참고문헌
- Doo, S. G. (2010, 05). [Issue Diagnosis]Eradication Measure Preparation 'Urgent' of Apartment House Lawsuit Increase, The Journal of Construction & Economy Research Institute of Korea, 7-9.
- Go, S. S, & Lee, H. M. (2006). Modeling of Apartment Defect Management System applying UML. Journal of the Architectural Institute of Korea, Structure & Construction, 22(7), 123-130.
- Hur, S. H., Kim, Y. A., Hwang, M. H., & Kim, Y. S. (2010). A Study on the Criterion to Evaluate the Defect of Appearance Caused by Concrete Crack on the Apartment House. Journal of the Architectural Institute of Korea, Structure & Construction, 26(4), 103-112.
- Kim, B. S., Park, J. M., Choi, J. H., Seo, D. S., & Kim, O. K. (2011). Comparative Analysis on Repairing Cost of Lawsuit on Concrete Crack Defect in Apartment Building. Korean Journal of Construction Engineering and Management, 12(6), 142-150. https://doi.org/10.6106/KJCEM.2011.12.6.142
- Kim, D. H., Song, H., & Go, S. S. (2007). A Study on the Defect Division System according to Work Type of Apartment House through Tenant Preliminary Research. Journal of the Architectural Institute of Korea, Structure & Construction, 23(2), 127-134.
- Kim, I. U. (2011). Study about business process development of urban renaissance through BPMN modeling. Master's dissertation, University of Soongsil, Seoul.
- Kim, J. H. (2012). A business process model for legislative bills procedure based on BPMN. Master's dissertation, University of Soongsil, Seoul.
- Kim, J. W., Ryu, H. K., Son, B. S., & Choi, Y. K. (2010). Business Process Model for Urban Regeneration Project using BPMN Modeling Method. Korea Institute of Construction Engineering and Management, 11(4), 41-50.
- Lee, J. B., & Choi, H. H. (2003). A Study on Database System for a Community Dwelling House Defects. Hongik Faculty Journal, Research Institute of Industrial Technology Hongik University, 13, 55-69.
- Lee, K. J. (2014). Study on Improvement of Apartment Housing Defect Judgment System based in Judicial Precedent Cases. Doctoral dissertation, University of Hanyang, Seoul.
- Oh, J. H., Song, Y. W., Choi, Y. K, & Lim, H. C. (2009). Business Process Improvement of Defect Management in Apartment Housing Project. Korean Journal of Construction Engineering and Management, 10(5), 16-27.
- Park, J. M., Kim, O. K., & Kim, J. L. (2011). Revitalization of the Conciliation System for Defect Disputes Related to Apartment Buildings On the Technical Issue. Journal of the Korea Institute of Building Construction, 11(3), 208-220. https://doi.org/10.5345/JKIC.2011.06.3.208
- Seo, D. S., & Cho, K. R. (2008). A Study on the Direction of Defect lawsuit Solutions on Apartment Buildings from Resident's Respect. Journal of the Architectural Institute of Korea, Structure & Construction, 24(6), 119-126.
- Seo, H. S. (2013). A Study on the Risk Factors and Management Plan through Analyzing the law cases of Defect Disputes in Apartment Building. Doctoral dissertation, University of Yeungnam, Daegu.
- Shin, Y. S., Yoo, W. S., Kim, D. Y., Cho, H. H., & Kang, K. I. (2009). Factor Analysis on Defect Repair and Maintenance Cost for Asset Management of Apartment Housing. Journal of the Architectural Institute of Korea, Structure & Construction, 25(6), 179-186.
- Thomas, A. (2010). The Introduction of BPMN 2.0 Business Process Modeling (The First Edition). Ansan: dbBADAMedia (dbBADA).
- Yoo, H. K., An, S. H., & Kang, K. I. (2005). The Improvement of Repair Work Process in Apartment House's Defect by Analyzing Inhabitant Satisfaction. Journal of the Architectural Institute of Korea, Structure & Construction, 21(4), 149-156.