참고문헌
- Y.K. Kim (2002) MJ81 Electrical point machine, Korea Railroad Technology, 33, pp. 44-50.
- J.Y. Park, W.S. Hong, B.R, Jeon (2007) Railroad signalling Engineering, Dong-il press, Seoul. pp. 96-132.
- J.H. Baek, Y.K. Kim, D. Shin, K.M. Lee (2009) The Localized development of single phase MJ81 Switch point machine, KIEE Summer conference 2009, Muju, Korea, pp. 1881-1882.
- S.B. Lee, J.S. Choi, B.G. Kim, T.H. Lee (2012) A study on core function for design of the electrical point machine, 2012 Autumn conference of the Korean Society for Railway, Gyoungju, Korea, pp. 1562-1573.
- Y.K. Kim, J.H. Baek, Y.H. Lee (2004) Turnout motor analysis for speed augmentation, KIEE Summer conference 2004, Busan, Korea, pp. 1454-1456.
- Y.K. Kim (2007) Technology review on the train control system of recent TGV high speed line, Korea Railroad Technology, 12, pp. 60-69.
- J.K. Lee, S.H. Choi (2013) A study on cause-consequence analysis of hydraulic switch machine, 2013 Spring Conference of the Korean Society for Railway, Yongpyoung, Korea, pp. 1054-1060.
- Y.K. Kim (2007) In terms of train control system, feature analysis of concrete bed turnout used in high speed line, Korea Railroad Technology, 11, pp. 52-58.
- Y.K. Kim, J.H. Lee (2007) Review on turnout operation speed of the TGV-Est concrete bed in France, Korea Railroad Technology, 15, pp. 46-51.
- J.H. Ryu (2008) A development of more reliable mechanical position switch for railway point, M.S thesis, Seoul National Univsersity of Technology.
- SNCF (1995) Mecanismes cales de manoeuvre electrique d'aiguillage, Notice generale EF, 5 B 24 No 2. France.
- J.Y. Park (2009) The study of monitoring system for enhancement electrical point-machine maintenance, Journal of the Korea Academia- Industrial Cooperation Society, 10(11), pp. 3115-3120. https://doi.org/10.5762/KAIS.2009.10.11.3115
- Y.K. Kim (2011) Research report for finding a way to prevent point machine disabilities of Gyoungbu High speed line stage 2, Korea Rail Network Authority, pp. 2-45.
- Y.K. Kim (2007) Technical advisory report of signaling equipment maintenance in high speed line, Korail, pp. 25-86.
- Y.K. Kim (2007) Research report for constructing signal system's optimum method to improve the speed in conventional line, The Ministry of Construction and Transportation, pp. 780-990.
- J.H. Baek, Y.K. Kim (2009) The site installation test of single-phase MJ81 switch point machine localization, Journal of the Korea Academia- Industrial Cooperation Society 10(12), pp. 3632-3637. https://doi.org/10.5762/KAIS.2009.10.12.3632
- SNCF (1983) Controleurs d'application de verrouillage, Notice generale EF, 5 B 22 No 2, France.
피인용 문헌
- Stress Detection of Railway Point Machine Using Sound Analysis vol.5, pp.9, 2016, https://doi.org/10.3745/KTSDE.2016.5.9.433