DOI QR코드

DOI QR Code

Risk Analysis and Responding Strategies in Tender Stage for Successful Construction Project in China

중국건설시장에서의 성공적인 발주를 위한 입찰단계 리스크 분석 및 대응방안

  • Received : 2015.04.02
  • Accepted : 2015.07.01
  • Published : 2015.07.30

Abstract

Although the depression of oversea construction market becomes more serious recent years, asian construction market is relatively dynamic, particularly in china. However, few research has been conducted about how to manage construction projects in china as foreign developers. Risk management is surely important for the success of a construction project conducted by a foreign developer in the country due to differences of systems as well as regulations. Important risks were identified by series of expert interviews and surveys using the WBS-RBS method, namely tender max. price error, bill of quantities error, inappropriate contract type etc, after explaining construction cost estimation method in China. Then, several risk responding strategies suggested by experienced experts are proposed. The results will be in the interests for those that are likely conduct construction projects in china as foreign bodies.

Keywords

References

  1. Cha, H., & Shin, G. (2006). Risk Assessment Methodology By Analyzing Degree of Perception for Project Characteristic Factors on Cost Performance. Architectural Institute of Korea, 22, 125-132.
  2. Choi, H. (2013). Current Status of China Construction Industry and Strategic Participation Plan of Korea Construction Companies. Thesis, Inha University.
  3. Jang, D., & Kim, J. (2004). A Study of the Construction Management Applied to SSG Expansion Project in Shenzhen, China. Korea Institute of Construction Engineering and Management.
  4. Jang, R., Yoo, B., Lee, Y., & Kim, J. (2009). A Study on the Analyzing Risk Factors in Chinese Construction Projects using AHP. Architectural Institute of Korea, 25, 287-294.
  5. Ji, S,. Koo, K., & Hyun, C. (2011). Development of Safety Management Index for Contractor Assessment in Bidding Process. Korea Institute of Construction Engineering and Management, 6, 3-13.
  6. Jung, D., Lee, J., & Cho, Y. (2000). A Study on the Architectural Design Practitioners' Attitude and Method about the Construction Cost Saving. Proceeding of Architectural Institute of Korea, 20(1), 136-142.
  7. Kim, J., & Kim, Y. (2014). An Analysis of Concentrate Competency in Bidding Process for Overseas Project of Domestic Construction Companies. Korea Institute of Construction Engineering and Management, 15, 23-30.
  8. Lee, C., Yoo, Y., & Yoon, H. (2013). Risk Analysis of the Chinese Market for Domestic CM Company. Korea Institute of Construction Engineering and Management, Proceeding of National College Students Conference, 4, 127-130.
  9. Lee, M. (2006). The Dispute Resolution Method on The FIDIC Form of Construction Projects. The Korean Association of Arbitration Studies, 16(2), 239-264.
  10. Lee, Y., & Shin, J. (1996). A Study on the Analysis for Construction Cost Control System Establishment. Korean Society of Civil Engineers, 2, 261-264.
  11. Liu, A., Lee, K., Lee, C., & Han, S. (2014). Institutional Risk Factors of Chinese Construction Market in View of International Contractors. Korea Society of Civil Engineers, 10, 1577-1578.
  12. Park, K. (2005). The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure. Journal of the Korea Institute of Building Construction, 5, 97-103.
  13. Park, K., Chun, J., & Roh, D. (1999). A Study on the Cost Risk Management Method in the Apartment Housing Construction. Architectural Institute of Korea, 4, 141-149.
  14. Shin, D., & Park, C. (2000). An Analysis of Preparation and Evaluation Practice of Building Construction Plan Documents at the Bidding Stage. Architectural Institute of Korea, 16, 95-103.
  15. Yoo, W., Hyeon, C., Moon, H., & Kim, J. (2011). Contractual Risk Evaluation Model for International Construction Projects using FIDIC Silver Book. Architectural Institute of Korea, 27, 159-168.