References
- Aksoy, M. and Yalcin, E., 2000, A computer program for open pit mine equipment selection: ruckMac, In: Panagiotou, G.N. and Michalakopoulos, T.N. (eds), Mine Planning and Equipment Selection 2000, Balkema, Rotterdam, Netherlands, 499-503.
- Choi, Y., 2011, New software for simulating truck-shovel operation in open pit mines, Journal of the Korean Society for Geosystem Engineering, Vol. 48, No. 4, 448-459.
- Choi, Y. and Nieto, A., 2011, Software for simulating open-pit truck/shovel haulage systems using Google Earth and GPSS/H, Journal of the Korean Society for Geosystem Engineering, Vol. 48, No. 6, 734-743.
- Ercelebi, S.G. and Bascetin, A., 2009, Optimization of shovel-truck system for surface mining, The Journal of the Southern African Institute of Mining and Metallurgy, Vol. 109, 433-439.
- Krause, A. and Musingwini, C., 2007, Modelling open pit shovel-truck systems using the machine repair model, The Journal of the Southern African Institute of Mining and Metallurgy, Vol. 107, 469-476.
- Modular Mining Systems, 2011, Case study: Jwaneng improves productivity by 13%, increases profits, http://modularmining.com/cat-media/case-studies/, 1-4. (Accessed at 10 May 2015).
- Oraee, K. and Asi, B., 2004, Fuzzy model for truck allocation in surface mines, In: Hardygora, M., Paszkowska, G. and Sikora, M. (eds), Mine Planning and Equipment Selection 2004, Taylor & Francis Group, London, UK, 585-591.
- Park, B., Choi, Y. and Park, H.S., 2013, Creation of vector network data with considering terrain gradient for analyzing optimal haulage routes of dump trucks in open pit mines, TUNNEL & UNDERGROUND SPACE, Vol. 23, No. 5, 353-361. https://doi.org/10.7474/TUS.2013.23.5.353
- Park, S. and Choi, Y., 2013, Simulation of shovel-truck haulage system by considering truck dispatch methods, Journal of the Korean Society for Geosystem Engineering, Vol. 50, No. 4, 543-556.
- Park, S., Choi, Y. and Park, H.S., 2014a, Simulation of shovel-truck haulage system in open-pit mines by considering breakdown of trucks and crusher capacity, TUNNEL & UNDERGROUND SPACE, Vol. 24, No. 1, 1-10. https://doi.org/10.7474/TUS.2014.24.1.001
- Park, S., Choi, Y. and Park, H.S., 2014b, Simulation of truck-loader haulage systems in an underground mine using GPSS/H, TUNNEL & UNDERGROUND SPACE, Vol. 24, No. 6, 430-439. https://doi.org/10.7474/TUS.2014.24.6.430
- Park, S., Lee, S., Choi, Y. and Park, H.S., 2014c, Development of a windows-based simulation program for selecting equipments in open-pit shovel-truck haulage systems, TUNNEL & UNDERGROUND SPACE, Vol. 24, No. 2, 111-119. https://doi.org/10.7474/TUS.2014.24.2.111
- Yan, S. and Lai, W., 2007, An optimal scheduling model for ready mixed concrete supply with overtime considerations, Automation in Construction, Vol. 16, No. 6, 734-744. https://doi.org/10.1016/j.autcon.2006.12.009
Cited by
- Collecting Travel Time Data of Mine Equipments in an Underground Mine using Reverse RFID Systems vol.26, pp.4, 2016, https://doi.org/10.7474/TUS.2016.26.4.253