DOI QR코드

DOI QR Code

Development and Utilization of Mine Management Software: A Review

광산관리 소프트웨어의 개발 현황 및 활용사례 분석

  • 박세범 (부경대학교 에너지자원연구소) ;
  • 최요순 (부경대학교 환경해양대학 에너지자원공학과)
  • Received : 2015.05.14
  • Accepted : 2015.06.03
  • Published : 2015.06.30

Abstract

This study examined and analyzed several mine management software programs developed in domestic and oversea countries. In the oversea countries, many companies have developed and commercialized mine management softwares such as Dispatch, $Cat^{(R)}$ $MineStar^{TM}$ and FARA. These softwares provide many functionalities including real-time machine tracking, machine assignment optimization, productivity management, equipment health monitoring and remote control. For the domestic cases, this study reviewed two software programs (i.e., GEMISIMS, Truck-Shovel fleet optimization) developed by several researchers because there is no mine management software currently commercialized in Korea. In addition, this paper reports the two cases at the Jwaneng mine in Botswana and at the Robinson mine in United States where mine management software programs are used to support mine operations.

본 연구에서는 국내외에서 개발된 광산관리 소프트웨어들을 조사하고 그 특징을 분석하였다. 해외에서는 다수의 기업들이 Dispatch, $Cat^{(R)}$ $MineStar^{TM}$, FARA 등과 같은 광산관리 소프트웨어를 개발하고 상용화하였다. 이 소프트웨어들은 실시간 장비 추적, 장비 할당 최적화, 생산량 관리, 장비 상태 모니터링, 원격조종과 같은 기능을 제공한다. 국내에서는 현재까지 상용화된 광산관리 소프트웨어는 없다. 일부 연구자들에 의해 GEMISIMS, Truck-Shovel fleet optimization 등의 소프트웨어가 개발되었으나, 다소 제한적인 기능만을 제공하고 있다. 추가적으로 본 논문에서는 보츠와나 Jwaneng 광산과 미국 Robinson 광산에서 광산관리 소프트웨어를 도입하여 활용한 사례를 조사하여 그 결과를 제시하였다.

Keywords

References

  1. Aksoy, M. and Yalcin, E., 2000, A computer program for open pit mine equipment selection: ruckMac, In: Panagiotou, G.N. and Michalakopoulos, T.N. (eds), Mine Planning and Equipment Selection 2000, Balkema, Rotterdam, Netherlands, 499-503.
  2. Choi, Y., 2011, New software for simulating truck-shovel operation in open pit mines, Journal of the Korean Society for Geosystem Engineering, Vol. 48, No. 4, 448-459.
  3. Choi, Y. and Nieto, A., 2011, Software for simulating open-pit truck/shovel haulage systems using Google Earth and GPSS/H, Journal of the Korean Society for Geosystem Engineering, Vol. 48, No. 6, 734-743.
  4. Ercelebi, S.G. and Bascetin, A., 2009, Optimization of shovel-truck system for surface mining, The Journal of the Southern African Institute of Mining and Metallurgy, Vol. 109, 433-439.
  5. Krause, A. and Musingwini, C., 2007, Modelling open pit shovel-truck systems using the machine repair model, The Journal of the Southern African Institute of Mining and Metallurgy, Vol. 107, 469-476.
  6. Modular Mining Systems, 2011, Case study: Jwaneng improves productivity by 13%, increases profits, http://modularmining.com/cat-media/case-studies/, 1-4. (Accessed at 10 May 2015).
  7. Oraee, K. and Asi, B., 2004, Fuzzy model for truck allocation in surface mines, In: Hardygora, M., Paszkowska, G. and Sikora, M. (eds), Mine Planning and Equipment Selection 2004, Taylor & Francis Group, London, UK, 585-591.
  8. Park, B., Choi, Y. and Park, H.S., 2013, Creation of vector network data with considering terrain gradient for analyzing optimal haulage routes of dump trucks in open pit mines, TUNNEL & UNDERGROUND SPACE, Vol. 23, No. 5, 353-361. https://doi.org/10.7474/TUS.2013.23.5.353
  9. Park, S. and Choi, Y., 2013, Simulation of shovel-truck haulage system by considering truck dispatch methods, Journal of the Korean Society for Geosystem Engineering, Vol. 50, No. 4, 543-556.
  10. Park, S., Choi, Y. and Park, H.S., 2014a, Simulation of shovel-truck haulage system in open-pit mines by considering breakdown of trucks and crusher capacity, TUNNEL & UNDERGROUND SPACE, Vol. 24, No. 1, 1-10. https://doi.org/10.7474/TUS.2014.24.1.001
  11. Park, S., Choi, Y. and Park, H.S., 2014b, Simulation of truck-loader haulage systems in an underground mine using GPSS/H, TUNNEL & UNDERGROUND SPACE, Vol. 24, No. 6, 430-439. https://doi.org/10.7474/TUS.2014.24.6.430
  12. Park, S., Lee, S., Choi, Y. and Park, H.S., 2014c, Development of a windows-based simulation program for selecting equipments in open-pit shovel-truck haulage systems, TUNNEL & UNDERGROUND SPACE, Vol. 24, No. 2, 111-119. https://doi.org/10.7474/TUS.2014.24.2.111
  13. Yan, S. and Lai, W., 2007, An optimal scheduling model for ready mixed concrete supply with overtime considerations, Automation in Construction, Vol. 16, No. 6, 734-744. https://doi.org/10.1016/j.autcon.2006.12.009

Cited by

  1. Collecting Travel Time Data of Mine Equipments in an Underground Mine using Reverse RFID Systems vol.26, pp.4, 2016, https://doi.org/10.7474/TUS.2016.26.4.253