expressway Construction Phase Risk, Systems Engineering Procedia, 4, 409-415. https://doi.org/10.1016/j.sepro.2012.01.004
  8. Deng, Y., Sadiq, R., Jiang, W., and Tesfamariam, S. (2011), Risk analysis in a linguistic environment: A fuzzy evidential reasoning-based approach, Expert Systems with Applications, 38, 15438-15446. https://doi.org/10.1016/j.eswa.2011.06.018
  9. El-Sayegh, S. M. (2007), Risk assessment and allocation in the UAE construction industry, International Journal of Project Management, doi:10.1016/j.ijproman.2007.07.004.
  10. Fouladgar, M. M., Yazdani-Chamzini, A., and Zavadska, E. K. (2012), Risk evaluation of tunneling projects, International Journal of Civil and Mechanical Engineering, 12, 1-12. https://doi.org/10.1016/j.acme.2012.03.008
  11. Fung, I. W. H., Lo, T. Y., and Tung, K. C. F. (2011), Tung Towards a better reliability of risk assessment: Development of a qualitative and quantitative risk evaluation model (Q2REM) for different trades of construction works in Hong Kong, International Journal of Accident Analysis and Prevention, AAP-2470.
  12. Fung, I. W. H., Tam, V. W. Y., Lo, T. Y., and Lu. L. L. H. (2010), Developing a Risk Assessment Model for construction safety, International Journal of Project Management, 28, 593-600. https://doi.org/10.1016/j.ijproman.2009.09.006
  13. Gangolells, M., Casals, M., Forcada, N., Roca, X., and Fuertes, A. (2010), Mitigating construction safety risks using prevention through design, Journal of Safety Research, 41, 107-122. https://doi.org/10.1016/j.jsr.2009.10.007
  14. Guofeng, W., Min W., and Weiwei, Z. (2011), Study on the Existing Problems and Countermeasures of Project Risk Management in China, Energy Procedia, 13, 2726-2733. https://doi.org/10.1016/S1876-6102(14)00454-8
  15. Gurcanli, G. E. and Mungen, U. (2008), An occupational safety risk analysis method at construction sites using fuzzy sets, International Journal of Industrial Ergonomics, doi:10,1016/j.ergon.2008.10.006.
  16. Kaming, P. F., Olomolaiye, P. O., Holt, G. D., and Harris, F. C. (1997), Factors influencing construction time and cost overruns on high-rise projects in Indonesia, Construction Management and Economics, 15, 83-94. https://doi.org/10.1080/014461997373132
  17. KarimiAzari, A., Mousavi, N., Mousavi, S. F., and Hosseini, S. B. (2011), Risk assessment model selection in construction industry, Expert Systems with Applications, 38, 9105-9111. https://doi.org/10.1016/j.eswa.2010.12.110
  18. Kucukali, S. (2011), Risk assessment of river-type hydropower plants using fuzzy logic approach, Energy Policy, 39, 6683-6688. https://doi.org/10.1016/j.enpol.2011.06.067
  19. Lee, A. H. I. (2009), A fuzzy supplier selection model with the consideration of benefits, opportunities, costs and risks, Expert systems with Applications, 36, 2879-2893. https://doi.org/10.1016/j.eswa.2008.01.045
  20. Lee, L. W. and Chen, S. M. (2008), Fuzzy risk analysis based on fuzzy numbers with different shapes and different deviations, Expert Systems with Applications, 34, 2763-2771. https://doi.org/10.1016/j.eswa.2007.05.009
  21. Lin, W., Yaqi, L., and Enmao, W. (2011), Research on Risk Management of Railway Engineering Construction, Systems Engineering Procedia, 1, 174-180. https://doi.org/10.1016/j.sepro.2011.08.029
  22. Mohammad, S., Mojtahedi , H., Mousavi, S. M., and Makui, A. (2010), Project risk identification and assessment simultaneously using multi-attribute group decision making technique, Safety Science, 48, 499-507. https://doi.org/10.1016/j.ssci.2009.12.016
  23. Nieto-Morote, A. and Ruz-Vila, F. (2011), A fuzzy approach to construction project risk assessment, International Journal of Project Management, 29, 220-231. https://doi.org/10.1016/j.ijproman.2010.02.002
  24. Pinto, A., Nunes, I. L., and Ribeiro, R. A. (2011), Occupational risk assessment in construction industry-Overview and reflection, Safety Science, 49, 616-624. https://doi.org/10.1016/j.ssci.2011.01.003
  25. Roisenberg, M., Schoeninger, C., and da Silva, R. R. (2009), A hybrid fuzzy-probabilistic system for risk analysis in petroleum exploration prospects, Expert Systems with Applications, 36, 6282-6294. https://doi.org/10.1016/j.eswa.2008.07.060
  26. Saifullah, N. M. and Ismail, F. (2012), Integration of Occupational Safety and Health during Preconstruction Stage in Malaysia, Procedia-Social and Behavioral Sciences, 35, 603-610. https://doi.org/10.1016/j.sbspro.2012.02.127
  27. Sousa, R. and Einstein, H. H. (2012), Risk analysis during tunnel construction using Bayesian Networks: Porto Metro case Study, Tunneling and Underground Space Technology, 27, 86-100. https://doi.org/10.1016/j.tust.2011.07.003
  28. Stroeve, H. S., Blom, H. A. P., and Bakker, G. J. (2009), Systemic accident risk assessment in air traffic by Monte Carlo simulation, Safety Science, 47, 238-249. https://doi.org/10.1016/j.ssci.2008.04.003
  29. Xiao-mei, G. and Xiao-jun, L. (2011), Application of Entropy Measurement in Risk Assessment of the Engineering Project of Construction-agent System, Systems Engineering Procedia, 1, 244-249. https://doi.org/10.1016/j.sepro.2011.08.038
  30. Xu, Y., Yeung, J. F. Y., Chan, A. P. C., Chan, D. W. M., Wang, S. Q., and Ke, Y. (2010), Developing a risk assessment model for PPP projects in China-A fuzzy synthetic evaluation approach, Automation in Construction, 19, 929-943. https://doi.org/10.1016/j.autcon.2010.06.006
  31. Zadeh, L. A. (1965), Fuzzy sets. Information and Control, 8, 338-353. https://doi.org/10.1016/S0019-9958(65)90241-X
  32. Zayed, T., Amer, M., and Pan, J. (2007), Assessing risk and uncertainty inherent in Chinese highway projects using AHP, International Journal of project management, doi:10.1016/j.ijproman.2007.05.12.