References
- Aamodt, A., and Plaza, E. (1994). "Case-based reasoning: Foundational issues, methodological variations, and system approaches. " AI communications, 7(1), pp. 39-59.
- An, S, H., and Lee, W, H. (2012). "Case-based Reasoning Model for Building Construction Cost Management by using Risk Analysis." Journal of the Architectural Institute of Korea, 28(10), pp. 157-164.
- Bu-Qammaz, A. S., Dikmen, I., and Birgonul, M. T. (2009). "Risk assessment of international construction projects using the analytic network process." Canadian Journal of Civil Engineering, 36(7), pp. 1170-1181. https://doi.org/10.1139/L09-061
- Cho, K, R. (2002). "Case-Based System as a Knowledge Sharing Scheme and Problem Solving." Korean Association for Educational Information and Broadcasting, 8(4), pp. 33-63.
- Choi, S., Kim, D. Y., Han, S. H., and Kwak, Y. H. (2013). "Conceptual cost-prediction model for public road planning via rough set theory and case-based reasoning." Journal of Construction Engineering and Management, 140(1).
- Chung, Y, I. (2007). "Forecasting the Profitability of International Construction Projects Using Case Based Reasoning." YONSEI UNIVERSITY. Master's thesis. 2007.
-
Financial Supervisory Service. (2014). 2014 Small & Medium Company Credit Rating Result and Future Plant.
(Nov. 20, 2014) - Gunhan, S., and Arditi, D. (2005). "Factors affecting international construction." Journal of construction engineering and management, 131(3), pp. 273-282. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(273)
- Han, S. H., and Diekmann, J. E. (2001). "Approaches for making risk-based go/no-go decision for international projects." Journal of Construction Engineering and Management, 127(4), pp. 300-308. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:4(300)
- Han, S. H., and Kim, D. Y.. (2006). "Risk-based Profit Prediction Model for International Construction Projects." Journal of Korea Society of Civil Engineers, 26(4D), pp. 635-647.
- Han, S. H., Diekmann, J. E., and Ock, J. H. (2005). "Contractor's risk attitudes in the selection of international construction projects." Journal of Construction Engineering and Management, 131(3), pp. 283-292. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(283)
- Han, S. H., Kim, D. Y., and Kim, H. (2007). "Predicting profit performance for selecting candidate international construction projects." Journal of Construction Engineering and Management, 133(6), pp. 425-436. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:6(425)
- Han, S. H., Sun, S. M., and Ryu, H. D. (2003). "Analysis of Critical Factors on the Causes of Profitability in International Construction Proejcts." Journal of Korea Society of Civil Engineers, 23(2D), pp. 235-247.
- Jang W, S., Yang H, B., and Han, S. H.. (2014). "Development of Evaluation System for Overseas Business Capability of Construction Firms." Journal of Korea Society of Civil Engineers, pp. 977-987.
- Jung, W., Han, S. H., Park, H., and Kim, D. Y. (2010). "Empirical assessment of internationalization strategies for small and medium construction companies." Journal of construction engineering and management, 136(12), pp. 1306-1316. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000237
- Kim B, I., Kim, D. Y., and Han, S. H.. (2008). "Supporting Market Entry Decisions For Global Expansion Using Option + Scenario Planning Analysis." Korean Journal of Construction Engineering and Management, KICEM, 10(5), pp. 135-147.
- Kim, D. Y., Ashuri, B., and Han, S. H. (2012). "Financial valuation of investments in international construction markets: Real-options approach for market-entry decisions." Journal of Management in Engineering, 29(4), pp. 355-368. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000152
- Kim, D. Y., Han, S. H., Kim, H., and Park, H. (2009). "Structuring the prediction model of project performance for international construction projects: A comparative analysis." Expert Systems with Applications, 36(2), pp. 1961-1971. https://doi.org/10.1016/j.eswa.2007.12.048
- Kim, G. H., An, S. H., and Kang, K. I. (2004). "Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning." Building and environment, 39(10), pp. 1235-1242. https://doi.org/10.1016/j.buildenv.2004.02.013
- Kim, M. J., Moon, H. S., and Kang, L. S. (2013). "Development of an Approximate Cost Estimating Model for Bridge Construction Project using CBR Method." Korean Journal of Construction Engineering and Management, 14(3), pp. 42-52. https://doi.org/10.6106/kJCEM.2013.14.3.042
- Ko, Y, I. (2000). On the Corporate Bankruptcy Prediction Model using the Credit Anaysis of Small and Medium Companies, CHOSUN UNIVERSITY, Mater's thesis.
-
Korea Development Institute (2010). Deterioration of Financial Strength Rating of Construction industry,
(May. 7, 2010) - Kwak, S, N. Kim, D, Y. Kim, B, I. Choi, S. and Han S, H. (2009)."Cost Prediction Models in the Early Stage of the Roadway Planning and Design based on Limited Available Information." Korean Journal of Construction Engineering and Management, KICEM, 10(4), pp. 87-100.
- Lee, J, K. (2015). A "win-win" project performance in the international construction focusing on subcontractor prespective. YONSEI UNIVERSITY, Master's thesis. 2015.
- Ryu, H. G., Lee, H. S., and Park, M. (2007). "Construction planning method using case-based reasoning (CONPLA-CBR)." Journal of Computing in Civil Engineering, 21(6), pp. 410-422. https://doi.org/10.1061/(ASCE)0887-3801(2007)21:6(410)
- Yildiz, A. E., Dikmen, I., Birgonul, M. T., Ercoskun, K., and Alten, S. (2014). "A knowledge-based risk mapping tool for cost estimation of international construction projects." Automation in Construction, 43, pp. 144-155. https://doi.org/10.1016/j.autcon.2014.03.010