DOI QR코드

DOI QR Code

강관압입후 슬롯 홀을 갖는 비개착 터널공법의 현장적용에 관한 연구

A Study on Sites Application of Non-open-cut Tunnel Method with Slot Holes in Steel Pipe Pumping

  • 채영석 (우송대학교 건축공학과) ;
  • 송관권 (동북대학자원여토목공정학원) ;
  • 민인기 (우송정보대학 철도토목과)
  • Chae, Young-Suk (Department of Architecture Engineering, Woosong University) ;
  • Song, Kwan-Kwon (Department of Civil Engineering, North Eastern University) ;
  • Min, In-Ki (Department of Railroad and Civil Engineering, Woosong Information University)
  • 투고 : 2014.10.03
  • 심사 : 2014.12.26
  • 발행 : 2015.02.28

초록

In the study, a new non-open cut tunnel steel pipe method using slot hole has been developed. As is overcomes shortcomings of conventional methods, it is applied to the field. The main concept of the new method is the steel pipe pumping system with slot holes which, by means of formation slot holes between each steel pipe, applied to the magnitude of the relaxed earth pressure caused by excavation to the ground to prevent ground displacement. The stability of the support members and effect of displacement control of the new method were verified through several ways as numerical analysis and site test. The new method was applied to the construction of a 11.5m wide, 7.4m high and 50m long section that passes side subway and large buildings in inner city. By applying the new method, tunnel construction was successfully completed in 6 months. It decreases the construction period to 30% compared to that of conventional methods, and ground was almost negligible.

키워드

참고문헌

  1. KCI, "Concrete Structure Design Criteria" pp.79-82, 2013.
  2. Korean Expressway Co., "Road Design", KRTA, 2013.
  3. KICT, "Road Design Book", MOLIT, Soil and Drainage, pp.408-21-408-24, 2000.
  4. C. C. Torres and C. Fairhurst, "Application of the Convergence-confinement Method of Tunnel Design to Rock Masses That Satisty the Hock-Brown Failure Criterion", 2000.
  5. Y. Muraki, "The Umbrella Method in Tunnelling" Ph.D Dissertation, Massachusetts Institute of Technology. 1997.
  6. T. S. Kim, B. K. Sim, K. S. Lee and I. M. Lee, "Effect of Presssurized Groutting on Pullout Resistance and Group Effect of Compression Ground Anchor", Journal of Korean Geotechnical Society, Vol.26, No.6, pp.5-19, 2000.
  7. G. Carrieri, A. Dedonati, P. Grasso, A. Mahtab and S. Peliza, "Ground Improvement for Rapid Advance of Lonato Road Tunnel near Verona, Italy., Proc. 8th Canadian Tunnelling Conference", Vancover, pp.243-254, 1990.
  8. KSCE, Structure Design and Construction, Seoul Metropolitan City, 1999.