DOI QR코드

DOI QR Code

Introduction of RAMS and Certificate Process for Railway System based on International Standard and Practices

국제표준기반의 철도 RAMS와 인증 프로세스 소개 및 그 적용사례

  • Published : 2015.06.30

Abstract

The RAMS Process is the Internationally required activity to secure Reliability, Availability, Maintainability, and Safety of system which will be acquired as customer requirements. The importance are situations that have been growing gradually. Specially, When developing railway system, the needs of customer about RAMS Process has been being proposed in a variety of railroad business. Through this paper, It introduces the international standards described the RAMS Process and also presents the requirements that should have to comply with it. Furthermore, the necessary activities to get certificate of a Railway system are suggested and not only the various acquisition cases of certificate but also lessons learned by cases in the field of railway signalling system are presented.

Keywords

References

  1. Duckho Shin and six others, A Study on the Safety Demonstration of Train Control System, Journal of the KRA, Article 9 No. 4, pp. 412-418, 2006
  2. IEC 61508, Functional Safety of Electrical/Electronic/Programmable Electronic Safety-related Systems (E/E/PE, or E/E/PES), IEC, 2010
  3. IEC 62278, Railway applications-Specification and demonstration of reliability, availability, maintainability and safety(RAMS), IEC, 2002
  4. IEC 62279, Railway applications-Communications, signaling and processing systems-Software for railway control and protections systems, IEC, 2002
  5. IEC 62425, Railway applications-Communications, signaling and processing systems-Safety related electronic systems for signaling, IEC, 2007
  6. http://www.energytimes.kr/news/articleView.html?idxno=27515
  7. http://www.ddaily.co.kr/news/article.html?no=122372
  8. http://m.pmnews.co.kr/a.html?uid=5286
  9. http://www.ddaily.co.kr/news/article.html?no=100947
  10. Chanhoe Han and two others, Gyeongbu high-speed railway construction project Phase II- A study on the RAMS Activities of CTC System. The Korean Society For Railway, 2012
  11. http://www.edaily.co.kr/news/NewsRead.edy?SCD=JC11&newsid=02725686606120736&DCD=A00301&OutLnkChk=Y