DOI QR코드

DOI QR Code

TPM과 COQ 프로세스에서 시간동인 ABC시스템의 활용

Application of Time-Driven Activity-Based Costing(TDABC) for Total Productive Maintenance(TPM) and Cost of Quality(COQ) Processes

  • 최성운 (가천대학교 산업공학과)
  • Choi, Sungwoon (Department of Industrial Engineering, Gachon University)
  • 투고 : 2014.10.20
  • 심사 : 2015.03.15
  • 발행 : 2015.03.31

초록

This study introduces the methods to apply and develop the integrated Cost of Quality (COQ) and Time-Driven Activity-Based Costing (TDABC) model for seeking not only quality improvement but also reduction of overhead cost. Inefficient and uneconomical COQ activities can be identified by using time driver which also maximizes the quality improvement for Prevention-Appraisal- Failure (PAF) quality costs. In contrast, reduction of the indirect cost of unused capacity resource using Quality Cost Capacity Ratio (QCCR) of TDABC minimizes overhead cost for COQ activities. In addition, linkage between Overall Equipment Effective (OEE) and Time Driver develops the integrated system of Total Productive Maintenance (TPM) and TDABC model. Lean OEE maximizes when an Unused Time (UT) of TDABC that are TPM losses and lean wastes reduces whereas the TPM Cost Capacity Ratio (TCCR) of TDABC minimizes indirect cost for non-value added TPM activities. Numerical examples are derived to better understand the proposed COQ/TDABC model and TPM/TDABC model from this paper. From the proposed model, process mapping and time driver of TDABC are known to lessen indirect cost from general ledger of comprehensive income statement with a better quality innovation and improvement of equipment.

키워드

참고문헌

  1. Adeoti A.A., Valverde R. (2014), "Time-Driven Activity-Based Costing for the Improvement of IT Service Operations", International Journal of Business and Management, 9(1):109-128.
  2. Barret R. (2005), "Time-Driven Costing : The Bottom Line on the New ABC", Business Performance Management, March : 35-39.
  3. Bruggerman W., Everaert P. (2007), "Time-Driven Activity-Based Costing : Exploring the Underlying Model", Cost Management, 21(2) : 16-19.
  4. Bruggerman W., Everaert P., Levant Y., Saens G., Anderson S. (2008), "Cost Modeling in Logistics Using Time-Driven ABC : Experiences from a Wholesaler", International Journal of Physical Distribution & Logistics Management, 38(3) : 179-191.
  5. Bryon K., Everaert P., Lauwers L., Van Meensel J. (2009), "Time-Driven Activity-Based Costing for Supporting Sustainable Decisions in Pig Production", Working Paper, Ghent University.
  6. Campanella J. (1999), Principles of Quality Costs : Principles, Implementation and Use, ASQ Quality Press.
  7. Cardinaels E., Labro E. (2008), "On the Determinants of Measurement Error in Time-Driven Costing", The Accounting Review, 83(3) : 735-756. https://doi.org/10.2308/accr.2008.83.3.735
  8. Choi S. (2012), "Development and Implementation of Chain Metrics for Obtaining Lean Overall Equipment Effectiveness Using Availability Measures", Journal of Korea Safety Management and Science, 14(2):147-158. https://doi.org/10.12812/ksms.2012.14.2.147
  9. Choi S. (2014), "Development of Integrated System of Time-Driven Activity-Based Costing Using Balanced Scorecard and Economic Value Added", Journal of Korea Safety Management and Science, 14(4):451-469.
  10. Demeere N., Stouthuysen K., Roodhooft F. (2009), "Time-Driven Activity-Based Costing in a Outpatient Clinic Environment : Development, Relevance and Managerial Impact", Health Policy, 92(2-3):296-304. https://doi.org/10.1016/j.healthpol.2009.05.003
  11. Dewi D.S., Di Mascio R., Van Voorthuysen E.J. (2012), "Application of Time Driven Activity Based Costing to an Industrial Service Provider", Proceedings of the Asia Pacific Industrial Engineering & Management System Conference, 1960-1967.
  12. Everaert P., Bruggeman W., De Creus G. (2008), "Sanac Inc. : From ABC to Time-Driven ABC(TDABC) : An Instructional Case", Journal of Accounting Education, 26:118-154. https://doi.org/10.1016/j.jaccedu.2008.03.001
  13. Everaert P., Gleuren G., Hoozee S. (2012), "Using Time-Driven ABC to Identify Operational Improvements : A Case Study in a University Restaurant", Cost Management, 26(2):41-48.
  14. Fladkjaer H., Jensen E. (2011), "The ABC-Paradox : Is Time Driven ABC Relevant for Small and Medium Sized Enterprises?", Working Paper, Aalborg University, 2:1-23
  15. Hon J., Chu S. (2012), "Implementation of Time-Driven Activity-Based Costing : A Case Study of Aerospace Precision Casting Factory", Proceedings of the Asia Pacific Industrial Engineering & Management Systems Conference, 426-435.
  16. Hoozee S., Bruggeman W. (2010), "Identifying Operational Improvements During the Design Process of a Time-Driven ABC System : The Role of Collective Worker Participation and Leadership Style", Management Accounting Research, 21:185-198. https://doi.org/10.1016/j.mar.2010.01.003
  17. Kaplan R.S., Anderson S. (2004), "Time-Driven Activity-Based Costing", Harvard Business Review, 82:131-138.
  18. Kaplan R.S., Anderson S. (2007), Time-Driven Activity-Based Costing : A Simpler and More Powerful to Higher Profits, Harvard Business School Press.
  19. Lee J. (2011), "Time-Driven ABC Model as a Tool of Strategic Decision Making : Case Study on Cost Accounting", POSRI Business Review, 11(2):5-29.
  20. Max M.(2007), "Leveraging Process Documentation for Time-Driven Activity Based Costing", Journal of Performance Management, 20(3):16-28.
  21. Mielcarek J.(2012), "Falsification of Time-Driven Activity-Based Costing and Instead What?", Working Paper, The Poznan Banking School, 1(14):1-27.
  22. Ozyurek H., Dinc Y. (2014), "Time-Driven Activity Based Costing", International Journal of Business and Management Studies, 6(1):97-117.
  23. Pernot E., Roodhooft F., Van den Abbeele A. (2007), "Time-Driven Activity-Based Costing for Inter-Library Services : A Case Study in a University", The Journal of Academic Librarianship, 33(5):551-560. https://doi.org/10.1016/j.acalib.2007.06.001
  24. Riccardo G., Caterina V., Paola Miolo V. (2011), "Time-Driven Activity-Based Costing and Capacity Cost Management : The Case of a Service Firm", Cost Management, July(August):6-16.
  25. Rchild D., Bouksour O., Beidouri Z.(2013), "The Activity Based Costing Method Opportunity to Assess and Master the Aircraft Maintenance Service Cost for Third Party : A Case Study", International Journal of Computer Science Issues, 10(1):699-706.
  26. Sailaja A., Basak P.C., Visuanadhan K.G.(2013), "Activity Based Cost Management : An Effective Tool for Quality Performance Measurement in Manufacturing Industries", International Journal of Scientific & Engineering Research, 4(1):1-9.
  27. Schiffauerova A., Thomson V. (2006), "A Review of Research on Cost of Quality Models and Best Practices", International Journal of Quality and Reliability Management, 23(6):647-669. https://doi.org/10.1108/02656710610672470
  28. Stout D.E., Propri J.M., "Implementing Time-Driven Activity-Based Costing at a Medium-Sized Electronics Company", Management Accounting Quarterly, 12(3):1-11. https://doi.org/10.2308/jmar.2000.12.1.1
  29. Suzuki T. (1994), TPM in Process Industries, Productivity Press.
  30. Tanis V.N., Ozyapici H. (2012), "The Measurement and Management of Unused Capacity in a Time Driven Activity Based Costing System", Journal of Management Accounting Research, 10(2) : 43-55.
  31. Terungwa A. (2013), "Time-Driven Activity-Based Costing and Effective Business Management : Evidence From Benue State, Nigeria", International Journal of Finance and Accounting, 2(6):297-306.
  32. Tsai W. (1998), "Quality Cost Measurement Under Activity-Based Costing", International Journal of Quality & Reliability Management, 15(7) : 719-152. https://doi.org/10.1108/02656719810218202
  33. Wu X., Wang Y., Yue D., Sun Z. (2011), "Modeling and Error Analysis of Time-Driven Activity-Based Costing", International Conference of Industrual Engineering and Engineering Management, (1) : 401-405.